Search Documents

Sort by

  • ISEE
    Optimization of Up Raises from Blind-Hole to Multiple Blasting Events Methodology

    By S. Gajardo, E. Valdés Guerra

    Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to

    Jan 1, 2024

  • SME
    Optimization of ventilation and cooling systems at Sunshine mine's Kellogg operation

    By R. S. Jurani

    Sunshine Mining Co.'s Kellogg operation is the primary silver producer in the US. Maintaining a comfortable working environment in this deep underground mine historically has been a complex and c

    Jan 1, 1988

  • SME
    Optimization Of Ventilation And Cooling Systems Of Sunshine Mine's Kellogg Operation

    By R. S. Jurani

    Sunshine Mining Company's Kellogg operation is the primary silver producer in the United States, and maintaining a comfortable working environment in this deep underground mine historically has b

    Jan 1, 1987

  • SME
    Optimization Of Ventilation Control Device Locations And Sizes In Underground Mine Ventilation Systems

    By X. Wu, M. Karfakis, E. Topuz

    The generalized ventilation network problems encompassing both natural and controlled splitting networks, is formulated using a nonlinear nonconvex programming model, which has not yet been solved sat

    Jan 1, 1991

  • SME
    Optimization Of Ventilation Parameters In A Continuous Mining Section Employing Exhaust Ventilation And An Underboom Scrubber

    By L. Xu, S Jones, R. Bhaskar, J. McKenzie

    The objective of this project was to optimize the ventilation parameters of a continuous miner underboom scrubber. This would result in further control of the amount of airborne dust discharged during

    Jan 1, 1994

  • SME
    Optimization Of Ventilation Parameters In A Continuous Mining Section Employing Exhaust Ventilation And An Underboom Scrubber (788e0823-bf3c-4de2-b35c-c6581d65a72c)

    By R. Bhaskar

    The objective of the project was to optimize the ventilation parameters of a continuous miner underboom scrubber to further control. the amount of airborne dust discharged during mining, to further re

    Jan 1, 1994

  • CIM
    Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions

    By Raymond Philippe

    Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the

    May 1, 2009

  • SME
    Optimization of water usage is critical for mine productivity and sustainability - ME Feature Article

    By Brian Hays, Victor Mwaba

    Optimization of water use has become a top priority for virtually every mining operation. The mineral extraction process typically requires vast quantities of water, which can be particularly challeng

    Apr 1, 2026

  • SME
    Optimization Of Waterjet Systems For Mining Applications

    By James M. Reichman

    Waterjet assist of mechanical cutters has been demonstrated in a variety of laboratory studies as well as on field equipment. As this technique becomes more widely accepted, it will be necessary to de

    Jan 1, 1985

  • TMS
    Optimization On Drying Of Cucl Residue By Hot-Air Using Response Surface Methodology

    By Jiang Feng, Zhang Libo, Peng Jinhui, Guo Zhanyong, Ju Shaohua, Lei Ting

    The clean utilization of the residue containing chloride, CuCl residue, produced from zinc hydrometallurgy is very important for the recycle of valuable metals. And drying is the main process in recyc

    Jan 1, 2015

  • SME
    Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and Equipment

    By J. Herhold, S. Plaum

    The focus within the economical optimization of projects, which are conducted underground, shifts more and more towards the conduction of construction work underground. Underground operations can be d

    Jan 1, 2019

  • SME
    Optimization Procedures in Mineral Processing Plants

    By Andrew L. Mular, Richard R. Klimpel

    Optimization strategies of possible interest to mineral processing are reviewed and typical strategies initiated in processing plants to date are discussed. Both On-Line and Off-Line optimization proc

    Jan 1, 1991

  • SME
    Optimization process of refractory gold ore extraction by hypochlorite oxidative leaching

    By SUHAINA ISMAIL, NORLIA BAHARUN, SHAIK ABDUL RAHMAN, WAN NUR SYAFIQAH ANUAR, MOHAMMAD REZAEI ARDANI

    Refractory gold ore contains sulfide minerals like pyrite, chalcopyrite and sphalerite that are difficult to be directly leached by cyanidation or by lixiviants such as thiourea and halides. In such c

  • SME
    Optimization Process of the Refractory Gold Ore Extraction by Hypochlorite Oxidative Leaching "Mining, Metallurgy & Exploration (2021)"

    By SUHAINA ISMAIL, NORLIA BAHARUN, SHAIK ABDUL RAHMAN, WAN NUR SYAFIQAH ANUAR, MOHAMMAD REZAEI ARDANI

    Hypochlorite leaching system is a strong oxidizing solution for metal sulfides, which are naturally associated with gold extraction. This study evaluated the hypochlorite leaching of refractory gold o

    Jan 8, 2021

  • SME
    Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA‑II

    By Aijuan Zhang, Liang Zhao, Yutao Wang, Yu Bao

    In the green backfilling mining of underground coal mines, gangue in a coal seam is used to replace and fill goafs. However, the gas drainage time changes in the amount of gangue output and order in t

    May 23, 2022

  • SME
    Optimization Program For Ore Beneficiation Flow Sheets

    By Paul Javor

    Optimization of a process is achieved by selecting, 'from all the known options, the most beneficial method of obtaining a product. It is rare that the optimum process is arrived at by convention

    Jan 1, 1971

  • TMS
    Optimization Research Of Peritectic Steel Mold Flux With Co₂O₃ Doping

    By Wan Entong, Xie Junlin, Jiann YangHwang, Yang Chengwei, Chen Junfu, Zhang Jianjun, Cao Tongyou, He Feng, Peng Zhugang, Fang De

    During the solidification process of peritectic steel (PS), the peritectic reaction often causes volume contraction which associated with surface longitudinal cracks, and using mould flux with low hea

    Jan 1, 2015

  • SME-ICGCM
    Optimization Research on Flexible Shield Supports Mining Method in Steeply Coal Seam

    By Bingjie Huo

    "China is a major coal producer and consumer. It is necessary to mine the steeply pitching coal seams due to development of the coal industry to meet the increasing needs for coal. Flexible shield sup

    Jan 1, 2010

  • IMPC
    Optimization Studies On Coal Bio-Flotation In Double Discharge Flotation Cell

    By A. Ghadyani

    This investigation was undertaken to assess the possibility of ash and sulfur removal by microbial action of high sulfur-content coal. Thiobacillus ferrooxidans and Thiobacillus thiooxidans have been

    Sep 1, 2012

  • SAIMM
    Optimization Studies on the Design of a Processing Plant for a Large Mining Venture

    By C G. Robinson, B. K. Loveday, J. C. Paynter

    "A method of optimizing the design of a processing plant has been developed which minimizes capital and operating costs for average stripping ratios and ore characteristics. Models were developed to d

    Jan 1, 2014