Search Documents

Sort by

  • AUSIMM
    Commissioning a Large Coal Blending and Preparation Plant

    The Curragh coal mining operation was designed and constructed to produce two coals initially at a rate of 4.3Mtpa. These are a high thermal energy steam coal primarily for domestic electricity ge

    Jan 1, 1986

  • CIM
    Commissioning and Early Operation of the Con Mine Pressure Oxidation Plant

    By Paul D. Young, Michael J. Allan

    "The Con Mine has been producing gold continuously since 1938. In 1990 laboratory and pilot plant investigations began into the use of pressure oxidation for treatment of an arsenic trioxide waste pro

    Jan 1, 1994

  • SME
    Commissioning And Evaluation Of 11.000 H.P. Variable Speed Sag Mill Gearless Drive At Chuquicamata Concentration Plant

    By H. Salamanca

    The electric operation and design features of the 11.000 H.P. variable speed SAG mill gearless drive is presented. The function of the frequency converter, control system drive and lubrication systems

    Jan 1, 1991

  • AUSIMM
    Commissioning and Operating an Autogeneous Mill at Karowe Diamond Mine

    By N A. Sikwa, L M. van Niekerk, G N. Ndlovu

    In June 2012, Lucara Diamond Corporation officially commissioned its Karowe Diamond Mine in Letlhakane, Botswana. The processing plant circuit incorporates variable speed autogeneous milling, a first

    Jul 15, 2013

  • AUSIMM
    Commissioning and Operating Experience with GekkoÆs Gold Ore Treatment Plants

    By S Gannon, J Abols, T Hughes

    In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilises conventional crushing and ball

    Jan 1, 2006

  • CIM
    Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants

    By Tim Hughes, Steve Gannon, Jennifer Abols

    "In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal

    Jan 1, 2007

  • SME
    Commissioning and Operation of Bio-Oxidation Plants for the Treatment of Refractory Gold Ores

    By Pieter C. van Aswegen, J. A. Brierley, C. L. Brierley

    The bacterial-oxidation (BIOX®) process for the pre-treatment of refractory ores for gold recovery is marketed by BlOMlN Technologies S.A. The process was originally developed by GENMIN who is still p

    Jan 1, 1993

  • CIM
    Commissioning and Operation of Milling Circuit at Santarita Nickel Operation

    The Santa Rita mine is located in north eastern part of Bahia in Brazil and is owned and operated by Mirabela Mineração do Brasil Ltda. Typical SABC circuit was designed as the preferred option for th

    Jan 1, 2012

  • CIM
    Commissioning and Operation of Milling Circuit at Santarita Nickel Operation (Outotec (USA) Inc.)

    By E. Faria

    "The Santa Rita mine is located in north eastern part of Bahia in Brazil and is owned and operated by Mirabela Mineração do Brasil Ltda. Typical SABC circuit was designed as the preferred option for t

    Jan 1, 2012

  • AUSIMM
    Commissioning and Operation of the 800 TPH Heavy Medium Cyclone Plant at Mount Isa Mines Limited

    By Pease JD, Munro PD

    The heavy medium cyclone plant for the preconcentration of silver-lead-zinc ore prior to grinding and flotation was commissioned in August 1982. This paper details the measures taken to get the pl

    Jan 1, 1984

  • CIM
    Commissioning and Operation of the Ag Mills at the Aitik Expansion Project

    By S. Markstrom

    The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis

    Jan 1, 2012

  • CIM
    Commissioning and Operation of the AG Mills at the Aitik Expansion Project (aaf8f334-a1ef-48c8-b4f0-2d5b88480a9a)

    By S. Markstrom

    The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis

    Jan 1, 2012

  • CIM
    Commissioning and Operation of the Copper Cliff Weak Acid Treatment Plant

    By T. Xue

    429 As part of Inco's S02 abatement project for its Sudbury operations, a weak acid treatment plant (W ATP) was commissioned at the Copper Cliff smelter in August of 2004 to treat the weak acid

    Jan 1, 2006

  • SME
    Commissioning And Operation Of The Mineral Park Concentrator

    By M. Gorman

    The Mineral Park Mine is an open pit copper-molybdenum mine located in northwestern Arizona, approximately 74 miles southeast of Las Vegas, Nevada. The property has been owned by the Duval Corporatio

    Jan 1, 2010

  • AUSIMM
    Commissioning and Operation of the Pressure Oxidation Circuit at Porgera, PNG

    Porgera is located in the Central Highlands of Papua New Guinea. Porgera Joint Venture treats a high grade epithennal gold deposit. Most of the gold occurs as submicroscopic particles in a sulphide ma

    Jan 1, 1992

  • TMS
    Commissioning and Optimisation of the New Lead and Silver Refinery at the Pasminco Port Pirie Smelter

    By M. Giunti, R. Hampson, S. Gray, P. Kapoulitsas, J. Clark

    In 1997 Pasminco's Port Pirie Lead Smelter began a modernisation of its lead and precious metals refinery operations. Driven by the anticipated closure of its Broken Hill mine, the new refining proces

    Jan 1, 2000

  • AUSIMM
    Commissioning and Optimisation of the Phu Kham Copper-Gold Concentrator

    By G Harbort, T Georgiev, M Phillips

    Phu Bia Mining Ltd, a subsidiary of Pan Australian Resources Ltd owns and operates the Phu Kham copper concentrator located in the Xaysomboun District, Lao PeopleÆs Democratic Republic. Construction a

    Jan 1, 2009

  • AUSIMM
    Commissioning and Process Development of Pipeline and Port Operations at Pasminco Century

    By D Hodder, M Hoskins, A Rofe

    Pasminco Century MineÆs slurry pipeline was commissioned in November 1999. It currently transports zinc and lead concentrate slurries in batch form to the Port facility, 304 km away in the Gulf of Car

    Jan 1, 2003

  • CIM
    Commissioning And Ramp Up Of The Hpgr Circuit at Newmont Boddington Gold

    By Steven Hart

    In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of the

    Jan 1, 2012

  • CIM
    Commissioning and Ramp Up of the HPGR Circuit at Newmont Boddington Gold (Newmont Boddington Gold’s Processing Facilities)

    By Brendan Parker, Tyron Rees, Steven Hart, Abba Manesh, Ian Mcgaffin

    "In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of th

    Jan 1, 2012