Mechanized Narrow Vein Cut-And-Fill Mining At Falconbridge's Deep Copper ProjectBy J. Fuchs
This paper describes the mechanized narrow vein cut-and-fill approach used for the Deep Copper orebody at Falconbridge Limited's Strathcona Mine. Strategies for achieving high productivity while
Jan 1, 1992
-
Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022By John Newby, Edward Kennedy, Ulf Gwildis
Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi
Dec 1, 2022
-
Mechanochemical Synthesis Of Magnetite From Blue DustBy R. Sakthivel
Blue dust is a high grade soft haematite material containing 96.14% Fe2O3 transformed into magnetite (Fe3O4), when it is subjected to planetary ball milling in the presence of iron powder as reducing
Sep 1, 2012
-
Mechanochemical Treatment Of Natural Beach Ilmenite By Silicon Addition And Their Leaching BehaviorBy Yosep Han
Mechanically-induced chemical reactions between natural beach ilmenite (FeTiO3) and silicon (Si) have been examined by a combination of X-ray diffraction (XRD) and scanning electronic microscopy (SEM)
Sep 1, 2012
-
Median and Mean in the Kuz-Ram ModelBy CVB Cunningham
"The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion
Jan 1, 2016
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
Medium Circuit Design And Control For Multi-Density Dense Medium Separation PlantsBy G. Ferrara
The paper describes the new design criteria and control strategies for multi-density dense medium separation (DMS) circuits. The role of the multi-density separation is discussed, and it is emphasized
Jan 1, 1994
-
Medium voltage switchgear and circuit breaker life extensionBy K. J. Boser
"Medium Voltage (MV) metal clad switchgear is referred to as the voltage class from 2.4 kV to 38 kV. Technological advances in circuit breaker designs over the last 20 years have given rise to retrofi
Jan 1, 1998
-
Medusa's Reclamation Programs In Three StatesBy R. D. Shackleton
Medusa Cement Company, a division of Medusa Corporation, is a medium-sized cement manufacturer serving the midwest, east, and southeast. Medusa's eight plants are located in Georgia, Pennsylvania
Jan 1, 1974
-
Meeting Of American Society Of Mechanical EngineersHuman engineering was the keynote of the thirty-ninth annual meeting of the American Society of Mechanical Engineers, which was held in New York, December 3-6. This note was sounded by President Charl
Jan 1, 1919
-
Meeting The Challenge Of Change In Mine MaintenanceBy B. L. Bessinger
Because of a, work stoppage at the Carlsbad plant, IMC faced the challenge of operating a 24-hour-a-day mine and plant with inexperienced maintenance and production crews. This is an underground mi
Jan 1, 1966
-
Meeting the Challenge of GoroThe Project ? $1.4 billion project ? 59,000 tonnes of nickel and cobalt ? Large resource base ? First production end of 2004 The Place ? Half the size of Vancouver Island ? Population 210,000
May 1, 2002
-
Meeting the Challenge of the 80's Cost Reduction Measures at the Iron Ore Company of Canada's Carol Project 1980-85By I. A. Tinto
"Labrador City is located in the southwestern portion of Newfoundland-Labrador, approximately 965 kilometers north-east of Montreal. The mine and beneficiation complex of the Iron Ore Company of Canad
Jan 1, 1986
-
Meeting the Challenges of Gold Exploration through Earthprobe High Resolution Borehole and Surface IPBy R. Gordon, J. Palich, W. Qian
The EarthProbe DCIP system deploys tightly spaced electrodes connected to a centralized data acquisition system that enables arbitrary selection of current and potential electrodes through relays. Rap
Jan 1, 2011
-
Meeting The Coal Quality Challenge In The Expanding Powder River Basin Coal MarketplacePowder River Basin (PRB) mines were originally built to serve power plants designed specifically for their coal. Sulfur was the major concern, with BTU and sodium limiting the market for some. The Cle
Jan 1, 1998
-
Meeting the Global ChallengeBy Jean Vavrek
What is CIM?s role on a planet-wide scale? That question has been coming back to the forefront of many discussions regularly in the months since we came on board as Executive Director and Vice-Preside
Feb 1, 2004
-
Meeting the Global Challenge (689ee366-59af-4a12-871c-7d749f87f065)By Jean Vavrek, Rob Barber
"What is CIM’s role on a planet-wide scale?That question has been coming back to the forefront of many discussions regularly in the months since we came on board as Executive Director and Vice- Presid
Jan 1, 2004
-
Meeting The Requirements Of The Surface Mining Control And Reclamation Act ? IntroductionBy James R. Jones
The Surface Mining Control & Reclamation Act is a complex piece of legislation signed into law on August 3, 1977. It is the culmination of more than six years of debate by the Congress over the need f
Jan 1, 1979
-
Meeting Today’s Challenge in Nickel Production: Reducing Operating Costs at Nickel Sulphide and Laterite PlantsBy A. E. M. Warner, A. Vahed, P. J. Mackey
"Since early 2015, the price of nickel has dropped from the region of US$6/pound to current levels of around US$4.60/pound (March 2017), reflecting several market factors, but principally due to lower
Jan 1, 2017
-
Megablasts – Enabling Technologies in BHP Billiton Iron OreBy B Green
With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed
Aug 24, 2015