Search Documents

Sort by

  • SME
    Optimization of Mining Engineering Design in Mineral Valuation (9a258bae-8110-4533-be16-8c0353f895d2)

    By H. M. Wells

    It is with great pleasure that I read Mr. Howard M. Wells article in the Decmenber 1978 issue of MINING ENGINNERING entitled: Optimization of Mining Engineering Design in Mineral Valuation."

    Dec 1, 1978

  • SME
    Optimization Of Multigravity Separation For Recovery Of Ultrafine Coal

    By M. Menéndez

    Enhanced gravity separation appears to be one of the most promising methods for processing all types of <200-µm coal feeds and tailings. Systems based on this technology are reviewed, and the results

    Jan 1, 2007

  • SME
    Optimization Of Multistage Circuits For Gravity Concentration Of Heavy Mineral Sands

    By T. J. McKeon

    Gravity separators such as spirals are commonly used in multistage cleaning and scavenging circuits to improve the quality and recovery of concentrates produced in the industrial minerals industry. Un

    Feb 1, 2012

  • SME
    Optimization of Oil Sands Conveying Through Field Measurements

    By James E. McTurk, Sheldon B. Bland, Roger E. Melley

    During the first fifteen years of operation at the Syncrude facility in northern Alberta, numerous improvements have been made in the field of ore conveying. The unique nature of the material conveyed

    Jan 1, 1993

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • SME
    Optimization of Operational Parameters to Improve Bioleaching of Arsenic from Mine Tailings in Continuous Stirred Tank Reactors

    By I. Casasbuenas, K. A. Nguyen, E. I. Ngoma, H. Kim, D. Borja, J. H. Park, R. A. Silva, S. Choi

    "This study aimed to determine the optimum operating parameters of a continuous bioleaching system to leach arsenic (As) from mine tailings using a mixed mesophilic bacterial culture. The microbial co

    Jan 1, 2018

  • IOM3
    Optimization of ore pass spacing in vein deposits

    By J. Cech

    Discussion is presented of a decision-making support method for the spacing of ore passes along a long vein orebody and the division of the orebody into convenient stopes for future mining operations.

    Jun 18, 1905

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada&apos;s largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • DFI
    Optimization Of Pile Length Using Decision Analysis With Information From Load Tests During Construction

    By Jiun-Yih Chen

    Pile load tests are regularly used to verify pile capacities. Sometimes, they are used to optimize pile designs. This paper presents a case study based on a real project, in which the information ob

    Jan 1, 2009

  • IMPC
    Optimization of Plant Performance at North American Palladium’s Lac Des Iles Mill Using Integrated Metallurgical and Mineralogical (Qemscan) Testing

    By Chris J. Martin, Nichola A. McKay

    "In mid-2001, North American Palladium commissioned a new 15,000 tonnes per day milling and flotation circuit at their Lac des Iles Mine (LDI), one of only two primary platinum group element (PGE) pro

    Jan 1, 2003

  • TMS
    Optimization Of Plutonium Electrorefining Through Modeling And Model Materials

    By A. Raraz

    The optimization of the plutonium electrorefining process has been studied on the basis of modeling and model materials. The plutonium electrorefining process has been reviewed and the basics of the e

    Jan 1, 1995

  • SME
    Optimization Of Power For Off-Highway Haul Units

    By G. T. Lineberry

    Horsepower requirement is recognized as a most important equipment characteristic. Other critical equipment characteristics will be isolated and analyzed by traditional operations research techniques,

    Jan 1, 1984

  • CIM
    Optimization of POX-CIL Process for Refractory Gold-Bearing Concentrates Treatment

    By Y. Y. Yemelyanov, S. S. Gudkov, A. V. Boldyrev, A. V. Bogorodskiy, S. V. Balikov

    "A series of tests to optimize pressure oxidation- carbon-in-leach process (POX-CIL) of goldbearing flotation concentrate with the addition of sodium chloride and activated carbon were carried out. Fl

    Jan 1, 2016

  • TMS
    Optimization of Preparation of U3O8 by Calcination from Ammonium Diuranate Using Response Surface Methodology

    By Bingguo Liu, Daifu Huang, Jinhui Peng

    "The conditions to prepare U3O8 by calcination from ammonium diuranate were optimized, and the response surface design method was applied to analyze the influence on the total uranium and U+4 of calci

    Jan 1, 2011

  • CIM
    Optimization Of Proceeds in Changing Market and Mining Conditions

    By Stanley G. Butcher

    Predictions of coal cleaning plant performance from the washability data are traditionally used at the conceptual design stage of a coal preparation plant to confirm process selection. The development

    Jan 1, 1979

  • IMPC
    Optimization of Process Conditions for Recovery of Additional Clean Coal from Tailing of Flotation Circuit of an Existing Coking Coal Washery of India Using Response Surface Methodology.

    By Sanjay Chaudhuri, V. K. Kalyani, Pradeep Kumar Singh, T. Gouri Charan

    "Indian coal industry is the world's third largest in terms of production and fourth largest in terms of proven coal resources. Indian coal deposits are generally of high ash content varying from 24 t

    Jan 1, 2018

  • TMS
    Optimization Of Process Efficiency In Cerium Electrorefining

    By A. G. Raraz

    Reactive metal electrorefining presents a number of problems that pose obstacles to commercial operation. Cerium has been chosen as the surrogate for certain reactive metals because of its thermodynam

    Jan 1, 1992

  • AIME
    Optimization Of Process Parameters For A Continuous Copper Cementation System

    By L. Ibagos S., T. Balberyszski

    The volumetric flow rate and the initial concentration of the copper sulfate solution influence the rate of reaction and, hence, the precipitation efficiency in a continuous launder cementation system

    Jan 1, 1973

  • CIM
    Optimization of Process Variables During TLP Bonding of Nickel Superalloys

    By M. Medraj, M. A. Arafin, D. P. Turner, P. Bocher

    In this study, the kinetics of isothermal solidification during TLP bonding of Inconel 625 and 718 superalloys with nickel based multi-component filler alloy BNi-2 have been studied through a combinat

    Jan 1, 2006

  • SME
    Optimization Of Pyrite In Mine Waste Backfill

    By Barry J. Hansen, Ruston A. Ford

    Production of mine backfill from the tailings produced in a proposed Crandon concentrator is described. A process has been developed capable of producing suitable fill for the mining method selected f

    Jan 1, 1981