Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design, Construction, and Operation of Periodic Reverse Current Process at TamanoBy Tatsuzo Kitamura
The tank house of Tamano refinery, that started its operation in January, 1972, was constructed incorporating the application of Periodic Reverse Current (P.R.C.) from the outset of design works. In 1
Jan 1, 1976
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Design, Construction, and Start-up of Stillwater Mining’s East Boulder ConcentratorBy P. Lefebvre, J. Sargent, K. Major, B. Darnton
"Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin
Jan 1, 2003
-
Design, Construction, And Testing Of A Precast UHPC PileBy Thomas L. Vande Voort
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br
Jan 1, 2008
-
Design, Construction, Commissioning And Operating Of the Elura ConcentratorBy Morrison R. D
This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co
Jan 1, 1983
-
Design, Development and Operation of a Hardrock RoadheaderBy Bromley JC
Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up
Jan 1, 1987
-
Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machineBy R. Lovat, J. A. Hunter
"The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica
Jan 1, 1984
-
Design, Development, Application, and Operating Benefits of 100-m3+ Outokumpu TankCell Flotation CellsBy Adolf J. Jonaitis
Outokumpu developed TankCell flotation cell technology beginning in 1990, following 35 years of successful flotation cell experience and application. In 1994, Outokumpu proved favorable operating succ
Jan 1, 1999
-
Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring MachineBy Steve Polegato, J. Coady Marsh, Gary Landry
The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne
Jan 1, 1985
-
Design, implementation and field performance of a face destress blasting method for mine developmentBy E Villaescusa, C Drover, I Onederra
Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at
Nov 29, 2022
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York CityBy A Fareth
Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri
Jan 1, 2008
-
Design, Installation And Effectiveness Of A Degasification System At The Pasta De Conchos MineBy F. Gonzalez, A. Zambrano, J. Schwoebel, S. Kravits
Significant lost time delays were experienced by Carbonifera de Nueva Rosita, S.A. de C.V. ("CNR") during mining development of the Pasta de Conchos Mine ("the Mine") near Nueva Rosita, Coahuila, Mexi
Jan 1, 1993
-
Design, Installation And Operation Of The Pinto Valley Moly Flotation ColumnsBy R. Rodgers
The Pinto Valley Concentrator of BHP Copper Inc. restarted its sulphide mining operations in September 2007 to produce copper and moly concentrates. During the plant production ramp up, the copper/mol
Jan 1, 2010
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Design, Installation And Testing Of The No 250 Wemco Smartcell? Flotation Machine At Minera Los PelambresBy A Weber, L MacNamara, H Schreiber
Design and development of the world?s largest flotation cell was completed in 2002. This was the first 257 m3 flotation cell installed in the mineral industry and represents a major development in t
Jan 1, 2007
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa MineBy B Nielsen, H Lehto, B Musuku
"The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo
Oct 10, 2016
-
Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.By Fallins J
THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately
Jan 1, 1930
-
Design, Materials Combinations and RecyclingBy Remmerswaal, U. Boin, M. B. G. Castro
"To design sustainable products that can be recycled with high resource efficiency, low environmental impact and economic feasibility, the choice of materials and materials combinations, made in the d
Jan 1, 2003