Design Procedure and Results from a Field Test of Soil Freezing as Stabilisation of Bottom Slice FillBy P Andersson, P Marklund
Evaluation of different techniques for bottom fill stabilisation showed that frozen fill was the most economical method. In order to test the method a full-scale field test was performed in the Rehnst
Jan 1, 1998
-
Design Procedure for Arch Canopies for Rehabilitation of High-Roof-Fall AreasBy Richard A. Allwes
A procedure is presented for the design of an arch canopy for the application of rehabilitating a high-roof-fall area. This procedure is specifically developed for evaluating an unbackfllled arch cano
Jan 1, 1986
-
Design Procedure For Hydraulic Backfill Distribution SystemsA wide range of materials are used in hydraulic backfilling operations and the pipeline flow behaviour of these mixtures varies considerably. It is shown that despite the large differences in constitu
Jan 1, 2001
-
Design Procedure Optimizes Roof Truss Installations In Bedded Roof - ObjectiveProvide mine personnel with a convenient means of determining the optimum installation geometry of roof trusses in bedded roof. Background Mine operators frequently ask the following questions
Jan 1, 1989
-
Design Process And Equipment Selection For Auxiliary Ventilation SystemsBy D. G. Mirakovski, B. Krstev
The paper presents models of auxiliary ventilation systems with leaky ducts and algorithms for calculations of pressure loss, air leakage, and volume flow ratio and pressure fans. Two basic models are
Jan 1, 2002
-
Design Review Of A Rectangular Shaft In AlluviumBy P. D. Pack, E. H. Skinner
During design of a 550-foot rectangular shaft in alluvium, lateral support within the excavation was an anticipated construction problem. Actual experience showed that the nearly 9 x 14 foot excavatio
Jan 1, 1977
-
Design Risk Management at Mt Leyshon Gold MineThe Mt Leyshon Gold Mine is located 30 kilometres south of Charters Towers in Northern Queensland. The current open cut mine has been in operation since 1986. In 1992 a feasibility study was complet
Jan 1, 1994
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Design Rules For Avoiding Draw Horizon Damage In Deep Level Block CavesDeep level block caving as a mining method is becoming more popular due to the fact that it is the lowest cost per ton underground extraction system. However, many block caves do not achieve their ful
Jan 1, 1999
-
Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide SlurriesBy Hawes GW
Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv
Jan 1, 1988
-
Design Selection for Large-Scale Grinding Operations ù AG/SAG or HPGR?By J Hudson
Autogenous (AG) and Semi Autogenous (SAG) grinding mills are the conventional selection for large-scale grinding circuits. It is accepted that these forms of comminution are not the most energy effici
Jan 1, 2006
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Design Spans ? Underhand Cut and Fill MiningBy Rimas Pakalnis
This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r
Apr 1, 2005
-
Design Spans – Underhand Cut And Fill Mining (a912b9dd-cc3d-4815-9ae5-05c7be299ff3)By Rimas Pakalnis, Ted Williams, Tom Brady, Wilson Blake, Mary MacLaughlin, Kathryn Clapp, Cristian Caceres, Mario Morin
This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r
-
Design Specifics of Hard-Rock Caverns for Hydrocarbon Storage; 50 Years of Feedback and Recent DevelopmentsBy Nicolas Gatelier, Sophie Laurent, Thierry You
Hard-rock caverns for hydrocarbon storage are a very particular type of underground facility controlled not only by local administrative and regulatory constraints that can be very specific, but also
Jan 1, 2015
-
Design Strategies For Selective FlocculantsBy G. R. O?Neil
The justification for a "ligand- selective' approach to fine mineral beneficiation via flocculation is established initially. Special emphasis is placed upon the need to identify non-selective, i
Jan 1, 1983
-
Design Strategy For Deep Slurry Stabilized Bored Piles In CompressionBy Chu E. Ho
Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p
Jan 1, 2002
-
Design techniques for sublevel caving layoutsBy D. A. Trotter, G. J. Goddard
"This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program
Jan 1, 1981
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessmentBy A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017