Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Commissioning a Large Coal Blending and Preparation PlantThe Curragh coal mining operation was designed and constructed to produce two coals initially at a rate of 4.3Mtpa. These are a high thermal energy steam coal primarily for domestic electricity ge
Jan 1, 1986
-
Commissioning and Early Operation of the Con Mine Pressure Oxidation PlantBy Paul D. Young, Michael J. Allan
"The Con Mine has been producing gold continuously since 1938. In 1990 laboratory and pilot plant investigations began into the use of pressure oxidation for treatment of an arsenic trioxide waste pro
Jan 1, 1994
-
Commissioning And Evaluation Of 11.000 H.P. Variable Speed Sag Mill Gearless Drive At Chuquicamata Concentration PlantBy H. Salamanca
The electric operation and design features of the 11.000 H.P. variable speed SAG mill gearless drive is presented. The function of the frequency converter, control system drive and lubrication systems
Jan 1, 1991
-
Commissioning and Operating an Autogeneous Mill at Karowe Diamond MineBy N A. Sikwa, L M. van Niekerk, G N. Ndlovu
In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first
Jul 15, 2013
-
Commissioning and Operating Experience with GekkoÆs Gold Ore Treatment PlantsBy S Gannon, J Abols, T Hughes
In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilises conventional crushing and ball
Jan 1, 2006
-
Commissioning and Operating Experience with Gekko’s Gold Ore Treatment PlantsBy Tim Hughes, Steve Gannon, Jennifer Abols
"In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal
Jan 1, 2007
-
Commissioning and Operation of Bio-Oxidation Plants for the Treatment of Refractory Gold OresBy Pieter C. van Aswegen, J. A. Brierley, C. L. Brierley
The bacterial-oxidation (BIOX®) process for the pre-treatment of refractory ores for gold recovery is marketed by BlOMlN Technologies S.A. The process was originally developed by GENMIN who is still p
Jan 1, 1993
-
Commissioning and Operation of Milling Circuit at Santarita Nickel OperationThe Santa Rita mine is located in north eastern part of Bahia in Brazil and is owned and operated by Mirabela Mineração do Brasil Ltda. Typical SABC circuit was designed as the preferred option for th
Jan 1, 2012
-
Commissioning and Operation of Milling Circuit at Santarita Nickel Operation (Outotec (USA) Inc.)By E. Faria
"The Santa Rita mine is located in north eastern part of Bahia in Brazil and is owned and operated by Mirabela Mineração do Brasil Ltda. Typical SABC circuit was designed as the preferred option for t
Jan 1, 2012
-
Commissioning and Operation of the 800 TPH Heavy Medium Cyclone Plant at Mount Isa Mines LimitedBy Pease JD, Munro PD
The heavy medium cyclone plant for the preconcentration of silver-lead-zinc ore prior to grinding and flotation was commissioned in August 1982. This paper details the measures taken to get the pl
Jan 1, 1984
-
Commissioning and Operation of the Ag Mills at the Aitik Expansion ProjectBy S. Markstrom
The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis
Jan 1, 2012
-
Commissioning and Operation of the AG Mills at the Aitik Expansion Project (aaf8f334-a1ef-48c8-b4f0-2d5b88480a9a)By S. Markstrom
The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis
Jan 1, 2012
-
Commissioning and Operation of the Copper Cliff Weak Acid Treatment PlantBy T. Xue
429 As part of Inco's S02 abatement project for its Sudbury operations, a weak acid treatment plant (W ATP) was commissioned at the Copper Cliff smelter in August of 2004 to treat the weak acid
Jan 1, 2006
-
Commissioning And Operation Of The Mineral Park ConcentratorBy M. Gorman
The Mineral Park Mine is an open pit copper-molybdenum mine located in northwestern Arizona, approximately 74 miles southeast of Las Vegas, Nevada. The property has been owned by the Duval Corporatio
Jan 1, 2010
-
Commissioning and Operation of the Pressure Oxidation Circuit at Porgera, PNGPorgera is located in the Central Highlands of Papua New Guinea. Porgera Joint Venture treats a high grade epithennal gold deposit. Most of the gold occurs as submicroscopic particles in a sulphide ma
Jan 1, 1992
-
Commissioning and Optimisation of the New Lead and Silver Refinery at the Pasminco Port Pirie SmelterBy M. Giunti, R. Hampson, S. Gray, P. Kapoulitsas, J. Clark
In 1997 Pasminco's Port Pirie Lead Smelter began a modernisation of its lead and precious metals refinery operations. Driven by the anticipated closure of its Broken Hill mine, the new refining proces
Jan 1, 2000
-
Commissioning and Optimisation of the Phu Kham Copper-Gold ConcentratorBy G Harbort, T Georgiev, M Phillips
Phu Bia Mining Ltd, a subsidiary of Pan Australian Resources Ltd owns and operates the Phu Kham copper concentrator located in the Xaysomboun District, Lao PeopleÆs Democratic Republic. Construction a
Jan 1, 2009
-
Commissioning and Process Development of Pipeline and Port Operations at Pasminco CenturyBy D Hodder, M Hoskins, A Rofe
Pasminco Century MineÆs slurry pipeline was commissioned in November 1999. It currently transports zinc and lead concentrate slurries in batch form to the Port facility, 304 km away in the Gulf of Car
Jan 1, 2003
-
Commissioning And Ramp Up Of The Hpgr Circuit at Newmont Boddington GoldBy Steven Hart
In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of the
Jan 1, 2012
-
Commissioning and Ramp Up of the HPGR Circuit at Newmont Boddington Gold (Newmont Boddington Gold’s Processing Facilities)By Brendan Parker, Tyron Rees, Steven Hart, Abba Manesh, Ian Mcgaffin
"In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of th
Jan 1, 2012