Search Documents

Sort by

  • NIOSH
    Design Methodology For Standing Secondary Roof Support In Longwall Tailgates

    By James J. Bryja, Thomas M. Barczak, Dennis R. Dolinar, Joe Bower, Thomas P. Mucha

    Maintaining ground stability in the gate roads, particularly the tailgate, has always been critical to the success of longwall mining, both in terms of safety and productivity. Several new support tec

  • NIOSH
    Design Methodology For Standing Secondary Roof Support Systems

    By Thomas P. Mucho, Thomas M. Barczak, Dennis R. Dolinar

    Maintaining ground stability in the gate roads, particularly the tailgate, has always been critical to the success of longwall mining, both in terms of safety and productivity. Several new support te

    Jan 10, 2000

  • SME
    Design Methodology of Pumpable J-Crib Stopping Wall and Jennmar High-Strength Stopping Panel Wall

    By Xiaoting Li, Richard Adasiak, Benjamin Mirabile

    Pumpable J-Crib stopping walls and Jennmar high-strength (HS) stopping panel walls are widely used for resisting high-ventilation air pressures and roof support in underground mines due to their insta

    Jul 1, 2023

  • SME
    Design Methodology Used for the Lake Mathews Outlet Facilities Project

    By S. Dubnewych, S. Kieffer, M. T. McRae, R. R. Redd

    The seismic vulnerability of the existing outlet tower at Lake Mathews reservoir, located in Riverside County, California, necessitated the design of a new outlet facility to assure serviceability of

    Jan 1, 1999

  • SME
    Design Methodology, Testing And Evaluation Of A Continuous Miner Cutterhead For Dust Reduction In Underground Coal Mining

    By B. Asbury, M. Cigla, C. Balci

    The Western Mining Resource Center (WMRC) at the Colorado School of Mines (CSM) received a grant from the National Institute for Occupational Safety and Health (NIOSH) to perform a study that will hel

    Jan 1, 2002

  • IOM3
    Design methods for controlled blasting

    By O. Dojcar

    Equations for calculating the parameters of controlled blasting (burden and spacing of boreholes and weight of the bottom charge) are derived and analysed on the basis of empirical values and made mor

    Dec 1, 1996

  • CIM
    Design Methods for DC Arc Furnaces to Enhance Furnace Integrity

    By Q. G. Reynolds, R. T. Jones

    The choice of furnace design parameters has a marked effect on the integrity of the furnace that is constructed. The design methodology for DC arc furnaces typically begins with the chemical reactions

    Jan 1, 2015

  • DFI
    Design Methods For Earthquake-Induced Pile Bending

    By George Mylonakis

    The curvatures and subsequent bending imposed to piles by the surrounding soil during the passage of strong seismic waves is studied. This type of bending develops even in the absence of a superstruct

    Jan 1, 2002

  • NIOSH
    Design Methods To Control Violent Pillar Failures In Room-And- Pillar Mines - Synopsis

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard for miners and mine operators. This type of failure, termed a 'cascading pillar failure' (CPF), oc

  • IOM3
    Design methods to control violent pillar failures in room-and-pillar mines

    By R. K. Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard for miners and mine operators. This type of failure, termed a cascading pillar failure, occurs when one pill

    Jun 19, 1905

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • SME
    Design model for underground haulage systems

    By H. Sevim

    A new method of designing haulage systems, consisting of belt conveyors and hoists for underground mines is discussed in this paper. Efficient and economic design of such systems will prevent operatio

    Jan 1, 1987

  • TMS
    Design Modifications At Zaldivar To Reach Plant Capacity Production

    By C. García

    Several modifications to Zaldivar's original design have been made in order to reach the design cathode production. This paper describes the modifications to the crushing, leaching, solvent extra

    Jan 1, 1999

  • SME
    Design Of A Bubble-Separation Tank For Water Treatment Using Computational Fluid Dynamics

    By P. R. Desam, J. D. Miller, A. Datta

    The flow behavior of bubble-particle aggregates in separation tanks is important for many flotation systems, particularly for wastewater treatment. These aggregates can be considered as the dispersed

    Jan 1, 2000

  • AUSIMM
    Design of a Carbon-in-Pulp Plant from the Engineering Company Viewpoint

    The process of establishing the design criteria is the key step in commencing a new project.. The method for establishing design criteria and translating them to a workable plant design is describe

    Jan 1, 1982

  • IMPC
    Design of a cellular automaton to determine the particle size distribution exiting a SAG mill

    By Rodrigo Ladrón, Gonzalo Rund, Gonzalo Montes-Atenas

    Modelling ore comminution processes have been a highly fruitful scientific topic. The models have been proved to be largely dependent on the selected comminution technology. Among them, semiautogenous

    Jan 1, 2014

  • AUSIMM
    Design of a Continuous Monorail Drilling System for Decline Development

    By M Kuruppu, B Besa

    Currently, conventional methods of decline development put enormous cost pressure on the profitability of mining operations. This is the case with narrow vein orebodies where current methods and mine

    Jan 1, 2008

  • SME
    Design of a Continuous Pilot-Scale Deslime Thickener

    By S. K. Kawatra, H. J. Haselhuhn

    "Thickening is used during two primary mineral processing operations: water removal and desliming. During water removal, the pulp density is increased through the injection of flocculants. These flocs

    Jan 1, 2017

  • CIM
    Design of a Control Strategy for Kidd Creek Grinding Circuit Line B

    By S. Pinard, A. Desbiens, R. del Villar, D. Jakelski

    "During the fall of 1993, a new Pill-based control strategy was installed in the B grinding circuit at the Kidd Creek Division of Falconbridge Ltd. The control strategy was first evaluated on a grindi

    Jan 1, 1994