Search Documents

Sort by

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New Fans

    Full aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: IV. Aerodynamic Performance Trials

    Performance trials followed the commissioning of three large mine fans at Mount Isa in 1965. Actual performance characteristics were determined. These were in good agreement with predicted performance

    Jan 1, 1967

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • AIME
    Development Of The Ranger Uranium Financing From Banks, Customers, Shareholders, And The Stock Market

    By C. Richard Tinsley, Norman Miskelly, S. James Hodge

    Construction of the Ranger uranium project, located 230 kms east of Darwin in the Northern Territory, Australia, commenced in January 1979. Energy Resources of Australia Ltd (ERA) was incorporated in

    Jan 1, 1985

  • SME
    Development Of The Rapidex Continuous Spiral Drill And Blast Tunneler, Phase III

    By Carl R. Peterson

    The Rapidex continuous drill and blast tunneling concept utilizes a unique spiral blasting pattern that permits efficient performance with relatively small single shots, while at the same time directi

    Jan 1, 1977

  • ISEE
    Development of the Remote Controlled Blasting System for Tunnel Construction

    By Minoru Kawamura, Yukio Kato, Yoshikazu Hirosaki, Satoru Suzuki

    A wireless blasting system for tunnel construction which consists of a loop antenna, oscillator and blaster, has been developed. The basic technology of this method had been studied in the 1970s to de

    Jan 1, 1998

  • AIME
    Development of the Round Table at Great Falls

    By Arthur Crowfoot

    INTRODUCTION The principal object of this paper is to present data on the development of the revolving convex round table as a concentrator for the through 0.07-mm. slimes from the ores of the Butte

    Jan 8, 1914

  • CIM
    Development of the Salobo Project

    By Marcio Luis S. Godoy

    The Salobo Project will be the first Vale operation to use an HPGR mill to process copper-gold ore. The mine is located in Para state, southeast of the Amazon region in Brazil. The circuit was designe

    May 1, 2010

  • AIME
    Development Of The San Manuel

    PLANS for development of the San Manuel ore- body have been worked out and are progressing parallel with construction of the surface plant. This property lies in the Old Hat mining district, Pinal Cou

    Jan 7, 1954

  • SME
    Development Of The San Manuel Oxide Ore Reserve ? Present And Future

    By M. F. Vancas

    The San Manuel oxide ore reserve ranges in depth from being exposed on the surface to lying 1000 ft. beneath a conglomerate layer all of which is confined in the subsidence zone of an active sulfide b

    Jan 1, 1987

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • CIM
    Development of the Saskatchewan Potash Mines

    By Vern Evans

    Saskatchewan has historically been recognized for farming, but in 1943 while drilling for oil, potash was discovered. The initial attempt to gain access to the potash beds was unsuccessful, however, s

    May 1, 2011

  • CIM
    Development of the Science of Grinding

    By L. E. Djingheuzian

    "IntroductionDURING the past two decades an enormous amount of empirical data has been accumulating on grinding. These data have been obtained by mill operators on grinding ores with a diversity of ch

    Jan 1, 1952

  • AIME
    Development of the Screen Bowl Centrifuge For Dewatering Coal Fines

    By N. D. Policow, J. S. Orphanos

    Dewatering fine clean coal fractions, -595µm (-28 mesh), represents one of the most difficult and costly separations in typical plant circuits. Since 1969, the screen bowl centrifuge has offered an ec

    Jan 1, 1984

  • SME
    Development Of The Screen Bowl Centrifuge For The Dewatering Of Coal Fines

    By Neil D. Policow

    Dewatering of the fine clean coal fraction, - 28 mesh (595 microns) represents one of the most difficult and costly separations in typical plant circuits. Since 1969, the Screen Bowl Centrifuge has of

    Jan 1, 1982