Search Documents

Sort by

  • SME
    Optimization of Cable Bolting Strategies at an Underground Mine

    By E. Karampinos, P. Morissette

    "INTRODUCTION Ground support is a critical element in maintaining the stability of mining drives in deep and high stress mines. In challenging ground conditions, it is necessary to continuously explor

    Jan 1, 2018

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • CIM
    Optimization of Cemented Rockfill Practices for Sublevel Stoping Mining System

    By Muhammad Zaka Emad

    ABSTRACT: Sublevel stoping mining methods with delayed backfill employs cemented rockfill (CRF) as a backfill material. It is used in underground mines to achieve ground control and reduce wall slough

    May 1, 2013

  • SME-ICGCM
    Optimization of Chain Pillars Design in Longwall Mining Method

    By Kazem Oraee, Mehran Gholincjad, Navid Hosseini

    "Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the

    Jan 1, 2010

  • SAIMM
    Optimization of chromium precipitation from ferrochrome leach solutions

    By F. Ntuli, T. V. Nyangadzayi

    Chromium green is an essential metal with various applications in the paints, construction, electronics, and aerospace industries. The main source of chromium green is the carbo-thermic reduction of c

    Dec 11, 2024

  • SAIMM
    Optimization of Circuits for Pressure Leaching of Sulphide Ores and Concentrates

    "Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidizing agent. This work shows how the performanc

    Jan 1, 2016

  • CIM
    Optimization of clean coal specifications

    By L. X. Li

    Coking coal producers often encounter variations in clean coal quality when mining multiseam deposits containing coals with different washability and coking properties. This paper describes how, for a

    Jan 1, 2014

  • SAIMM
    Optimization of coal mine parameters to provide safe operation

    By A. M. Bryukhanov, A. G. Mnukhin

    The report states accident rates for gassy/dusty coal mines represented as an ergatic system "man – machine - environment" with further analysis by the method of conditional probabilities. A coal

    Jan 1, 2003

  • SME
    Optimization Of Coal Mine Ventilation Systems

    By G Luxbacher

    Computer simulation of mine ventilation systems is rapidly becoming an essential tool in mine planning and design. This paper examines the utilization of ventilation simulation techniques to evaluate

    Jan 1, 1977

  • AIME
    Optimization of Coal Mine Ventilation Systems (5bc092bb-d711-44b9-81d1-60e0e755b2ac)

    By R. V. Ramani, G. W. Luxbacher

    Computer simulation of mine ventilation system is rapidly becoming an essential tool in mine planning and design. This Paper examines the utilization of ventilation simulation techniques to evaluate t

    Jan 1, 1980

  • TMS
    Optimization of Coke Rate and Sinter Quality by Genetic Algorithm for Two-Layer Sintering of Iron Ore

    By Niloy K. Nath

    Two layer sintering by charging green sinter mix with normal coke rate in the upper layer and reduced coke rate in the lower layer, can substantially reduce the coke rate and also improve the sinter q

    Jan 1, 2003

  • SME
    Optimization Of Coking Coal Mining System In India - A Case Study

    By M. Jawed

    Coking coal reserves in India are distributed geographically in Giridih, Raniganj, East Bokaro & Jharia Coalfields (J.C.F.). 97% of prime coking coal in JCF coming through underground mines is credite

    Jan 1, 1989

  • IMPC
    Optimization of comminution circuit and mine-plant integration at Cerro Corona

    By Ronald Díaz

    "Cerro Corona is a porphyry ore with different geometallurgical units and alterations produced by an extensive family of geological failures that have determined a special type of mineralization. With

    Jan 1, 2014

  • SME
    Optimization Of Conditioning Parameters In Phosphate Flotation Using Statistical Design

    By Michael Fahey, Ravi M. Damodaran, Brij M. Moudgil

    The flotation behavior of Florida phosphates was studied using statistical design of experiments to evaluate conditioning parameters and their effect on flotation performance. The solids loading, cond

    Jan 1, 1995

  • SAIMM
    Optimization of Conditions for the Preparation of Activated Carbon from Olive Stones for Application in Gold Recovery

    By M. Louarrat, G. Enaime, A. Yaacoubi, A. Baçaoui, J. Blin

    "The purpose of this study is to prepare a new activated carbon from olive stones for use in gold recovery by carbon-in-leach (CIL) and carbon-inpulp (CIP). The preparation method chosen was physical

    Mar 1, 2019

  • TMS
    Optimization of Continuous Slag/Matte Separation in Mitsubishi Process by Using Numerical Heat and Fluid Flow Analysis

    By Akira Kaneda, Nozomu Hasegawa

    "In the Mitsubishi Continuous Copper Smelting and Converting Process, slag/matte mixture overflowed from the smelting furnace is separated continuously in an electric furnace (slag cleaning furnace, C

    Jan 1, 2000

  • SME
    Optimization of Costs for Trackless Mining Ventilation and Cooling Systems

    By C. A. Rawlins, P. Rostami

    "Ventilation systems are not only an integral part of any underground mine design but are a significant contributor to the mine’s capital and operating costs. The ventilation and cooling design system

    Jan 1, 2015

  • CIM
    Optimization of Cu SX by Control of the Acidity

    By B. Grinbaum

    The solvent extraction of Cu from acidic leach solutions is carried out using oxime extractants. The mechanism can be described as liquid ion exchange, where a labile H+ in the oxime replaces Cu++ ion

    Jan 1, 2007

  • SAIMM
    Optimization of Cut-Off Grades Considering Grade Uncertainty in Narrow, Tabular Gold Deposits

    By C. Birch

    "Mineral reserve statements as well as optimizing mine planning require a block model with grades for each mining block. A cut-off grade is determined by considering the mining costs as well as the ex

    Jan 1, 2017

  • SME
    Optimization of Cut-off Grades for Molybdenum and Tungsten Open-pit Mines

    By Qiong Wu, Qinghua Gu, Yichuan Lv, Jin Yuan, Caiwu Lu

    "The cut-off grade is one of the important parameters of mining production. Different material cut-off grade is directed to different destinations. Based on reasonable and optimal cut-off grade, long

    Jan 1, 2017