Search Documents

Sort by

  • ISEE
    Design Criteria for Sequential Blasting

    By A B. Andrews

    The use of sequential blasting techniques that combine surface and in-thehole delays has provided blasters with increased flexibility in blast design to promote good rock fragmentation and displacemen

    Jan 1, 1981

  • SME
    Design Criteria For Thin Seam Shearer Longwall

    By T. C. Bibb

    Longwalls using shearers in seam heights of less than 1.2 m (48 inches) are relatively rare in the U.S. Westmoreland Coal Company is currently operating a shearer-equipped longwall at a cutting height

    Jan 1, 1985

  • SME
    Design Criteria For Uranium Ion Exchange In A Fluid System

    By D. E. Traut

    A fluidized countercurrent ion-exchange system was developed, operated, and evaluated by the Bureau of Mines. The system consisted of integrated multiple-compartment absorption and elution columns in

    Jan 1, 1975

  • AIME
    Design Criteria for Uranium Ion Exchange in a Fluidized System

    By I. L. Nichols, D. C. Seidel, D. E. Traut

    A fluidized countercurrent ion-exchange system was developed, operated, and evaluated by the Bureau of Mines. The system consisted of integrated multiple-compartment absorption and elution columns in

    Jan 1, 1977

  • DFI
    Design Criteria Of Dynamic Consolidation ? Synopsis

    By Z. Q. Wang

    The author is trying to clarify the existing problems in designing and laying out dynamic consolidation for soft ground improvement. Field testings and observations including vibrational parameters, p

    Jan 1, 2010

  • AIME
    Design Criteria of Longwall Face Supports

    By T. N. Singh, B. Singh

    SUMMARY. The supports account for over 501 of the total expenditure for a longwall face. The success and economics of a face depend upon the optimum selection of type and density of the supports. Empi

    Jan 1, 1982

  • AIME
    Design Criteria Of Mined Land Reclamation

    By Charles V. Riley

    While the late 1960's are known as the years of the public recognition of impending environmental crises, the 1970's will be known as the decade of public concern for improving the quality o

    Jan 3, 1973

  • SME
    Design Criteria Of Mined Land Reclamation

    By Charles V. Riley

    While the late 1960's are known as the years of the public recognition of impending environmental crises, the 1970's will be known as the decade of public concern for improving the quality

    Jan 1, 1972

  • SME
    Design Criteria: The Formal Basis of Design

    By John W. Scott

    INTRODUCTION The design criteria for a particular concentration and dewatering project will provide the formal basis for design of the process, equipment and facilities. These criteria will specif

    Jan 1, 1986

  • SAIMM
    Design Curve Diagram For Yield Plastic Fluids

    By D. J. Hallbom

    A new graphical method termed the ?Design Curve Diagram? (DCD) has been developed to analyse non-Newtonian pipe flow data by relating the plastic Karman number to the plastic Reynolds number. Since th

    Jan 1, 2007

  • DFI
    Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.

    By Paul M. Wiltcher

    This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas

    Jan 1, 2006

  • AIME
    Design Development of Crushing Cavities

    By H. M. Zoerb

    Based on the belief that operating details are a definite contributing factor to major economies, this paper traces the development of crushing cavity design in Symons cone crushers to attain maximum

    Jan 6, 1953

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024

    By Joseph Goessling, Mark Kroncke, James Parkes

    The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austi

    Jun 23, 2024

  • AUSIMM
    Design Developments of the Jameson Cell

    By S Bourke, R Stone, B Hill

    Since Jameson Cell flotation technology was first installed in a coal flotation application in 1988/89 at Newlands Coal Handling and Preparation Plant (CHPP) there have been fundamental improvements t

    Jan 1, 2005

  • SME
    Design Diagrams for Estimating Tunnel Face Stand-Up Time in Water-Bearing Ground

    By R. Schuerch, G. Anagnostou, R. Poggiati

    "The paper presents dimensionless design diagrams for estimating the stand-up time of a tunnel face in saturated ground of medium-low permeability. The diagrams cover a wide range of ground parameters

    Jan 1, 2016

  • SME
    Design Engineering And Technical Assistance On Construction And Operation Of The Sang Dong Chemical Plant In The Republic Of Korea

    By C. H. Lee

    The world-famous Sang Dong Mine in the Republic of Korea has long been one of the world's greatest tungsten ore deposits. Over the years, the development of the Sang Dong deposit has steadily inc

    Jan 1, 1962

  • DFI
    Design Equations For Laterally Loaded Piles Embedded In Sand

    By T. G. Davies

    The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to

    Jan 1, 2010

  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005

  • AIME
    Design Examples of Open Pit Slopes Susceptible to Toppling

    By Alan F. Stewart, Douglas R. Piteau, Dennis C. Martin

    Three examples of open pits where toppling failure controls the stability and design of the slopes are described. Two examples involve the design of overall slopes in base metal mines. The third examp

    Jan 1, 1983