Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimising flotation plant operation by using a digital twin in the control roomBy R Tooher, S J. Oliver
The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p
Aug 29, 2018
-
Optimising Flow in the Mining Value ChainBy A Dunne, R Kruger, H Coleman, P G. Laurens
External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc
Jul 13, 2015
-
Optimising Mine Ventilation Through the Use of Life-Cycle Production ModelsBy C Kocsis, G Baiden, Y Bissiri
CANMET-MMSL and Penguin Automation Systems Inc have been exploring how process simulation and ventilation modelling software, when combined, can be used to optimise hard-rock/metal mine ventilation sy
Jan 1, 2005
-
Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western AustraliaBy Whitham M
Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r
Jan 1, 1991
-
Optimising Mobile Equipment Resources in Massive MiningMobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The
Jan 1, 2000
-
Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)"Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z
Jan 1, 2016
-
Optimising Project Value and RobustnessBy W Stange, N Hanson
An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based
Jan 1, 2007
-
Optimising The Effective Use Of Energy In The Ferroalloy Industry Through Innovative TechnologyBy A. M. Hearn, J. G. Roos
Energy consumption, being a large proportion of the input of the ferroalloy production process, can be measured in terms of the efficiency with which the energy is utilized and the effectiveness with
Jan 1, 2004
-
Optimising the ramp design in an open pit mine APCOM 2021By I. Kaabachi, F. Meunier, N. Morales
In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp
Sep 1, 2021
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fillBy D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Optimising Underground Mining StrategiesBy A M. Ebbels
"Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi
Mar 8, 2016
-
Optimising Western Australia Magnetite Circuit DesignBy D David
The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po
Aug 8, 2011
-
Optimización de la resistencia de losas de relleno cementado en Andaychagua, Volcan Compañía Minera S.A.A.By Aquiles Vivar Montañez
"La construcción de losas de relleno cementado en la aplicación del método de corte y relleno descendente, es una etapa importante en el ciclo de minado - en tanto representa uno de los mayores costos
Sep 1, 2015
-
Optimización de las actividades de perforación y voladura en la UM San Rafael mediante la implementación en campo del modelo de rotura y la predicción de cavidadesBy Frank Gómez, Solange Ríos, Jean Valencia
La eficiencia y evolución de las actividades de perforación y voladura son de gran relevancia en la actualidad debido al impacto que causa en los procesos posteriores dentro de las operaciones mineras
Sep 30, 2022
-
Optimización del Sistema de Control para los procesos de Extracción por Solventes y Depositación Electrolítica en Planta LESDE ToquepalaBy Adrián Del Carpio
Desde 1995 la planta de Lixiviación de Toquepala desarrolló un sistema de control automático para los procesos de extracción por solventes y electrodepositación. Sin embargo, con el desarrollo de la t
Sep 12, 2011
-
Optimization Initiatives at Altonorte on the Path to Becoming a World Class SmelterBy Beatrice Pierre, Juan Carrasco
Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001
Jan 1, 2019
-
Optimization of Blast Fragmentation Curves and Determination of Rock-Blast Domains at Coimolache Mine, Based on Rock Factor Criterion and Kuz-Ram ModelBy Luis Huaroc, Augusto Sotomayor, Erick Rodriguez, Paulo Fernández, José Ricaldi, Luis Alejandro
The application of the Kuz-Ram model for the prediction of fragmentation is used worldwide, in Coimolache Mine it was used to determine blast domains and optimize the process by obtaining drilling pat
Feb 1, 2020
-
Optimization Of Block Height At The Luossavaara Mine ? IntroductionBy Dan Nilsson
The Luossavaara "Research Mine" is the First large, offensive effort in mining research conducted by the Swedish state. Over a 5-year period, 1981-1985, the Swedish Mining Research Foundation works in
Jan 1, 1985
-
Optimization of Cable Bolting Strategies at a Canadian Underground MineBy Efstratios Karampinos, John Hadjigeorgiou, Philippe Morissette
"Ground support is a critical element in maintaining the stability of mining drives in deep and high stress mines. In challenging ground conditions, it is necessary to continuously explore ground supp
Jan 4, 2018
-
Optimization Of Coal Mine Ventilation SystemsBy G Luxbacher
Computer simulation of mine ventilation systems is rapidly becoming an essential tool in mine planning and design. This paper examines the utilization of ventilation simulation techniques to evaluate
Jan 1, 1977