Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Housing and Sanitation at MinevilleBy S. LeFevre
THE solution of the housing and sanitation problem in mining communities, keeping in view both economic and humanitarian aspects, demands the best thought of the management of such enterprises. Upon t
Jan 2, 1915
-
Housing Of Labor And Sanitation At -Mines In IndiaThe housing of labor and sanitation at mines in India are difficult problems to solve because-no more than two or three castes will accept the same conditions, and conditions suitable to one coal-fiel
Jan 12, 1918
-
Housing Stress and Location Choices in Bowen Basin Mining Communities - A Case Study of MoranbahBy S Lockie, G Ivanova, J Rolfe
One of the consequences of mining expansion in the Bowen Basin region of Central Queensland in Australia has been a substantial increase in demand for housing, with subsequent impacts on housing and r
Jan 1, 2009
-
Housing, Health, Education, and SafetyBy GILBERT C. DAVIS
ANY thought of Morenci naturally includes its sister town of Clifton, its gateway to the outside world. Clifton, the country seat of Greenlee County, is the terminus of a branch line of the Southern P
Jan 1, 1942
-
Houston International Minerals - Manhattan, Nye County, NevadaSilver ore was first discovered in 1866 at Manhattan, and a few ore shipments were treated in a mill at nearby Belmont. The district was abandoned from 1869 to April 1, 1905, when rich gold float was
Jan 1, 1981
-
Houston Pipe Jacking - Large And SmallBy George H. Klein, B. Kent Merritt, Anthony Crisci
During the past decade, over 114-km (71-mi) of 0.25-m (10-in) to 3.7-m (144-in) finished diameter tunnels have been driven below Metropolitan Houston as part of a major program of water and wastewater
Jan 1, 1991
-
Hovercraft And Marine Sub-bottom Profiler For An Engineering Geophysical Survey Of An Active Mine Tailing ImpoundmentBy L. K. Lepley
A marine sonic sub-bottom profiling system and a hovercraft were used in an engineering geophysics survey of the tailings being deposited at the Mercur gold mine. Detailed density sections with vertic
Jan 1, 1994
-
How Electronics Initiation has Changed the Rules of Blast DesignBy Thierry Bernard
For many years now electronic initiation has brought the time parameter to the centre of blast designs forever. Although this parameter existed before the era of electronic detonators, Blasting engine
Jan 1, 2005
-
How "Changing" Transportation Can Effect Mining ProfitsBy Phillip J. Maddex
During the last 10 years there have been many new developments in transport and handling equipment. Important technical and economic developments that can be used to reduce costs are; new terminal an
Jan 1, 1972
-
How 3D Images Support Rock EngineeringBy Andreas Gaich
COMBINED 3D IMAGES _ Highly detailed 3D geometry _ Identification of fine fractures together with a general impression of the situation _ Dealing with unfavourable outcrop geometries
May 1, 2009
-
How A "Tee-Hee" Category Got The Last LaughBy D. J. Tooker
For the next few minutes, I will be discussing a product and category that many people laughed at for years. The product is cat box filiers or commonly referred to by the brand name KITTY LITTER. This
Jan 1, 1980
-
How A Financier Can Handle The Mine Environmental Rehabilitation Costs: The Case Of The Ranger Uranium Mine, AustraliaBy C. R. Tinsley
In maybe the world's first in a mine project financing, a US $55 million Rehabilitation Indemnity was given on behalf of the banks in a US $250 million loan to develop the Ranger uranium mine, No
Jan 1, 1992
-
How a frontline planning and commitment system improves trust, commitment and results in operationsBy G Britton, P Moynagh
As more than a few mines gradually sink under the weight of emails, whiteboards, notice boards and ever more complex spreadsheets, the holy grail of effective short-term interval planning and control
Oct 16, 2017
-
How a Plant is ConstructedBy George E. Aiken, B. R. Jr. Waples
INTRODUCTION In this paper the author will attempt to bridge from the paper work of design and engineering to the reality of implementation. Certain facets of construction are constant to a succes
Jan 1, 1986
-
How a simple equation delivers breakthrough understanding of grinding circuits - ME Feature ArticleBy Robert McIvor
The following is a summary of the Robert H. Richards Lecture on “Learning and Good Fortune on the Road to Discovery” presented at the Mineral & Metallurgical Processing Division (MPD) Awards Plenary S
Mar 1, 2026
-
How accurate are non-destructive-testing based estimates of mine shaft rope breaking-strength losses? — an updateBy J. E. Udd, L. B. Geller
"Mine-shaft wire-rope discard regulations include, among other criteria, a limited amount of permissible loss-of-breaking-strength (LBS). Currently, this parameter is estimated on the basis of non-des
Jan 1, 1990
-
How acid rain legislation might change coal use patternsBy Earl L. Rau
At the present time, whether an electric utility uses high-sulfur coal is largely determined by geographical location, clean air legislation, and the age of the power plant. Acid rain legislation may
Jan 1, 1987
-
How Advances in Pyrometallurgical Treatment of Copper and Nickel Sulphide Have Added Value to the Non Ferrous Metal IndustryAlmost from the beginning of civilisation the inhabitants hadlearned the art of recovering and working copper to produceitems which were of use to society.From the early beginnings of the use of coppe
Jan 1, 1995
-
How an American Firm Developed Australia's Richest Coal RegionThe industrial might of the Bowen Basin is primarily the result of Utah Development Co.'s work- which has opened up the Blackwater, Goonyella, Peak Downs, and Saraji mines; built the Hay Point po
Jan 1, 1977
-
How An Object-Orientated Modelling Approach For A Mine Option Study Can Increase The Quality Of Decision: A Case StudyBy W. Gabryk
A large new underground platinum mining project required that all different mining options were investigated during an option study before proceeding to the prefeasibility stage of the project. The ca
Jan 1, 2012