Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Dewatering Challenges in Urban EnvironmentsBy Rafael A. Rivera
"Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re
Jan 1, 2017
-
Construction Difficulty Index For Tunnel ConstructionBy Sigmund J. Sulinski
The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All
Jan 1, 1997
-
Construction Induced Vibration during Sheet Pile and Pile Driving in Deep ExcavationBy Ambarish Ghosh, Subhaprasad Chakraborty
"Construction of basement floors has become necessary to meet the requirement of parking in office and residential complexes and in hospitals for radiotherapy treatment. Important projects coming up i
Jan 1, 2015
-
Construction Issues Encountered In The Installation Of Building Foundations As Ground-Source Heat ExchangersBy W. Zitz
Incorporation of heat exchangers into drilled shaft foundations is a novel approach to both improve the energy efficiency of building heat pump systems and provide necessary structural support using t
Jan 1, 2011
-
Construction Labour Relations in the Mining IndustryBy W. J. Gibson
"This paper will provide a general assessment of the differences in construction and industrial labour relations. From this outline will come a detailed examination of labour relations in the construc
Jan 1, 1972
-
Construction Management And Team Effort Soft Ground Tunnel Project, Alexandria, EgyptBy Chaitanya "Teny" Mittal
INTRODUCTION A team effort by the Owner, Engineer, and Contractor can help avoid serious problems on a construction project. It can save cost and time for both Owner and Contractor, as illustrated
Jan 1, 1989
-
Construction Management of Hydrogeological Aspects of Melbourne City Link ProjectBy I A. Lamb
The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two
Jan 1, 1999
-
Construction Management Of Washington MetroBy John S. Egbert
Many of you are familiar with the Washington Metro Project. However, inasmuch as some may not be, and others may want to refresh their memories regarding certain facets of the project, I will cite a f
Jan 1, 1981
-
Construction Management Saves Time, Money and Improves Quality During Design and ConstructionBy Behrouz Tehrani
The size, complex issues, and requirements to construct large number of tunnels, for a single project, expeditiously, and without exceeding the overall project budget, a program Construction Managemen
Jan 1, 2008
-
Construction Materials – Aggregates-IntroductionBy Henry N. McCarl
[The Construction Materials section contains the following Chapters: Aggregates Cement and Cement Raw Materials Crushed Stone Dimension and Cut Stone Lightweight Aggregates Gypsum and Anhydrite Sa
Jan 1, 1983
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
Construction Methods for Remote LocationsProjects to be undertaken in remote locations require special attention with regard to constructability from the very first stages of design. This is to ensure not only that the project is compat
Jan 1, 1986
-
Construction Methods, Cushman Tunnel No. 2By F. E. ROGERS
CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the
Jan 1, 1931
-
Construction of 10’ Diameter Shafts for the Olmsted Approach Walls ProjectBy Thomas G. Tavernaro, Jeffrey A. Schaefer
"The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci
Jan 1, 2006
-
Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWYBy David Coleman
This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive
-
Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water IntersectionBy M. F. Wells
The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w
Jan 1, 1999
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora ProjectBy H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006