Constructability Challenges for Perimeter Control Blasting and Slope Development in Shale and Other “Weak” RocksBy D. J. Scarpato
"Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed-for; however, all t
Jan 1, 2015
-
Constructing A Project In MexicoBy K. A. McDonald
This paper will describe the experiences of Hibernia Holdings, Inc. in constructing a mineral processing facility in Mexico. It will attempt to set forth a guideline on what companies attempting to op
Jan 1, 1994
-
ConstructionThe writing that is effective is woven with a he texture into an agreeable pattern; it is free from knots, loose threads, and stray fluff. The instrument that weaves this literary fabric, whether it p
Jan 1, 1931
-
ConstructionBy T. A. Rickard
The writing that is effective is woven with a fine texture into an agreeable pattern; it is free from knots, loose threads, and stray fluff. The instrument that weaves this literary fabric, whether it
Jan 1, 1931
-
Construction and Maintenance of Underground Mine RoadsBy Seedsman R. W
Good roads are essential in moving men and materials to and from the underground workplace. Coffey Partners International Pty Ltd (Coffey) has recently completed a underground coal industry funded p
Jan 1, 1995
-
Construction and Utilization of a Field Data Sheet for Consideration of Rock Engineering Problems in Underground Hard Rock Mining.By Radford B. Langston
Mining Methods Majority of Production Ramp and Fill at Stillwater, Sub-level Becoming More Important Production at East Boulder from Sub-level l Majority JM REEF ROCK TYPES NORITE - plagioclase
May 1, 2002
-
Construction Labour Relations in the Mining IndustryBy W. J. Gibson
"This paper will provide a general assessment of the differences in construction and industrial labour relations. From this outline will come a detailed examination of labour relations in the construc
Jan 1, 1972
-
Construction Management of Hydrogeological Aspects of Melbourne City Link ProjectBy I A. Lamb
The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two
Jan 1, 1999
-
Construction of a Geometallurgical Model, How it should Interact with the Plant Model and the Importance of Final ReconciliationBy Orlando Rojas, Javier Pizarro, Romke Kuyvenhoven, Francisco Soto
"The concept of geometallurgy has been extensively mentioned and used in the mining industry in the past years. However, each mining firm has a different understanding of what geometallurgy means, and
Jan 1, 2016
-
Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New ZealandBy N Wharmby
In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled pipelines projects that have required access shafts. Often these shafts are in urban environmentswh
Mar 8, 2011
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
Construction of Oroville Dam - A Material Handling ChallengeBy Robert Walker
The win theme of this session is Unique Material Handing Systems. The theme was selected because of two major factors. 1. Accomplishments of unique character manage to attract interest regardless o
Jan 1, 1970
-
Construction of Sherritt's ConcentratorsBy J. A. MacLellan
"CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design
Jan 1, 1972
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
May 11, 2007
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op
Jun 13, 2021
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMsBy P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo
The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.
Jan 1, 2005
-
Construction of the West Area CSO Tunnels and Pumping StationBy Ray Hutton, Darrell Liebno, Taro Nonaka
Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont
Jan 1, 2007
-
Construction Phase Services for Australian and North American SEM Tunneling - NAT2024By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim
Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s
Jun 23, 2024
-
Construction Technique Used To Build The Drilled Shafts For The Victory BridgeBy T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005