Search Documents

Sort by

  • SME
    Optimization of Airflow Distribution in Mine Ventilation Networks Using the Modified Sooty Tern Optimization Algorithm - Mining, Metallurgy & Exploration (2024)

    By Lixue Wen, Jun Xiao, Dongping Shi, Yan Xue, Jinmiao Wang

    Mine ventilation energy consumption is one of the main sources of energy consumption in mining production, accounting for about one-third to one-half of the total energy consumption. Therefore, reduci

    Dec 20, 2023

  • SAIMM
    Optimization Of An Autonomous Vehicle Dispatch System In An Underground Mine

    By P. Saayman

    The mining industry has much potential for automation. A great deal of work has been done on this subject and is still ongoing. With automation comes the possibility for optimization, because more inf

    Jan 1, 2006

  • SAIMM
    Optimization of an Integrated Flowsheet for Barite Processing

    By R. Ciccu

    This paper examine the optimization of a beneficiation plant for recovering marketable barites from crude ores of different characteristics. The plant, part of a mining complex in Sardinia, consists o

    Jan 1, 1987

  • SME
    Optimization Of An Iron Ore Flotation System

    By M. E. Volin

    Reagent control for optimum concentrate yield was studied by laboratory batch flotation tests simulating the Groveland plant flotation circuit in which a rougher concentrate is cleaned twice. The reag

    Jan 1, 1965

  • SME
    Optimization Of Auxiliary Fan Placement For Large-opening Underground Stone Mines - SME Annual Meeting 2022

    By E. Watkins, V. Gangrade

    Large-opening stone mines often rely on natural ventilation and a network of auxiliary fans to produce adequate ventilation conditions in the mine instead of main mine fans, which are commonly utilize

    Mar 2, 2022

  • IMPC
    Optimization of ball mill and magnetic separators at 4th Iron ore production plant in Golgohar mining and industrial company

    By M. Amani, A. Akbarinasab, M. Bazmandeh

    The fourth iron ore production plant at Golgohar mining and industrial company consists a ball mill and wet medium intensity magnetic separators (3500 Guss). The ball mill product applies directly int

    Jan 1, 2014

  • AUSIMM
    Optimization of Bench blast Design with the Aid of Computer

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully- fractured zone, through a s

    Jan 1, 1992

  • SME-ICGCM
    Optimization Of Bench Blast Design With The Aid Of Computer (febe1846-7d11-4969-9dc5-f8d6a8a628b1)

    By Wei Wu

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully-fractured zone, through a seri

    Jan 1, 1992

  • ISEE
    Optimization of Blast Design For Under Ground Driveways in Indian Coal Mines

    By C. B. Navalkar

    The optimization of blast design under consideration is for the conventional driveways in under ground coal mines with respect to board & pillar workings in India. Basically The Blast Design includes

    Jan 1, 2002

  • ISEE
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is commonly adopted method in underground hard rock mining. Proper planning and its execution is the key requirement for stope extraction using this method. The stope extraction has b

    Feb 6, 2023

  • SME
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation - Mining, Metallurgy & Exploration (2024)

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is the most popular and practiced mining method in underground hard rock mines. Proper planning and its execution is the key requirement for stope extraction using this method. The st

    Dec 22, 2023

  • ISEE
    Optimization of Blast Evacuation Zones using the "Exclusion Zone" Module

    By C. Morel, P. Fredes, L. Rojas

    This article presents a comprehensive study on the development and application of the specific module called "Exclusion Zone" created by Orica to determine blast evacuation exclusion zones. This modul

    Jan 1, 2024

  • ISEE
    Optimization of Blast Fragmentation at Kisladag Gold Mine

    By Erkan Bayrak, Serkan Erkara, Ozkan Duzgun, Ekin Gungor

    This paper presents part of the outcomes of the drill and blast optimization project carried out at Kisladag Gold Mine in Turkey. Kisladag Gold Mine is the largest gold mine in Turkey with a low-grade

    Jan 1, 2015

  • ISEE
    Optimization of Blast Fragmentation Curves and Determination of Rock-Blast Domains at Coimolache Mine, Based on Rock Factor Criterion and Kuz-Ram Model

    By Luis Huaroc, Augusto Sotomayor, Erick Rodriguez, Paulo Fernández, José Ricaldi, Luis Alejandro

    The application of the Kuz-Ram model for the prediction of fragmentation is used worldwide, in Coimolache Mine it was used to determine blast domains and optimize the process by obtaining drilling pat

    Feb 1, 2020

  • ISEE
    Optimization of Blasting Pattern in an Underground Coal Mine for Maximum Production with Minimum Roof Disturbance

    By R. Singh, M. Roy, D. Singh

    Success of a blasting pattern in Blasting-off-the-solid (BOS) in Bord (Room) & Pillar method of coal mining is judged by the percentage of pull achieved vis-à-vis the yield of coal produced in a blast

    Jan 1, 2003

  • SME
    Optimization Of Block Height At The Luossavaara Mine ? Introduction

    By Dan Nilsson

    The Luossavaara "Research Mine" is the First large, offensive effort in mining research conducted by the Swedish state. Over a 5-year period, 1981-1985, the Swedish Mining Research Foundation works in

    Jan 1, 1985

  • SME
    Optimization of Borehole Layout in Upwards Medium‑Deep Hole Cut Blasting - Mining, Metallurgy & Exploration (2023)

    By Xianyang Qiu, Xiuzhi Shi, Chen Xie, Xiaofeng Huo, Yanhai Wang

    In upwards medium-deep hole cut blasting, many confinement effects exist due to the small number of free surfaces, which is mainly provided by an empty hole. If the cut blasting effect cannot meet exp

    Sep 7, 2023

  • ABM
    Optimization Of Building Ventilation For Gerdau Beaumont Meltshop Using Physical Fluid Dynamic Modeling

    By Jim Belous

    Fluid Dynamic Modeling (FDM) was used to develop solutions how to eliminate the fugitive emissions from the meltshop building and to comply with the EPA “6% opacity from the furnace operations” rule.

    Aug 17, 2017

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • SME
    Optimization of Cable Bolting Strategies at a Canadian Underground Mine

    By Efstratios Karampinos, John Hadjigeorgiou, Philippe Morissette

    "Ground support is a critical element in maintaining the stability of mining drives in deep and high stress mines. In challenging ground conditions, it is necessary to continuously explore ground supp

    Jan 4, 2018