  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983

  • SAIMM
    Construction Of Permanent Intruded Plugs At South Deep Gold Mine

    By D. A. Bruce

    The paper describes the construction of 5 plugs to resist high water heads at depth within the South Deep Gold Mine, Randfontein, South Africa. A total of 20 segments were involved to create these plu

    Jan 1, 2006

  • DFI
    Construction Of Pile Foundation For Railway Viaducts

    By M. D. Khattar

    The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc

    Jan 1, 1989

  • SME
    Construction Of Port Huron, Michigan Intake Shaft

    By D. E. Piggott, B. E. Hartmann

    The thought of constructing an intake shaft five miles from the shore and 142 feet below the surface of Lake Huron from the bottom up sounds like a questionable venture. Why would one want to raise

    Jan 1, 1974

  • SME
    Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project

    By Hendrick A. D. Kirsten, A. Clayr Alexander

    Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so

    Jan 1, 2001

  • CIM
    Construction of prime coking coal washeries in India

    By Bali. D. D., S. Chattopadhyay

    "The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta

    Jan 1, 1986

  • AUSIMM
    Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works

    The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.

    Jan 1, 1924

  • SME
    Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DC

    By Charles E. Mergentime, J. Marshall Dean

    Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,

    Jan 1, 1985

  • CIM
    Construction of Sherritt's Concentrators

    By J. A. MacLellan

    "CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design

    Jan 1, 1972

  • SME
    Construction Of Shin-Kanmon Tunnel On Sanyo Shinkansen

    By Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda

    The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in

    Jan 1, 1976

  • SME
    Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio

    By Lawrence M. Lenahan

    Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con

    Jan 1, 1989

  • SME
    Construction Of Straight Creek Tunnel, Colorado

    By R. C. Hopper, A. A. Mathews, T. A. Lang

    DESCRIPTION OF PROJECT The Straight Creek Tunnel site is located approximately sixty (60) miles west of Denver, Colorado, on Interstate Route 70 in the vicinity of Loveland Pass, in the Rocky Mount

    Jan 1, 1997

  • SME
    Construction of TBM-Mined Segments of the Sister Grove Outfall Pipeline - RETC2023

    By Ricky Chipka, Roshan Thapa, Richard Yovichin, Greg Rogoff, Patrick Niemuth

    A 4.5-mile-long, 96-inch-diameter outfall pipeline was constructed between North Texas Municipal Water District’s proposed Sister Grove Regional Water Resource Recovery Facility and the Stiff Creek Di

    Jun 13, 2023

  • SME
    Construction Of The 1122 / 1130 Tunnels on the Superconducting Super Collider Project

    By Tom B. Corry

    INTRODUCTION Located approximately 48 km (30 miles) south of Dallas, Texas, use to be the site of the Superconducting Super Collider. For those of you unfamiliar with the project, this was a multi-

    Jan 1, 1995

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • AUSIMM
    Construction of the Brunswick Street Rail Tunnels

    The paper, one of two papers on the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling conference, describes documentation, tendering and construction aspects.Ten

    Jan 1, 1993

  • SME
    Construction of the Bypass Tunnel for the Upper Llagas Creek Flood Protection Project - RETC2023

    By Clayton Williams, Dale M. Hata, Glenn M. Boyce

    The Upper Llagas Creek Flood Protection Project in Northern California encompasses portions of the communities of Morgan Hill and Gilroy, and unincorporated areas of Santa Clara County. The project pr

    Jun 13, 2023

  • SME
    Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”

    By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla

    One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently

    Jan 1, 2007

  • SME
    Construction of the Combined Sewage Overflow Tunnel for the City of Fall River

    By Shemek Oginski

    The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast

    Jan 1, 2005

  • SME
    Construction of the Cowles Mountain Tunnel

    By George K. Mitteer

    The Cowles Mountain Tunnel was driven 2,073 m (6,800 ft) with a 3.43 m (11 ft 3 in) shuffle shoe TBM, for the San Diego County Water Authority, through extremely high strength granitic rock in the Cit

    Jan 1, 1995