    Determination Of Crystallite Size And Surface Roughness Of Copper Deposits For Electrowinning In The Presence Of An Organic Additive

    By Cesimiro Fabian

    The crystallite size of copper electrodeposits was determined by X-Ray powder diffraction analysis using a General Area Detector Diffraction Solution (GADDS) diffractometer. Crystallite size was calc

    Jan 1, 2003

  • AUSIMM
    Determination of cyanide and potentially toxic elements in gold tailings at Barberton, Mpumalanga, South Africa

    By K E. Mudzanani, T A. M Msagati, D T. Maiga, T T. Phadi, M R. Letsoal, B M. Chabalala, S W. Limani

    This paper addresses critical environmental, health, regulatory and scientific concerns related to gold mining activities in the specific area of Barberton, Mpumalanga, South Africa. The paper thus ca

    Apr 16, 2024

  • CIM
    Determination of D50 in Jet Diffuser Flotation Column by using the Velocity Gradient Approach

    By Bahri Öteyaka, Ali Uçar, Oktay Sahbaz

    "A Jet Diffuser Flotation Column (JDFC) is a newcomer flotation device whose operation principles similar with Jameson cell but it has an essential change in downcomer. By taking into account the hydr

    Jan 1, 2016

  • SME
    Determination Of Deep Pit Heat Regime Parameters - Introduction

    By R. Tanaskovic

    The objective of study of climatic conditions in underground mines is to create a working environment suitable for normal development of operations. Disregarding the fact that the development of equi

    Jan 1, 1980

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • IMPC
    Determination Of Diamond Ores Required Disintegration Size In Processing

    By A. V. Bogdanovich

    In diamond ores processing, final waste tailings size, rejected to dump, is one of the most important parameters. On one side, it is necessary to minimize losses of diamonds, whose size exceeds 1 mm,

    Sep 1, 2012

  • AIME
    Determination of Dissolved Oxygen in Cyanide Solutions

    By A. J. Weinig

    The method described is a modification of Schutzenberger's whereby the solution in titrations and the standards are protected from the atmosphere by a layer of kerosene. Indigo-disulfonate is th

    Jan 8, 1924

  • SAIMM
    Determination Of Drawpoint Spacing In Panel Caving: A Case Study At The El Teniente Mine ? Synopsis

    By R. L. Castro

    Currently, in several caving operations, the spacing between the drawpoints is determined by consulting Laubscher's design guide (Laubscher 1994, 2000), a methodology based on the gravity flow ch

    Jan 1, 2012

  • TMS
    Determination of Drop Size Distributions in a Continuous Mixer

    By M. C. Ruiz

    In the present study, the size distribution, Fo(v), of organic drops produced in a continuous-mixing vessel has been determined experimentally for various conditions. The organic phase used was a 1: 1

    Jan 1, 2001

  • AIME
    Determination Of Dust Losses At The Copper Queen Reduction Works

    By J. Moore Samuel

    INTRODUCTORY BEFORE the year 1909, no measurements of dust losses and flue gases had been made at the Copper Queen Reduction Works, at Douglas, Ariz. At that time the "unaccounted" loss of the smelte

    Jan 6, 1916

  • AIME
    Determination of Dust Losses at the Copper Queen Reduction Works (ARIZONA 1916)

    By J. Moore Samuel

    THE CHAIRMAN (WALTER DOUGLAS, NEW YORK, N. Y.).-Perhaps there is no problem that causes the modern metallurgist more worry than the question of unaccounted for loss. He has not the advantage of the me

    Jan 12, 1916

  • SME
    Determination Of Dynamic Permeability Changes During In-Situ Leaching At Cyprus Casa Grande Operation

    Dynamic permeability is a significant hydrologic condition associated with in-situ leaching at the Cyprus Casa Grande operations. Several factors contribute to changes in the permeability conditions.

    Jan 1, 1991

  • ISEE
    Determination of Dynamic Pressure and its Effect on Blasting

    By Ignacio Humeres Valdivia, Alejandro Ferrada Vergara

    In the latest years, the use of innovative blasting techniques has become more frequent in mines all over the world. Such techniques allow the miner to be more aggressive in the distribution of explos

    Jan 1, 2015

  • SME-ICGCM
    Determination of Effective Column Lengths for Resin-Grouted Roof Bolts

    By W. A. Cincilla

    The use of resin-grouted rock anchors continues to gain popularity in underground wall mines in the United States. It is estimated that during 1985, more than 30% and as many as 35% of all roof bolts

    Jan 1, 1986

  • AIME
    Determination Of Electrical Equipment For A Mine Hoist

    By Graham Bright

    THE rapid increase in reliability, the low cost f operation, the ready application of safety devices, and the growing availability of central-station power have made the question of installing a hoist

    Jan 9, 1921

  • TMS
    Determination of Energy Requirements for Ironmaking Processes: It’s not that Straightforward

    By Hong Yong Sohn, Miguel Olivas-Martinez

    "Different approaches are used for calculating the ‘energy requirement’ of a process. The determination of energy requirement becomes confusing for a process in which a fuel is also a reactant. The ke

    Jan 1, 2014

  • CIM
    Determination of Environmental Footprint for Various Types of Comminution Devices in Terms of Dust and Noise Emmission

    By D. Saramak, T. Gawenda, Z. Naziemiec, A. Saramak

    "Crushing and grinding operations are burdensome to the environment due to generating large amounts of dust, noise and waste during course of comminution operations. An indirect negative contribution

    Jan 1, 2016

  • SME
    Determination Of Equipment Availability

    By J. J. Sense

    The Mission Unit of American Smelting and 'Refining Company is located in Pima County, Arizona, approximately twenty miles southwest of the City of Tucson. The Unit consists of an open pit copper

    Jan 1, 1964

  • TMS
    Determination of FeO Containing Liquid Slag Surface Tensions Using the Sessile Drop Method

    By Clemens Schmetterer, Patrick J. Masset

    "The surface tension represents an important property for the modelling of high temperature processes. In this study the surface tension of two Al2O3 – CaO – SiO2 model slags and the influence of the

    Jan 1, 2011

  • AUSIMM
    Determination of Fineness of Silver by Volhard's Method, as Practised at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    THIS excellent volumetric method commends itself as a means of estimating the fineness of silver firstly, owing to the large number of possible impurities which do not affect its accuracy (these impur