  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Optimising Flow in the Mining Value Chain

    By A Dunne, R Kruger, H Coleman, P G. Laurens

    External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc

    Jul 13, 2015

  • AUSIMM
    Optimising Mine Ventilation Through the Use of Life-Cycle Production Models

    By C Kocsis, G Baiden, Y Bissiri

    CANMET-MMSL and Penguin Automation Systems Inc have been exploring how process simulation and ventilation modelling software, when combined, can be used to optimise hard-rock/metal mine ventilation sy

    Jan 1, 2005

  • AUSIMM
    Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western Australia

    By Whitham M

    Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r

    Jan 1, 1991

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016

  • AUSIMM
    Optimising Project Value and Robustness

    By W Stange, N Hanson

    An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based

    Jan 1, 2007

  • SAIMM
    Optimising The Effective Use Of Energy In The Ferroalloy Industry Through Innovative Technology

    By A. M. Hearn, J. G. Roos

    Energy consumption, being a large proportion of the input of the ferroalloy production process, can be measured in terms of the efficiency with which the energy is utilized and the effectiveness with

    Jan 1, 2004

  • SAIMM
    Optimising the ramp design in an open pit mine APCOM 2021

    By I. Kaabachi, F. Meunier, N. Morales

    In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp

    Sep 1, 2021

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Optimising Underground Mining Strategies

    By A M. Ebbels

    "Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi

    Mar 8, 2016

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • IIMP
    Optimización de la resistencia de losas de relleno cementado en Andaychagua, Volcan Compañía Minera S.A.A.

    By Aquiles Vivar Montañez

    "La construcción de losas de relleno cementado en la aplicación del método de corte y relleno descendente, es una etapa importante en el ciclo de minado - en tanto representa uno de los mayores costos

    Sep 1, 2015

  • IIMP
    Optimización de las actividades de perforación y voladura en la UM San Rafael mediante la implementación en campo del modelo de rotura y la predicción de cavidades

    By Frank Gómez, Solange Ríos, Jean Valencia

    La eficiencia y evolución de las actividades de perforación y voladura son de gran relevancia en la actualidad debido al impacto que causa en los procesos posteriores dentro de las operaciones mineras

    Sep 30, 2022

  • IIMP
    Optimización del Sistema de Control para los procesos de Extracción por Solventes y Depositación Electrolítica en Planta LESDE Toquepala

    By Adrián Del Carpio

    Desde 1995 la planta de Lixiviación de Toquepala desarrolló un sistema de control automático para los procesos de extracción por solventes y electrodepositación. Sin embargo, con el desarrollo de la t

    Sep 12, 2011

  • CIM
    Optimization Initiatives at Altonorte on the Path to Becoming a World Class Smelter

    By Beatrice Pierre, Juan Carrasco

    Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001

    Jan 1, 2019

  • ISEE
    Optimization of Blast Fragmentation Curves and Determination of Rock-Blast Domains at Coimolache Mine, Based on Rock Factor Criterion and Kuz-Ram Model

    By Luis Huaroc, Augusto Sotomayor, Erick Rodriguez, Paulo Fernández, José Ricaldi, Luis Alejandro

    The application of the Kuz-Ram model for the prediction of fragmentation is used worldwide, in Coimolache Mine it was used to determine blast domains and optimize the process by obtaining drilling pat

    Feb 1, 2020

  • SME
    Optimization Of Block Height At The Luossavaara Mine ? Introduction

    By Dan Nilsson

    The Luossavaara "Research Mine" is the First large, offensive effort in mining research conducted by the Swedish state. Over a 5-year period, 1981-1985, the Swedish Mining Research Foundation works in

    Jan 1, 1985

  • SME
    Optimization of Cable Bolting Strategies at a Canadian Underground Mine

    By Efstratios Karampinos, John Hadjigeorgiou, Philippe Morissette

    "Ground support is a critical element in maintaining the stability of mining drives in deep and high stress mines. In challenging ground conditions, it is necessary to continuously explore ground supp

    Jan 4, 2018

  • SME
    Optimization Of Coal Mine Ventilation Systems

    By G Luxbacher

    Computer simulation of mine ventilation systems is rapidly becoming an essential tool in mine planning and design. This paper examines the utilization of ventilation simulation techniques to evaluate

    Jan 1, 1977