Search Documents

Sort by

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • TMS
    Design and Commissioning of a Laboratory Scale Electrocoagulation Reactor

    By Padmavathy Mahadevan, Samir Chefai, Eduard Guerra

    "Electrocoagulation is a technique for treating wastewater streams from metallurgical plants whereby electrodes are corroded to generate gases (most notably oxygen at the anode and hydrogen at the cat

    Jan 1, 2012

  • CIM
    Design and Commissioning of Commercial Coal Preheating Plants

    By R. H. Chambers, L. Alderman

    "The paper is introduced by an examination of the factors which have led to the present world-wide interest in charging preheated coal to coke ovens. Various possible methods of preheating and chargin

    Jan 1, 1972

  • TMS
    Design and Commissioning of the Ausmelt TSL Lead Smelter at Yunnan Tin Company Limited

    By Ross Baldock, Ross Andrews, Gu Helin, Lan Xu, Markus Reuter, Song Xingcheng

    "A commercial lead smelter using Outotec Ausmelt TSL Technology has been successfully commissioned and put into operation at Yunnan Tin Company Ltd operations near Gejiu City, in Yunnan Province, Chin

    Jan 1, 2012

  • SME
    Design And Commissioning Of The Macraes Pressure Oxidation Circuit

    By MD Cadzow, TW Quaife, DJ Lunt, TS Giraudo

    The Macraes Gold Project, operated by Gold and Resource Developments NL, engaged Minproc Limited to assist with the evaluation of a pressure oxidation circuit, this being the key component of a recove

    Jan 1, 2000

  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • AUSIMM
    Design and Commissioning of the Sepon Copper Pressure Oxidation Circuit

    By A G. Pavlides, B L. Weekes

    The Sepon Copper Project is located in the Savannakhet Province of Laos PDR and is operated by Lane Xang Minerals Ltd (LXML). An Ausenco - Bateman Engineering joint venture, the Khanong Development Gr

    Jan 1, 2005

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • SME
    Design and Construction Aspects of CSO Tunnel and Pump Station Systems

    By Verya Nasri, James Sullivan, Alex Varas

    "INTRODUCTION Many major cities in the United States have a combined storm water and sanitary sewer network. Regular rainfall overwhelms the system capacity and results in millions of cubic meters of

    Jan 1, 2016

  • SME
    Design and Construction Aspects of Pneumatically Applied Concrete Final Tunnel Linings - Recent Experience at the East Side Access (ESA) Project in New York

    By Alfredo Valdivia, Jesus Schabib, Vojtech Gall, William Cao, Curt Cicileo, Andrew J. Thompson

    "The East Side Access Project (ESA) involves the construction of geometrically complex underground structures including a large number of caverns and bifurcations. Initially conceived as dual lined st

    Jan 1, 2016

  • DFI
    Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits

    By Marco Fellin, Van E. Komurka

    Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.

    Jan 1, 2019

  • SME
    Design And Construction Challenges At The Gualcamayo Mine

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Fig. 1). A property of Yamana Gold Inc., it declared commercial production in July 2009 and has a total mineral rese

    Jan 1, 2011

  • SME
    Design And Construction Challenges At The Gualcamayo Mine ? Introduction

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re

    Jan 1, 2011

  • SME
    Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024

    By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor

    The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage

    Jun 23, 2024

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022

    By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck

    Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti

    Dec 1, 2022

  • SME
    Design and Construction Challenges for the North Temple Tunnel - NAT2022

    By Todd Kilduff, Michael Tinney

    The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En

    Dec 1, 2022

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021

    By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White

    The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame

    Jun 13, 2021

  • SME
    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023