Search Documents

Sort by

  • CIM
    Construction of Headframe and Surface Plant: No. 1 Shaft, Jeffrey Mine, Canadian Johns-Manville Co., Limited

    By K. V. Lindell

    Introduction This paper describes a recent innovation in the design and construction of mine headframes. A reinforced concrete headframe was built by using sliding forms. A concrete headframe of

    Jan 1, 1948

  • SME
    Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri Lanka

    By Jamal Rostami, Ataollah Rahbar

    "Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a

    Jan 1, 2016

  • DFI
    Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study

    By R. Radhakrishnan, C. Gunasekaran

    "Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of

    Jan 1, 2015

  • SME
    Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box Jacking

    By Peter van Dijk, Gary Almeraris, Philip Rice

    This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A

    Jan 1, 2001

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • SME
    Construction Of Large Diameter Shafts With Reinforced Concrete Ring Beans

    By Daniel L. Hanson

    This paper presents case histories of the construction of four large diameter circular shafts using reinforced concrete ring beams as the primary internal support system. The case histories pertain to

    Jan 1, 1987

  • DFI
    Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2008

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • DFI
    Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2013

  • DFI
    Construction Of Large Open Caissons In Soft Stratum

    By Chen Zhiquan

    Author has exhaustively researched into soft ground through construction of a large open caisson on soft ground (muck) which weighs more than 4, 000 tons. To avoid any contingency during construction,

    Jan 1, 1991

  • DFI
    Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The Project

    By D. X. Xu

    A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin

    Jan 1, 2010

  • DFI
    Construction Of Large Underground Openings And Use Of Grouts ? Synopsis

    By E. Mongilardi

    The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a

    Jan 1, 2010

  • SME
    Construction of Leach Pads on Steeply Sloping Ground

    By Nancy C. Shaver, Alan Tapp

    Leach pads of 272,000 tonnes (300,000 st) and 910,000 tonnes (1,000,000 st) with associated operating ponds have recently been constructed on sidehill locations with up to 20 percent slopes. The large

    Jan 1, 1987

  • DFI
    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • DFI
    Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis

    By C. L. Liao

    The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter

    Jan 1, 2010

  • SME
    Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal Area

    By Rudy Scarabelli, John R. Wagner

    At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th

    Jan 1, 1987

  • SME
    Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station Project

    By S. Holtermann

    Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • SME
    Construction of Oroville Dam - A Material Handling Challenge

    By Robert Walker

    The win theme of this session is Unique Material Handing Systems. The theme was selected because of two major factors. 1. Accomplishments of unique character manage to attract interest regardless o

    Jan 1, 1970

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021