Design and Construction of Dulles Airport TunnelsBy Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007
-
Design And Construction Of Earth Bottom ThickenersBy Edward S. Hsia
Pluor Utah has been closely associated with the engineering and construction of earth bottom thickeners for porphyry copper operations, for the counter-current decantation circuit of a gold cyanide pl
Jan 1, 1977
-
Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, VermontBy Bradford F. Townsend, Robin B. Dill, Richard M. Croswell
Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co
Jan 1, 1993
-
Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental IssuesBy Adrian Coombs
The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion
Jan 1, 2008
-
Design and Construction of Gold Hill Tailings ImpoundmentsBy Gordon I. McPhail, John D. Nelson
Tailings management represents a major portion of the cost associated with extraction of gold. For each gram of gold extracted, 150 to 200 kg of waste material is produced. Because of environmental co
Jan 1, 1987
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing TechnologyBy J. Ouellet
The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr
Aug 1, 2013
-
Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Design And Construction Of Lake Mead Intake No. 3 Shafts And TunnelBy Jon Hurt
INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3
-
Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, MalaysiaBy B Chapman, B Gaida, L Drowley
The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw
Sep 17, 2014
-
Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich BridgeBy Andrew Peterson
The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi
Jan 1, 1999
-
Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler
This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under
Jun 13, 2021
-
Design and Construction of London Cable TunnelsBy Michael Francis, Chris Darton
More than 55 km of tunnels have been constructed by TBM in the last 12 years to refurbish and upgrade the high voltage cable network in London. These include a tunnel of 20km length using EPBM machine
Jan 1, 2003
-
Design and Construction of Malana Hydroelectric Power Tunnel, IndiaBy Michel Claisse, R. P. Goel, André J. Rancourt, Kent Murphy
The Malana Hydroelectric Project is a private development located in HimachalPradesh State, India that was commissioned in June 2001. The plant was built and is owned by the Malana Power Company, a su
Jan 1, 2003
-
Design And Construction Of Micropiles Each Subject To 110 Kips Of Lateral LoadBy Andrew Baxter
The Crystal Bridges Museum of American Art in Bentonville, Arkansas is a beautiful glass and concrete structure cut into a valley that mingles with water ponds spanned by multiple bridges with suspend
Jan 1, 2008
-
Design and Construction of Mineral Processing Plants using Project ManagementBy A. J. Williams
"Whenever a decision is made to bring a mineral deposit into production, the Owner in actual fact has decided to convert substantial sums of capital into productive capacity with the intenti6n of maki
Jan 1, 1974
-
Design And Construction Of Minghu Power CavernBy C. Y. Kao, Roger Y. Cheng, C. S. Hsieh
The mushroom-shaped Minghu power cavern located in central Taiwan is 21.2 m (W) by 40.5 m (H) by 127.2 m (L) and is designed to house 4 units of power generating-pumping equipment with a total capacit
Jan 1, 1983
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Design and Construction of Natural Gas Transmission LinesBy B. W. Snyder
INTRODUCTORY THE earliest known case of transmission of natural gas by pipe lines was early in the Christian era when the Chinese used bamboo pipes to transport natural gas from surface seepages to h
Jan 1, 1951