Search Documents

Sort by

  • CIM
    Development and evaluation of proton conducting materials for PEMFC

    By T. Navessin

    Recent research activities in proton exchange membrane fuel cell (PEMFC) have significantly improved the performance per unit cost and its lifetime. These activities narrow the technology gaps, and th

    Jan 1, 2005

  • SAIMM
    Development and evaluation of technology for quantifying the mineral composition of process streams in the typical Dry Mill in the heavy mineral industry

    By G. van der Westhuizen, F. E. du Plessis

    Ticor South Africa operates a dry mill at the town of Empangeni in the province of KwaZulu-Natal on the east coast of South Africa. The dry mill processes a non-magnetic mineral stream constituting ru

    Jan 1, 2003

  • AUSIMM
    Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper Project

    By R Godard, J Gantumur, F Prince, C Pascoe

    Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera

    May 9, 2016

  • SME
    Development and Execution of a Risk Transfer Strategy for the Eglinton Crosstown LRT

    By Brian T. Hamilton, Richard Piliounis, Cian Murphy

    "The Eglinton-Crosstown Light Rail Transit line is a 19-kilometre corridor with a 10-kilometre underground portion currently being constructed by Metrolinx in Toronto through a densely populated urban

    Jan 1, 2016

  • DFI
    Development and Experiences on Versatile Applications of RD-pile Wall

    By Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen

    "Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist

    Jan 1, 2014

  • SME
    Development And Extinguishment Of Oil Shale Rubble Fires

    By M. J. Sapko

    The Bureau conducted, through joint funding with the Colorado Mining Association, large scale oil shale rubble fire tests to investigate flotability characteristics and different methods of extinguish

    Jan 1, 1989

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • ISEE
    Development and Field-Test of Low Density ANFO

    By S. Nakamura, H. Taniguchi, K. Noguchi, H. Sugihara, T. Matsuzawa

    It has been reported that expanded poIystyrene and ANFO prills ‘were mixed on a blasting site for controlled blasting (ISANOL). Although there seems to be few possibility of their segregation because

    Jan 1, 2001

  • TMS
    Development And Implementation Of A Common Corporate Management System For Safety And Health At International Mining Operations

    By K. B. Dotson

    A common international safety and health management system was developed. Analysis of selected major safety and health management systems from around the world was conducted. Functional elements of se

    Jan 1, 1999

  • AUSIMM
    Development and implementation of a digital sleep and circadian management tool for optimising sleep, health and safety in shift workers

    By S M. W Rajaratnam, P Varma, T L. Sletten

    Mining employees undertaking shift work are at considerable risk of experiencing sleep disturbances and circadian rhythm disruptions. In the complex, high-risk environment of mining, these sleep and c

    Apr 16, 2024

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017

  • SAIMM
    Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, Zambia

    By E. Munnik

    The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (CObalt from Slag And Copper as by-product) Project. Anir

    Jan 1, 2003

  • TMS
    Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, Zambia (Hydrometallurgy 2003)

    By E. Munnik

    The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (Cobalt from Slag and Copper as by-product) Project. An i

    Jan 1, 2003

  • CIM
    Development and Implementation of a Risk Mitigation Strategy to Mine a Primary-Secondary Production Stope in a High-Stress Environment at VALE Creighton Mine

    By Allan R. Punkkinen

    Safe extraction of the valued ore resource in the deep levels of VALE Creighton Mine has progressed in a pillar-less fashion using vertical retreat, slot-slash and uppers retreat methods since the ces

    Jun 1, 2012

  • SAIMM
    Development And Implementation Of An Electrically-Powered Stope Rockdrill For Tautona Mine - Synopsis

    By A van Jaarsveld

    Environmentally-friendly, safe and cost-effective technology for stope drilling has successfully been introduced at TauTona mine. It has enabled the problem of inadequate compressed air pressure and i

    Jan 1, 2008

  • CIM
    Development and Implementation of an Expert System for Grinding Control at the Dome Mine

    By John Eggert, Paul Benford

    "Since 1982, Placer Dome Inc. -Dome Mine has steadily increased mill throughput. Tonnage has increased from a nominal design capacity of 3000 short tons per day, attained in 1985, to 4130 stpd by the

    Jan 1, 1994

  • CIM
    Development and Implementation of an Operating Concept and Training Program for the Start-Up of the Stanleigh Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's Stanleigh Mill in Elliot Lake began production in June of 1983. The highly instrumented mill treats uranium ore at an average rate of 3900 metric tons per day. To help ensure

    Jan 1, 1985

  • SME
    Development and Implementation of Economic Material Splits at Chino Mines

    By David J. Gurtler

    In early 1988, Chino Mines Co. began using a system of economic splits for all materials encountered in mining. All mined material is evaluated as mill ore, solvent extraction electrowinning plant fee

    Jan 1, 1990

  • SME
    Development And Implementation Of Economic Material Splits At Chino Mines Company

    By D. J. Gurtler

    On January I, 1988, Chino Mines Company initiated the use of a system of economic splits for all materials encountered in mining. All mined material is evaluated as mill ore, solvent extraction-electr

    Jan 1, 1990