Search Documents

Sort by

  • AUSIMM
    Improvement strategies for accurate underground drilling and blasting effectiveness at the Barrick Kibali Gold Mine

    By F M. Senda

    This paper highlights strategies used at the Barrick operated Kibali Gold Mine (KGM) to improve the drilling accuracy and blasting effectiveness for longhole open stoping. The mine currently uses Solo

    Mar 29, 2023

  • AIME
    Improvements and Present Practice in Blasting Explosives

    By Walter C. Holmes

    IN the recently published book entitled "Man in a Chemical World," by A. Cressy Morrison, the several pages discussing explosives were included in the chapter on "Serving Industry." Such a classificat

    Jan 1, 1938

  • CIM
    Improvements at Bellevue Mine, 1921-1925

    By F. E. Millett

    The following notes deal chiefly with changes from steam to electric drives, or, in the case of the Bellevue pumps, from air to electric. Where electric power can be purchased or generated cheaply it

    Jan 1, 1926

  • AUSIMM
    Improvements in Blast Fragmentation Using Measurement While Drilling Parameters

    An experienced drill operator is able to make a log of a drill hole defining physical properties of the earth such as hardness or structure as they vary with depth. This log is based on intuition or h

    Jan 1, 2001

  • SME
    Improvements In Crusher Control

    By C. Ottergren

    A process does not have higher capacity than what can pass through its bottleneck. Acknowledging this, and with the goal to optimize production at a minimum investment, one can use existing equipment,

    Jan 1, 1999

  • SME
    Improvements In Crusher Control (50d9ae3a-4d5a-4f38-b5d7-94fcbeac9d33)

    By C. Ottergren

    A process does not have higher capacity than what can pass through its bottleneck. Acknowledging this, and with the goal to optimize production at a minimum investment, one can use existing equipment,

    Jan 1, 1999

  • CIM
    Improvements in Dust Control Technology in the Precious and Base Metals Industries

    By David R. Macedon

    "Through the years, a wide variety of dust control methods have been utilized at mineral processing operations. While some have been successful, many have been highly ineffective. Dust Control systems

    Jan 1, 2004

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • CIM
    Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls Operation

    By Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam

    "NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of

    Jan 1, 2006

  • SME
    Improvements In Loading And Hauling Equipment And The Effect On Unit Costs

    By C. S. Davis

    In being asked to present this paper on the improvements in loading and hauling equipment and the effect on unit costs, Mr. Van De Water, your program chairman, stated that his reason for coming to a

    Jan 1, 1959

  • SME
    Improvements in Magnetite Processing Utilising Magnetic Separation Technologies - SME Annual Meeting 2025

    By George Mandarakas, Johan van Zyl, Karl-Heinz Becker

    The world’s climate today has changed compared to 10 or 20 years ago. Many countries face water shortages; water sourcing for mining activities has become harder to secure. ESG’s focus on the industry

    Feb 1, 2025

  • SME
    Improvements in Plant Scale Nitric-Sulfuric Acid Pressure Leaching of Refractory Sulfide concentrates

    By Corby G. Anderson

    Since 1985, the Sunshine Mining Company has used a patented nitric-sulfuric acid pressure leaching system for production of silver and copper from a refractory sulfide ore body. To better understand t

    Jan 1, 1991

  • CIM
    Improvements in Sag Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation

    By Adrian Dance

    Newmont Ghana Gold Limited?s Ahafo operation have been working with Metso Process Technology & Innovation (PTI) since early 2009 to increase mill throughput from a combination of controlled blasting p

    Jan 1, 2012

  • AIME
    Improvements in the Metallurgy of Quicksilver

    By L. H. Dushak

    DURING the war period of quicksilver activity there were a number of departures from what may be termed the classical quicksilver metallurgy. Attempts were made to beneficiate low-grade ores by gravit

    Jan 1, 1930

  • AIME
    Improvements in the Metallurgy of Quicksilver (e77ba05e-b4c4-4821-9bc8-946735a273ae)

    By L. H. Dushak

    DURING the war period of quicksilver activity there were a number of departures from what may be termed the classical quicksilver metallurgy. Attempts were made to beneficiate low-grade ores by gravit

    Jan 1, 1930

  • SME
    Improvements In Underground Mining And Changes In Labor Productivity ? I. Introduction

    By R. L. Loofbourow

    Reasons for reexamining underground mining include: 1. The assurance that more deep deposits of useful minerals will be found. 2. The existence of deeply covered deposits of industrial minerals

    Jan 1, 1967

  • SME
    Improvements Of The Determination Of Block Grades From Blast Hole Data In Porphyry Type Deposits

    By Miche1 Dagbert

    In most open pit operations mining porphyry type deposits, production planning rests on an are reserve inventory block file which is derived from diamond drill hole data. With such a practice, the way

    Jan 1, 1978

  • AUSIMM
    Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South Africa

    By J M. Nel

    Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R

    Oct 5, 2011

  • DFI
    Improvements to Commonly Used Cutoff Wall Specifications

    By Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea

    "Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with

    Jan 1, 2015

  • CIM
    Improvements to Efficiency and Production Through Information Technology

    By Scott Beer

    What New Technologies Will Drive Economic Improvements? ??Historical ?1060?s: Mainframe Technologies ?1970?s: Mini Computing ?1980?s: Workstation Computing ?1990?s: Personal Computing ?2000?s:

    May 1, 2009