Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction of an Underpass Crossing in Proximity of a Railway TrackBy Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi
"1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is
Jan 1, 2016
-
Construction Of Cast-In-Place Piles With Enlarged BasesBy H. Mori
Construction of cast-in-place piles with enlarged bases has become popular in the cities in Japan facing to the sea coast, where the subground soil is soft alluvium deposited to depths often exceeding
Jan 1, 1989
-
Construction of City Tunnel No. 3,Stage 2 From Brooklyn to QueensBy Jim W. Rosteck, Anthony Del Vescovo
In December of 1992, the City of New York, Department of Environmental Protection, solicited bids for Contract 543B. The low bidder was a joint venture of Schiavone Construction Co., Inc. and the J. F
Jan 1, 1997
-
Construction Of Coal Mine Waste Disposal Systems Consistant With Environmental RegulationsBy Richard E. Lounsbury
Coal mine refuse handling traditionally has been the redheaded stepchild of the industry - a problem to be ignored as much as possible. During the past few years, however, mining companies have become
Jan 1, 1973
-
Construction of Combustion Synthesis Stability Diagrams for Ceramic Metal-Matrix CompositesBy John J. Moore
This paper discusses the application of a video technique to construct stability diagrams for the combustion synthesis of ceramic-metal composites. Several model exothermic combustion synthesis reacti
Jan 1, 1993
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
Construction of Coxwell Bypass Tunnel Project in Toronto, ON - RETC2023By Ehsan Alavi, Eren Kusdogan
The City of Toronto’s Coxwell Bypass Tunnel is currently being constructed by North Tunnel Constructors ULC, a joint venture of Jay Dee Canada, C&M McNally Tunnel Constructors and Michels Canada. This
Jun 13, 2023
-
Construction Of Deep Foundations By Cast-In - Borehole MethodBy Y. W. Mou
In order to improve the construction of pile foundations and deep foundations of largo sizes, the paper deals with the method of installing square or rectangular bored-piles for annular foundation as
Jan 1, 2010
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - SynopsisBy A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Construction of Deep Shafts and Ground Improvement for the West Side CSO Tunnel Project, Portland, OregonBy Yves St-Amour, Vince Luongo
This paper will discuss one of the largest construction projects the City of Portland has undertaken. This phase of the Willamette River Combined Sewer Overflow (CSO)project consists of approximately
Jan 1, 2005
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
Construction Of Drilled Shafts For The Upper Northwest Interceptor, Sections 1&2 Project?Sacramento, CABy Jeremy Theys
The Sacramento Regional County Sanitation District (SRCSD) is improving the sewer system in the Natomas area of Sacramento, CA. The Upper Northwest Interceptor (UNWI) system is an ongoing series of tu
-
Construction Of Effluent Outfall Diffusers For The Boston Harbor ProjectBy Geoffrey D. Collins
This paper deals with the construction of the Effluent Outfall Diffusers which form part of the outfall for the Deer Island sewage project. The work was executed 15 km out to sea in Massachusetts Bay
Jan 1, 1994
-
Construction Of Explosion Resistant SealsBy C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Jan 1, 1997
-
Construction Of Explosion Resistant Seals – Preprint 97-83By C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Feb 24, 1997
-
Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft RockBy Yukika Miyashita, Takahiro Inoue, Kenji Namikawa, Masashi Matsumoto, Junichi Koseki, Yoshihiro Terashima
"In order to construct an underground two-layer expressway branch junction structure with a height of 14.7 m and a width of 22.3 m, two shield tunnels in each layer were combined by using a non-cut-an
Jan 1, 2016
-
Construction Of First 20-Foot Diameter Machine-Bored Raised ShaftsBy R. A. Pond
Two 6.17 m (20 ft 3 in.) diameter raises, concrete-lined to 5.49 m (18 ft) inside diameter, were completed in 1978 at the Monterey Coal Company Number One Mine near Carlinville, Illinois, by Frontier-
Jan 1, 1979
-
Construction Of Foundation Of Power House-IV At W.Y.C., Hydro-Electric Project, H.S.E.B., Bhudkalan, Haryana. - SynopsisBy D. K. ] [Gupta
The Foundations of the Shear keys and alround cut off for Power House -IV of the Western Yamuna Canal Hydroelectric Project at Bhudkalan, Haryana were to be laid at a depth of 26M below the N.S.L and
Jan 1, 1996
-
Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? SynopsisBy N. V. Nayak
Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i
Jan 1, 1996
-
Construction Of Geological Controls For Three Dimensional Orebody ModelingBy F. Daviess
A requirement for geological controls during orebody modeling results from the recognition of heterogeneous geological characteristics and/or abrupt variations in orebody geometries. While purely stat
Jan 1, 1992