Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Crushing Control At Kennecotts?s Ray Mines Division - IntroductionBy Scott A. Norby
Kennecott's Ray Mines Division (RMD) is located in central Arizona. The pit and silicate plants are located at Ray while the 27,500 tpd concentrating facilities are located at Hayden, approximate
Jan 1, 1986
-
Crushing Developments at the Sierrita ConcentratorBy R. N. Woody, S. J. Work
Crushing development at Duval Corp.'s Sierrita concentrator in Sahuarita, Ariz., has been a continuing effort since plant startup in January 1970. The original crushing system was designed to pro
Jan 4, 1979
-
Crushing Flowsheet Simulation: Increased Productivity and Improved Flowsheet DesignBy K. Bryan, O&apos
A 10-year program to integrate crushing and screening models into daily flowsheet design practice has proven successful. A Circuit Analysis Program (CAP) is used worldwide to design and evaluate new a
Jan 1, 1987
-
Crushing Grinding And Concentrating At Mount WrightBy David Runnels
In September 1970, the Quebec Cartier Mining Company, started development of the Mount; Fright iron ore mine. The estimated ore reserve is in excess of 1,000,000,000 long tons with an average grade of
Jan 1, 1977
-
Crushing In The Aggregate IndustryBy I. L. Jennings
In most industrialized countries, the largest element of the mining industry in physical volume is that devoted to the extraction and processing of materials for use as construction aggregates. Requir
Jan 1, 1968
-
Crushing In The PitBy S. D. Michaelson
Open pits and quarries are the major sources of all "hard rock" tonnage mined today. Normally, ore is fractured from the pit face by blasting and then truck-hauled to a primary crusher where pro- cess
Jan 11, 1968
-
Crushing In The PitOpen pits and quarries are the major sources of all hard rock tonnages mined today. Normally, ore is fractured from the pit bench face by blasting and then truck-hauled to a primary crusher on the pit
Jan 1, 1978
-
Crushing In The Pit - Ore Fracture and TransportationBy S. D. Michaelson
Open pits and quarries are the major sources of all "hard rock" tonnage mined today. Normally, ore is fractured from the pit face by blasting and then truck-hauled to a primary crusher where processin
Jan 1, 1968
-
Crushing Plant Operation Review and Dust Collection SummaryBy G. P. Holmes
"Bell Copper is situated (Latitude 55°0''N, Longitude 126°14W) on Newman Peninsula on the east side of Babine Lake at an altitude of 2,450 feet above sea level. The mine site is approximately 170 mile
Jan 1, 1976
-
Crushing Plant Performance-Mount Isa Lead/Zinc ConcentratorBy Russell J
A sustained drop in the grade of Mount Isa lead-zinc-silver ore occurred in mid 1980. It was decided to increase concentrator throughput from 200 000 to 240 000 tonnes/four week period to maintain
Jan 1, 1978
-
Crushing Plant Process OptimisationCrushing Plant Process Optimisation Design of processes in order to find the most efficient solution to a specific task is a difficult problem. Often the number of solutions are large and the optimal
Sep 13, 2010
-
Crushing Plant Variations, Simulation and SamplingBy Per Svedensten
One of the most significant behaviour of a crushing plant is the constant variation in the process. The variation is caused by two major effects. The first and constantly changing is the rock material
Jan 1, 2014
-
Crushing Practice at AjoBy David Cole
THE New Cornelia Copper Co. is mining and treating a 'monzonite " porphyry" copper deposit that is all hard rock. The oxidized surface shell, which constitutes the leachable part of the orebody,
Jan 1, 1925
-
Crushing Practice At Reserve Mining CompanyBy A. S. Henderson
Eastern Mesabi taconite is one of the hardest rocks known, but fortunately it shows little tendency to pack in the crushers, when the minus 5/16 inch material is removed. The crushing circuit is essen
Jan 1, 1959
-
Crushing Practice At The Braden Copper CompanyBy E. R. Johnson
THE copper concentrator of the Braden Copper Co. is at Sewell, Chile, on the western flank of the main Cordillera of the Andes, at an air distance of approximately 50 miles southeast of Santiago, the
Jan 1, 1947
-
Crushing Practice in the SouthwestBy David, Cole
THE years 1914-15-16 were a pioneering period in mining, milling, and copper metallurgy generally. It was uncertain just what path the crushing, grinding, and concentrating processes would take. This
Jan 1, 1931
-
Crushing Practice, New Cornelia Copper Co.By W. L. Dumoulin
A RATHER detailed description of the entire plant and leaching process was given in a paper recently presented to the Institute,1 so this paper will cover briefly only the crushing practice of the New
Jan 8, 1919
-
Crushing Resistance Of Various OresBy Luther Lennox
DURING the last few years, one of the great problems in the milling of all ores has been that of crushing. This subject involves not merely the cost of the operation, but also the selection of the pro
Jan 8, 1918
-
Crushing Resistance Of Various Ores-DiscussionC. Q. PAYNE, New York, N. Y. (written discussion*).-The method adopted by Mr. Lennox is a very interesting test of the practical application of Mr. Gates' crushing-surface diagram to a greet vari
Jan 10, 1918
-
Crushing Tests By Pressure And ImpactBy Fred C. Bond
COMPRESSION TESTS THE standard method of determining the crushing resistance of rocks consists of crushing prepared shapes under slow compression, and expressing the ultimate crushing resistance at
Jan 1, 1946