Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli
The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a
Jun 13, 2021
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Construction of the Seven Thousand Tonne per Day – Big Gossan Production ShaftBy N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011
-
Construction of the South Bay Ocean OutfallBy Michael Jatczak, Brett Robinson
The South Bay Ocean Outfall tunnel is located at the U.S./Mexico Border and is one link in a system designed to treat and dispose of raw sewage entering the Tijuana River Valley from Mexico. The 11 fi
Jan 1, 1999
-
Construction Of The South Interceptor Montreal, Quebec, CanadaBy Jacques Mongrain, Serge Barbeau, Gary Brierley
The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels
Jan 1, 1987
-
Construction of the SR-99 recovery shaftBy Lance Rasband, Richard Hanke, John Starcevich
"Mining on Seattle’s SR99 tunnel began in July of 2013. Initial mining progressed slowly through a 4.5 m (14.9-ft) thick fiber-reinforced concrete headwall before immediately entering the first of thr
Jun 1, 2016
-
Construction of the SR-99 TBM Recovery ShaftBy Lance Rasband, Richard Hanke, John Starcevich
"The world’s largest tunnel boring machine (TBM), at the time of her launch in 2012, the TBM locally referred to as “Bertha,” is incapacitated due to mechanical failure. Bertha’s stoppage places her 2
Jan 1, 2016
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMsBy P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo
The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.
Jan 1, 2005
-
Construction of the West Area CSO Tunnels and Pumping StationBy Ray Hutton, Darrell Liebno, Taro Nonaka
Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont
Jan 1, 2007
-
Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof MembraneBy L. L. Lacerda, A. J. Blair
The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double
Jan 1, 2005
-
Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam InjectionBy P. Marcheselli, Jean-Yves Peron
A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac
Jan 1, 1995
-
Construction Of Tunnels In Methane EnvironmentsBy Barry R. Doyle, James P. Rose, Marius P. Gronbeck
This paper presents a strategy for addressing the hazards of construction of tunnels in ground containing methane. A discussion of the nature of methane includes occurrence underground, and manner of
Jan 1, 1991
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, CaliforniaBy Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Construction Phase Services for Australian and North American SEM Tunneling - NAT2024By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim
Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s
Jun 23, 2024
-
Construction Problems In Cold WeatherBy G. M. Ellis
This paper deals with some aspects of concrete construction in remote locations and/or cold climates. The writer's experience covers 25 years in construction in western and Central Canada. I will
Jan 1, 1971
-
Construction Procedures And Equipment For Drop Shafts Metropolitan Sanitary District Of Greater ChicagoBy Joseph Lynch, John DiPonio
This report refers to the Chicago Deep Tunnel Contract 13A, which was the first contract let in the City of Chicago requiring the construction of deep drop shafts for the transportation of high level
Jan 1, 1997
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Construction Progress of the Ottawa LRT Line - From Early Design Stages to Current Construction MilestonesBy Franz Wilhelmstoetter, Christian Karner
"The Confederation Line is phase one of Ottawa’s light rail transit, which consists of 13 stops and stations. The project’s center piece is a 2.5 kilometer (1.6 miles) long tunnel with three undergrou
Jan 1, 2016