Search Documents

Sort by

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • SME
    Development Of The San Manuel Oxide Ore Reserve ? Present And Future

    By M. F. Vancas

    The San Manuel oxide ore reserve ranges in depth from being exposed on the surface to lying 1000 ft. beneath a conglomerate layer all of which is confined in the subsidence zone of an active sulfide b

    Jan 1, 1987

  • CIM
    Development of the Science of Grinding

    By L. E. Djingheuzian

    "IntroductionDURING the past two decades an enormous amount of empirical data has been accumulating on grinding. These data have been obtained by mill operators on grinding ores with a diversity of ch

    Jan 1, 1952

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • SME
    Development Of The Twin Buttes Mine For Production ? Introductory - Scope of the Paper

    By J. B. Knaebel

    I have been asked to discuss the "Development of the Twin Buttes Mine for Production." This property, which is a large low-grade open pit copper mine about 25 miles south of Tucson, Arizona, was recen

    Jan 1, 1970

  • SME
    Development Of The Wiseda 220 Ton Rear Dump Hauler

    By A. E. Hunt

    Over the past twenty-live years since large scale truck haulage in open-pit mining began, the periodic introduction of Larger capacity vehicles has provided increased productivity and reduced costs.

    Jan 1, 1983

  • SME
    Development Of Western Coal From A Legislator's Viewpoint

    By Robert L. Stroup

    Let me open my remarks this morning by stating how we as legislators and as natives of the western coal-producing states feel about our role in becoming one of the major producers of coal-related ener

    Jan 1, 1976

  • AUSIMM
    Development Options for the Eyre Peninsula Magnetite – An Owner’s Perspective

    By J White

    The Eyre Peninsula (EP) has been known for its iron ore for more than a century. Edward John Eyre noted the ironstone outcrop at what is now Iron Knob in the 19th century. Sir Douglas Mawson visited a

    Jul 11, 2011

  • AUSIMM
    Development Philosophy

    By Bruington T, Perkins J, Hutton R

    Natural resource developments are among the largest and most challenging projects taking place in the world. They involve capital intensive investment with long lead times and the management of geo

    Jan 1, 1997

  • CIM
    Development Problems and Techniques in the Fort St. John Natural Gas Area

    By F. G. Vetsch, F. A. Ronaghan

    "Introduction1N THE FALL of 1951, Peace River Allied Fort St. John No. 1 well was drilled in Lsd. 1, Section 9 Township 83, Range 18, West of the 6th Meridian, on the flats of the north side of Peace

    Jan 1, 1954

  • AUSIMM
    Development Strategy of the Trident Underground Gold Mine

    Avoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas

    Jan 1, 2008

  • ABM
    Development Tapered Plate On Gerdau Plate Mill

    By Antônio Augusto Gorni, Fabio Adriano da Silva, Emanuelle Garcia Reis, Afrânio Márcio Costa

    Gerdau Ouro Branco´s plate mill started the operation in 2016 with high level technology. Stands out the capacity to produce different thicknesses in a same plate, therefore allowing special service f

    Oct 1, 2019

  • CIM
    Development Trend of Underground Rock Support

    By C. C. Li

    Traditionally, strong and stiff devices, such as fully encapsulated rebar bolts and concrete lining and arches, are preferred for underground rock support. The attention is paid to the strength of the

    Jan 1, 2015

  • AIME
    Development Work With Trackless Equipment

    By Elmer A. Jones

    Development work in mines of St. Joseph Lead Co., Southeast Missouri, using trackless loading equipment shows definite advantages: Speed of cleaning, ability to work on steep grades and sharp crosscut

    Jan 1, 1950

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • SME
    Development, Performance, And Application Of High Capacity Portable Bulkspray Coolers At Mt. Taylor Mine

    By Romeo S. Jurani

    Bulkspray cooling has been economically applied in cooling the hot environment of South African gold mines for the past two decades. Its success in that country led to its introduction at Gulf Mineral

    Jan 1, 1983

  • SME
    Development, Validation, And Use Of An Event-Oriented Haul-Cycle Simulation Program

    By William C. Dixon

    Since the mid 60's, several haul cycle simulation programs have been developed. However, most of these programs are believed to employ the continuous, rather than the discrete, event-oriented sim

    Jan 1, 1978

  • AIME
    Development-Sampling And Ore-Valuation Of Gold-Mines.

    By C. BARING HORIVOOD

    (Chattanooga Meeting, October, 1908.) THIS paper is intended, in the light of recent investigations, to call attention to some of the essential features of good practice in sampling and mine-valuatio

    Jan 1, 1909

  • RMCMI
    Developments Along the Line of Low Heat Carbonization

    By A. C. Watts

    The question of disposition of the slack and dust so troublesome to coal mine operators of the West has been divided by your committee chairman into three heads, viz: The preparation and transportati

    Jan 1, 1922