Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding TechnologyBy Lyne Côté, Jose Adante
"The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n
Jan 1, 2009
-
Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production LocomotiveBy Marc C. Bétournay
A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop
May 1, 2003
-
Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotiveBy A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté
"A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr
Jan 1, 2004
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Design-Bid-Build Contracting: Climbing Out of a Paradigm SinkholeBy Randall J. Essex
Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be
Jan 1, 2003
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and ShaftBy Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex ProjectBy Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade
This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a
Jan 1, 2003
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Design-Build Support Of Excavation For Block 76, Salt Lake City, UtahBy Rick Deschamps
The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake
Jan 1, 2009
-
Design-Build Synergy To Deliver Pile FoundationsBy David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
Design-Build: Elevating Partnering to a Higher LevelBy Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring
The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value
Jan 1, 2003
-
Design-By-Analysis of Water-Cooled Gas Handling DuctsBy T. Plikas, T. Porretta, M. Al-Dojayli, B. Pretorius, J. Woloshyn, H. Ghorbani
"Water-cooled ducts represent an integral part of high temperature off-gas systems in metallurgical processes. Typically, off-gas enters these ducts at significantly elevated temperatures; therefore,
Jan 1, 2017
-
Design. Aspects of Ground Consolidation by the Freezing Method for Shaft Sinking in SaskatchewanBy Witold J. S. Ostrowski
Stabilization of water-bearing sediments by the freezing method for shaft sinking has been used for over 80 years on the European Continent. The real application of this method in Canada started with
Jan 1, 1967
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Design/Build Highway Blasting - Case StudyBy Cathy Aimone-Martin, Frank Achuff
The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA) have let a contract to Sierra Blanca Constructors for a design / build contract along 38 miles US 70 i
Jan 1, 2004
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLOBy Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Design?a strategic issue - SynopsisA set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and c
Jan 1, 2009
-
Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case HistoryBy Christopher J. Pacitto
This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe
Jan 1, 2002
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999