Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Implementation of Solar‑Powered Optical Fiber‑Based Illumination and Communication System for Underground Coal Mines - Mining, Metallurgy & Exploration (2023)By Dushasan Kundu, B. N. Shivakiran Bhaktha, Khanindra Pathak, Sarbojit Mukherjee
Mine safety and quality of life of miner working in underground mines depend to a large extent on mine illumination and communication. The provisioning of reliable, safe, and cost-effective illuminati
Apr 14, 2023
-
Design and Implementation of the In-the-Wall Ramp at Marvel Loch South PitBy K Williams
Marvel Loch South Pit has had a number of stages of open and underground mining activities before acquisition by Sons of Gwalia. The historical pit had achieved a completed pit depth of 150 metres and
Jan 1, 2003
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Design And Installation Of A 1818 Tonnes, 273 Meter Lift, Vertical Conveying System At White County Coal Pattiki 2 Mine, Carmi IllinoisBy S. Crewdson
Vertical hoisting of materials using hoists and skips is common in the Mining Industry. These systems have a number of drawbacks, one being limited hoisting capacity at medium depths. FKC-Lake S
Jan 1, 2003
-
Design and Installation of Gudrun Platform Jacket PilesBy Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Design and Installation of Helical Piles for Support of Bridge Pier FoundationBy David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water SystemBy Jean-Pierre Nossereau, Allen J. Hulshizer
The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in
Jan 1, 1981
-
Design And Installation Of Pressure-Grouted, Drilled Displacement PilesBy Willie M. NeSmith
The use of drilled (screwed) displacement piles is an emerging sector of the United States deep foundation industry. During installation of these systems, a Ko to Kp environment is created in the mate
Jan 1, 2002
-
Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter SewerBy Naresh Koirala
The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft
Jan 1, 2004
-
Design And Instrumentation Of A Large Reverberation ChamberBy Roy C. Bartholomae, Jeffrey Shawn Peterson
1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci
-
Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium DepositsBy Shaw-Shong Liew
This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa
Jan 1, 2002
-
Design And Load Test Of Micropiles In A Power Plant In MissouriBy Bidjan Ghahreman
A total of 120 micropiles were constructed for foundations of a new selective catalytic reduction (SCR) unit in a coal-fired power plant east of Kansas City, Missouri. Construction was performed unde
Jan 1, 2009
-
Design and Maintenance of Platework and Vessels in MinesBy A. J. Paul Laprairie
The process for which it is to be used is too often the only consideration in the design of a vessel. A de-sign allowing for practical manufacture and erection, as well as for proper maintenance, can
Jan 1, 1963
-
Design And Manufacture of Conveyor Pulley Assemblies for Drummond Coal Shoal Creek Slope BeltBy Rick Sarkisian, Albert D. Bonneau, David Keech
The Drummond Co. Inc.'s Shoal Creek Coal Mine Slope Belt Conveyor transports 5000 mtph (5500 tph) of material over a length of 1400 m (4600 ft.) and a lift of 3609 m (1180 ft.). Four 1500 kW (200
Jan 1, 1996
-
Design and manufacturing of a teleoperated excavator platform APCOM 2021By M. Salimov, J. Sattarvand
The conventional visualisation method of remote equipment is through the installation of one or more cameras on the machine, and sending a live feed to the operator’s flat display. However, the perfor
Sep 1, 2021
-
Design and Materials Selection of Autoclaves and Auxiliary EquipmentBy P. Cheung, J. Gulyas, R. Clary
Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who
Jan 1, 2004
-
Design And Operating Characteristics For Large Flotation Cells ? HistoricalBy Nathaniel Arbiter
The development of flotation machines since the first industrial use of the process can be divided into three stages. The first, up to about 1930, was marked by diversity in the means for contacting f
Jan 1, 1979
-
Design And Operating Characteristics Of The New Olen Tank HouseBy C. Geenen
At its Olen site, Union Minière Copper operates a new full-size deposit tank house. A first 200,000 t/y module was commissioned in October 1996, and an additional 130,000 t/y unit started in April 199
Jan 1, 1999
-
Design and Operating Considerations for the Application of a Dry Grinding and Roasting Circuit for Refractory Gold OreBy P. G. Semple, K. W. Major, P. Eng.
The recent increase in development of refractory gold deposits has resulted in changes to the traditional treatment processes. The selection of the preferred refractory treatment process is dependent
Jan 1, 1990
-
Design And Operating Experiences With Flotation Columns In ChinaBy Guoming Liu, Weibai Hu
The designing aspects of column profile, cross-section and height, types of aerator or air sparger, and feeding and discharging devices have been designed and tested. In operating aspects, the flotati
Jan 1, 1988