Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall MiningBy Yoginder P. Chugh
This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga
Aug 1, 2013
-
Design and Field Testing of a Mobile Roof Support for Retreat Mining,By Robert R. Thompson
Retreat pillar mining is highly productive but dangerous. The primary danger during pillar removal is premature caving of the roof. Because the safety of the miners is dependent on successfully contro
Jan 1, 1986
-
Design And Full-Scale Testing Of The Mining Geometry In Division II Kamoto MineBy W. Blake, J. Mahaut, W. Hustrulid
Division II at Kamoto mine in Kolwezi, Zaire represents a transition zone between Divisions I and III where transverse and longitudinal cut-and-fill rooms were being mined. Because this transition zon
Jan 1, 1977
-
Design and Geotechnical Aspects of Microtunnel Crossings Below Active Rail AlignmentsBy Andy J. Robinson, Mark D. Claassen
Railroad companies and transit authorities have been slow to acknowledge that for many—utility crossings, a direct pipe installation below live rail can be just as effective as a more intrusive tradit
Jan 1, 2003
-
Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, BrisbaneBy Baxter D. A
This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r
Jan 1, 1993
-
Design And Hazard Assessment Of Mine Ore PassesBy M. J. Beus
This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro
Jan 1, 1996
-
Design and Implementation of a Brownfield Sag Pre-Crush CircuitBy G. Castillo, G. Thies, C. Bissue
"Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond
Jan 1, 2013
-
Design and Implementation of a Fully Integrated Mine Information Management SystemBy Thomas S. Kovach
In today's competitive energy market, every effort must be made to assure the lowest possible production cost. 'rhi s. paper describes the cooperative effort between the coal producer and th
Jan 1, 1989
-
Design And Implementation Of A Multimodal Transportation Cost Analysis Model For Domestic Lignite Supply In Turkey ? SynopsisBy E. Demir
Transportation cost is the dominant cost and accounts for almost half of the total mining cost in surface mining. Therefore, determining transportation cost is critically important for the economic fe
Jan 1, 2012
-
Design and implementation of a polycarbonate safe haven wall in an underground coal mine - SME Transactions 2013By R. A. Meyr, K. A. Perry
Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by the U.S.Congress. The U.S. Mining Safety and Health Administration subsequently released the Final Rule on Refuge A
Jan 1, 2013
-
Design and implementation of a process control system for column flotationBy A. LA. Salama, D. B. Hyma
"The Western Research Centre (WRC) of CANMET located in Devon, Alberta, is a modern research facility offering services ranging from fundamental research to pilot plant investigations. Recently, a 0.
Jan 1, 1993
-
Design and Implementation of a Semi-automated Truck/Shovel Dispatching SystemBy Y. Lizotte
This paper describes the design and implementation of the dispatching system at LAB Chrysotile Inc.'s Black Lake Mine Operation, Quebec, Canada. The initial system uses a computer in a passive ro
Jan 1, 1987
-
Design and Implementation of a Supplemental Atomizing Spray System for Dust Control in Deep Cut Continuous MiningBy J. Dilbeck, J. K. Ratliff, T. Petrov, Z. Brown
"In efforts to improve dust control during deep cut continuous mining a supplemental atomizing spray system, mounted on 14CM15 continuous miner, has been designed and successfully implemented in a U.S
Jan 1, 2019
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG MillBy Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010
-
Design And Implementation Of An Environmental Audit ProgramBy Jerry W. Danni, John E. Hardaway
Corporations today must comply with an ever growing number of complex and increasingly stringent environmental laws and regulations. An environmental audit program is an effective means in which to un
Jan 1, 1992
-
Design And Implementation Of An Onoune Optimising Control System For Processing The Sadiola Hill Oxidised Gold OreBy O. Guyot, T. Mulpeter
Sadiola Hill mine is located in the sub-Saharan part of Mali. In its first two years of operations, Sadiola Hill mine had already exceeded expectations with respect to profitability, plant capacity, m
Jan 1, 2000
-
Design and Implementation of Low Cost Measurement System for Determination of Thermal Conductivity CoefficientBy N. J. Rarmrez, C. Perez, J. D. Calderon, L. Lopez
"Among the thermal characterization of any material, one of the variables to know is the coefficient of thermal conductivity because this value can tell how much heat passes through the material and i
Jan 1, 2011
-
Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, SwedenBy M. Nzotta, L. Teng, S. Seetharaman, A. Chychko
The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses
Jan 1, 2011
-
Design And Implementation Of New Moulds For The CastersBy Chad B. Donovan
There is a strong need in North America and other major steel producing markets where major capital investment in new equipment has been minimal over the past several years to make improvements to exi
Oct 30, 2017