Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a
Jan 1, 2009
-
Design and Quality Control of Soil Mix Walls for Earth and Water Retaining StructuresBy Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock
"In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to
Jan 1, 2015
-
Design and R&D Progress of China’s Largest Underground Nonferrous Mine—Pulang Copper MineBy Zhang Wei
"Pulang Copper Mine is located in Shangri-La county, Diqing Prefecture, Yunnan Province, with currently defined copper reserve of 4.8 million tonnes of copper metal and an average grade of 0.34% Cu. T
Jan 1, 2016
-
Design and Rehabilitation of Large External Waste Dumps: a Case StudyBy Fletcher G
This paper will outline the design process, and the constmction and rehabilitation techniques proposed for the external waste dumps associated with the mining of the Wolfang Basin coal measures.The ba
Jan 1, 1992
-
Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and TunnelsBy Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister
The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe
Jan 1, 2005
-
Design and Scale-Up Criteria for Column FlotationBy Mankosa MJ, Yoon R-H
A reliable scale-up procedure for column flotation must address three important areas of column design, ie column geometry, sparging system and wash water distribution network. The column geometry i
Jan 1, 1993
-
Design and selection of equipment for deep underground mine pumping systemsBy M. J. Davie, D. S. Ross
"The successful design of a new mine water pumping system is in part dependent upon the accuracy with which the operating conditions can be forecast. This paper outlines the data which should be obtai
Jan 1, 1980
-
Design And Simulation Analysis Of Dewatering HydrocyclonesBy AJIT SWAIN, SUNATI MOHANTY
The ability to predict the dewatering performance of an industrial hydrocyclone from a laboratory-model hydrocyclone is of great importance. In this study, laboratory-scale hydrocyclone experiments we
Mar 1, 2023
-
Design and Simulation Analysis of Dewatering Hydrocyclones (Mining, Metallurgy & Exploration)By AJIT SWAIN, SUNATI MOHANTY
The abstract discusses the importance of predicting the dewatering performance of industrial hydrocyclones from laboratory models. It highlights the challenge of scaling up design and operating parame
Mar 30, 2022
-
Design and Simulation of a Piezoresistive Mems Pressure Sensor for Marine ApplicationsBy Shekhar Bhansali, Shyam Aravamudhan
"This paper reports on the design and simulation results of a silicon bulk-micromachined diaphragm-type piezoresistive pressure sensor capable of operating linearly over a wide dynamic range (0-1000 m
Jan 1, 2004
-
Design And Specification Considerations For Environmental Cutoff WallsBy Daniel Ruffing, Jeffrey Evans
Vertical cutoff, or barrier, walls are an integral part of environmental site remediation efforts. Vertical barriers are commonly deployed to limit the influx of clean ground water and/or to control t
-
Design and Specification of Permanent Shotcrete Tunnel LiningsBy D Mather
Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a
Mar 8, 2011
-
Design and Stability of ExcavationsBy Robert H. Merrill
7.1-STABILITY OF SLOPES IN SOIL AND ROCK ROBERT H. MERRILL 7.1.1-DESIGN ANALYSIS APPROACHES The analyses of slopes in soil or rock can be made through application of soil- or rock-mechanic
Jan 1, 1973
-
Design And Start Up Of The Cortez Gold Mines Pipeline MillBy R. N. Powell
The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the
Jan 1, 1999
-
Design and Start-Up of a Circulating Dry Scrubber System for So2 Abatement from Rotary KilnsBy Marc-André Villiard, C. St-Onge, V. Silla, J-C Milot
Rio Tinto Fer et Titane (RTFT) operates a metallurgical complex in Sorel-Tracey, Canada. In the Ore Preparation Plant (OPP), ilmenite ore is roasted through four parallel rotary kilns generating 95% o
Jan 1, 2015
-
Design and Startup of Cortez Gold Mine’s Pipeline MillBy Randy N. Powell
The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas
Jan 1, 1999
-
Design and Startup of the Cove MillBy M. Jennings
In 1987, Echo Bay discovered a major silver/gold ore body at their McCoy property in Nevada, and quickly made a decision to build a 5000 tpd mill which was expanded during the design to 7500 tpd. Sinc
Jan 1, 1990
-
Design And Startup Of The Pinto Valley Digital Control SystemBy Wayne D. Gould, Terry O. Arney
The Pinto Valley digital control system is a supervisory system interfaced with a conventional analog control system. The design criteria, the hardware selection, and the startup of the system in the
Jan 1, 1978
-
Design And Startup Of The Pinto Valley Digital Control System ? IntroductionBy Terry O. Arney
This paper is a description of the digital Data Acquisition and control System that is installed at Cities Service's Pinto Valley Concentrator. Pinto Valley Concentrator ? The Pinto Valle
Jan 1, 1976
-
Design And Subsurface Construction At Yucca Mountain, NevadaBy John F. Beesley
INTRODUCTION This paper discusses the design of the subsurface nuclear waste repository at Yucca Mountain, Nevada; and possible concepts for construction of the subsurface facility. Subsurface constr