Search Documents

Sort by

  • IMPC
    Developing a process flow for the recovery of gold ores in the Philippine small-scale mining industry

    By Reinol Compañero, Ivy Gonzales, Herman Mendoza, Brian Buenaventura

    "The extraction of gold in the Philippines has been a significant challenge for the past decades. Around 70-75% of gold mined in the country can be accounted from the small-scale mining industry which

    Jan 1, 2014

  • CIM
    Developing a Standardized Approach to Shaft Inspections

    By S. Hopkins, R. Preston, S. Gillis

    "This paper examines typical visual inspections of operational soft rock mine shafts and discusses some of the challenges involved, many of which are associated with inconsistent inspection practices.

    Jan 1, 2019

  • AUSIMM
    Developing a TSF design concept – experience helps but numbers don’t lie

    By L D. Munro, S A. Jackson

    This paper provides a logical approach to developing a TSF design concept through: • Identifying key properties of tailings and containment structures; • Reviewing underlying principles for effective

    Jul 1, 2021

  • SME
    Developing a Virtual Reality Environment for Mining Research

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • SME
    Developing a virtual reality environment for mining research (ME)

    By Brendan Demich, Brendan Macdonald, Timothy J. Orr, Jason Navoyski, Jennica L. Bellanca, William J. Helfrich

    Recent advances in computing, rendering and display technologies have generated increased accessibility to virtual reality. Virtual reality allows for the creation of dynamic, high-fidelity environmen

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • SME
    Developing an Information System to Choose Abandoned Mine Sites for Reclamation

    By E. K. Albert

    Title IV of the 1977 Surface Mining Control and Reclamation Act (SMCRA) provides for an abandoned mine reclamation fund. This fund, taken from fees collected from operating coal mines, provides capita

    Jan 1, 1990

  • CIM
    Developing an Interactive, Collaborative Virtual Underground Mine to Support Mine Emergency Response Excercises

    By Tony Szwilski

    Using Unity 3D as a collaborative multi-user virtual on-line environment, an interactive virtual underground mine platform (IVUMP) is being developed to provide on-line access to mine safety preparedn

    Aug 1, 2013

  • CIM
    Developing and Equipping No. 4 Winze, San Antonio Mine

    By W. S. Hegler

    Introduction The San Antonio mine is on the north shore of Rice lake, thirty miles east of lake Winnipeg and 120 miles northeast of the city of Winnipeg. Since production was started in 1932, about

    Jan 1, 1949

  • SME
    Developing And Implementing An Enterprise Reliability Strategy (ERS) In Mining Operations

    By J. W. Davis

    In the last few years major industrial companies have begun to realize the importance of Reliability as an enterprise strategy that, properly implemented, will improve financial performance. Typical

    Jan 1, 2003

  • AUSIMM
    Developing and maintaining mine site ventilation capability and new trends in mine ventilation career paths

    By D J. Brake

    The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5

    Oct 12, 2022

  • SME
    Developing and Testing an Optimization Algorithm for Practical Open-Pit Pushback Design

    By Juan L. Yarmuch, Hyam Rubinstein

    Open-pit mine planning is a key process in the definition of mineral reserves and their efficient removal. Ore in open-pit mines is extracted bymining sequential pits called pushbacks. Pushbacks need

    Jun 25, 2023

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    Developing Canada?s North - The New Challenge

    By Jesse L. Duke

    Outline ?Understanding the context ?The Business, political, social and legal environment ?Recipes for Success (three Ps) ?Develop effective Partnerships/relationships ?Plan carefully ?Actively

    May 1, 2006

  • CIM
    Developing Declines Under a Moving Glacier - The Kumtor Underground Access Story

    By Darren Medd

    Kumtor Gold Company (KGC) currently operates the 500,000 tonnes per day Kumtor open pit gold mine located in the Issyk-Kul region of the Kyrgyz Republic at an elevation of more than 4,000 m. To supple

    Aug 1, 2013

  • AIME
    Developing Emission Control Strategies For A Coal-Fired Power Plant – A Case History

    By Young C. Kim, Francis Martino, Ish Chopra

    For the past two and one-half years, various emission control strategies were jointly developed by the University of Arizona and the Homer City Owners to com- ply with the clean air requirements at it

    Jan 1, 1983

  • SME
    Developing Functional Baselines

    By William W. Edgerton

    Establishing geotechnical baselines on soft ground projects that require the use of closed-face tunnel boring machines (TBMs) is difficult. It is hard to see the face when mining and the excavated mat

    Jan 1, 2012

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • SME
    Developing Information Management And Systems Analysis Procedures For Abandoned Mine Lands Site Selection

    By E. K. Albert

    In 1977, Congress enacted Title IV of the Surface Mining Control and Reclamation Act (SMCRA), providing for an "abandoned ml.ne reclamation fund". This fund, taken from a fee collected from operating

    Jan 1, 1990

  • SME
    Developing Innovative Technology

    By Terry McNulty

    There are many potential pitfalls in the commercialization of innovative technology. The failures often are remembered longer than the successes, thereby serving as deterrents to subsequent attempts.

    Jan 1, 1998