Search Documents

Sort by

  • CIM
    On-Line Flotation Simulator at Pyhäsalmi Mine

    By K. Zenger, J. Kaartinen, J. Huuskonen, S. Torttila, S. Lähteenmäki, J. Pietilä

    "Pyhäsalmi Mine in Finland has a long history of continuous process development. The concentrator processes Cu-Zn-sulphide ore with high recoveries. An on-line flotation simulator has been developed t

    Jan 1, 2015

  • SME
    On-Line Moisture Determination Of Ore Concentrates `A Review Of Traditional Methods And Introduction Of A Novel Solution'

    By F. Rosenblum, P. Cancilla

    The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automatic control. The costs associated with transporting

    Jan 1, 2002

  • AUSIMM
    On-Line Moisture Determination of Ore Concentrates ù A Review of Traditional Methods and Introduction of a Novel Solution

    By P Barrette

    The manual gravimetric drying moisture determination methods currently employed by most mineral processing plants fail to provide timely and accurate information required for automatic control. The co

    Jan 1, 2003

  • CIM
    On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’

    By Phillip Cancilla, Daniel Roy, Frank Rosenblum

    "The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti

    Jan 1, 2001

  • IMPC
    On-line Optimization of Crushing Stage Using Speed Regulation on Cone Crusher

    By E. Hulthén

    Cone crushers are used in the mineral, mining, and aggregate industry for fragmentation of rock materials. Control systems for cone crusher settings are widely used to compensate for wear and to prote

    Jan 1, 2014

  • ABM
    On-line Phase Transformation Monitoring On A Hot Strip Mill

    By Paul Pugsley

    The EMSpec sensor employs the principle of measuring the complex impedance of the target steel over a range of frequencies these impedance values in turn varies with transformation fraction of the ste

    Aug 17, 2017

  • SME
    On-Site Oxygen Generation For Metallurgical Processing Plants

    By R. Hendrickson

    In the 1940's a top blown water-cooled oxygen lance was developed to inject oxygen into liquid iron. This process, the LD or BOF process technique, today is used in 65% of the world's steel

    Jan 1, 1990

  • SME
    On-Stream Ash In Coal Monitoring For Profit ? Introduction

    By Peter Cammack

    Where raw coal from a mine is treated in dense medium separators ash in the washed product is generally very consistent, provided control of the medium suspension is maintained at a given specific gra

    Jan 1, 1976

  • SME
    One Evaluation Of Current Engineering Graduates

    By George M. Anderson

    The extraction of industrial minerals is usually confined to relatively small mining operations. The recent COSMAR (Committee on Surface Mining and Reclamation) report found that 93% of all mines in t

    Jan 1, 1981

  • AUSIMM
    One Mile Underground – Mining the N3500 Orebody at Mount Isa Mines

    By I Özen, G Chitumbura

    A paper identifying anticipated challenges in the extraction of the N3500 Orebody at Glencore Xstrata Copper’s Mount Isa Copper Operations was written in 2007. The paper identified the depth of the de

    Mar 24, 2014

  • AUSIMM
    One Orebody ù Two Tenements ù Multiple Owners: How to Apportion Costs and Production Equitably Over the Mine Life?

    Production sharing and cost apportionment in joint ventures is commonplace in Australasia today and elsewhere. It is a recognised convention that, with the exception of a free carry situation, joint v

    Jan 1, 2002

  • AUSIMM
    One perfect (production) day – a bulk solids handling perspective

    By G A. Wellwood

    What do all iron ore mines have in common? Perfect production days! Yes, those harmonious 24-hour periods when the stars align and the daily output number rockets past the long-term average to hit new

    Jul 24, 2017

  • AIME
    One Phase of the Problem of Increasing the Consumption of Copper

    By H. H. Stout

    THE high copper price during the war stimulated the capacity to produce far beyond a possible normal consumption. The curves in Fig. 1 show this. The line YZ indicates, what the world production a

    Jan 11, 1922

  • SME
    One Project, Two Discount Rates (891e694f-646e-464f-8ae9-d46af3cd55ea)

    This paper addresses the valuation and development timing of an undeveloped mineral project. Traditional analysis has us developing the project immediately if its net present value (NPV) is positive.

    Jan 1, 1997

  • AIME
    One Quarter of Utah's Commercial Coal Produced at King Mine

    By S. J. CRAIGHEAD

    IN 1912 the United States Smelting Refining and Mining Company made a large investment in a number of coal properties in Utah and in 1915 a subsidiary, the United States Fuel Co., was organized to tak

    Jan 1, 1948

  • AUSIMM
    One Reserve Estimation

    By Mining Geophysics

    Modern geostatistics has eliminated much of the guess-work in ore reserve estimation, and can calculate levels of confidence for the reserve estimate. Geological modelling software has brought about

    Jan 1, 1994

  • DFI
    One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation Construction

    By Matthew Runion, Christopher Lawler

    The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction

  • TMS
    One Step Forward, Two Steps Back: Crackpots, Charlatans And Metallurgical Absurdities In The Development Of Smelting Technology

    By Larry M. Southwick

    The smelting of copper and other non-ferrous metals have made considerable advances over the last 125 years. Many of the ideas and processes currently in use were attempted early in the history of sme

    Jan 1, 1999

  • CIM
    Online Vibration Monitoring on Electric Mining Shovels

    By D. Nower

    "The supply of copper is expected to be at a large deficit in 2012. To recover from these deficits mining companies are required to maximize production and there is no better way to accomplish this th

    Jan 1, 2012

  • CIM
    Only People Pollute

    By E. R. Mitchell

    When we grow up in an urban environment and choose to become a part of a way of life, it is sometimes difficult to appreciate the cost of this decision in terms of pollution. Explained in this article

    Jan 1, 1971