Search Documents

Sort by

  • SME
    Options And Costs For CO2 Reductions At Coal-Burning Utilities (43a94e5d-dcf4-4c2a-989b-7d75ffaa4ace)

    By Jr. Hawk

    The power generation industry may be required to reduce CO2 emissions if regulations related to global climate change are enacted. Coal-fired generation, which emits 82% of the power sector CO2, would

    Jan 1, 1999

  • IOM3
    Options for climate control during construction of large underground storage chambers

    During the construction of storage caverns, and during their lifetime if the use to which they are put so requires, it is necessary to provide adequate ventilation to ensure the safety and comfort of

    Aug 1, 1994

  • SME
    Options For Coal Firing For The Straight Grate Pelletizing Process

    By M. A. A. de Klaver

    Functional Description Figure 1 is a typical flowsheet for a system for solid fuel addition to filter cake. Solid fuel, coal, coal breeze, or charcoal, is fed from a,stockpile to a surge hopper. The s

    Jan 1, 1980

  • TMS
    Options For Complying With Water Quality-Base Metal Limitations

    By Jack Thibodeau

    During the past six years, most states have promulgated water quality regulations which contain numerical aquatic life standards for heavy metals. In addition, the Environmental Protection Agency (EPA

    Jan 1, 1996

  • AUSIMM
    Options for Concentrate Drying Technologies when Designing a Copper Smelter

    By H Lehtonen, H Mansikkaviita

    In primary copper smelters, the received copper concentrate and other materials contain a certain amount of moisture, ranging from six to 14 per cent. Moisture in wet concentrate has a negative effect

    Jan 1, 2006

  • AUSIMM
    Options for Incorporationg High-Pressure Grinding Rolls into Comminution Circuits

    By Weller KR

    A study of high pressure rolls grinding of a number of Australian ores and minerals has been carried out using a pilot-scale machine with rolls 300 mm diameter and 70 mm wide. The results from this

    Jan 1, 1991

  • TMS
    Options for Recycling the Fine Ni-Containing Waste in Ukraine

    By Vladyslav P. Yakubovsky, Boris I. Bondarenko, Valentin A. Noskov, Vladyslav M. Sokolov

    "Each of Ukrainian producers of ferronickel, stainless steel and synthetic diamonds has the same basic problem with recycling their fine Ni-containing secondary materials. The conditions for generatio

    Jan 1, 2008

  • CIM
    Options for Removing Arsenic and Talc from a Copper Concentrate

    By Damian Connelly

    The option to leach iron from low grade copper concentrates could reduce transport costs and significantly improve the saleability of the concentrate. In addition, it reduces smelting costs and can re

    Jan 1, 2019

  • CIM
    Options for the Separation of Rare Earth Elements

    By John R. Goode

    "This paper reviews options for the separation of a mixture of rare earth elements (REE) into its component elements. Earlier separations used selective chemistry such as double salt precipitation and

    Jan 1, 2016

  • SME
    Options for Treatment of Refractory Gold Ores

    By Hans von Michaelis

    This paper examines the process options available for treatment of "refractory" gold ores. As more and more of the easily leached oxidized gold ore zones are exhausted, the pressure is on to find mor

    Jan 1, 1993

  • AUSIMM
    Options in Research Oriented to Production Processes

    Interrelated data for five fundamental features of production processes would help promote the- development of the discipline and profession of extractive metallurgy. The features are the input ma

    Jan 1, 1986

  • AUSIMM
    Options in So2 Management in Gold Ore Roasting

    This paper explores options worthy of consideration in the management of S02 produced from the gold roasting operations at Kalgoorlie. Some of the options have relevance to other sources of SO2 in t

    Jan 1, 1992

  • SME
    Options to Control Acid Generation in Existing Pyritic Mine Waste Dumps

    By D. K. Gibson, A. I. M. Ritchie

    The phenomenon of acid drainage is likely to occur whenever pyritic rock is broken up, permitting access of air and water. The basic chemistry of the oxidation process is described by the equations be

    Jan 1, 1991

  • SME-ICGCM
    Options to Control Groundwater-Based Georisks along Geological Faults in the Large Scale Area of Influence of an Open Pit Mine

    By Markus Papst, Denise Millier, Daniel Beckers, Axel Preusse

    "At an open-pit lignite extraction mine in Germany, groundwater has to be pumped over a large area, which leads to subsidence at the surface. As long as the geology of the area of influence is homogen

    Jan 1, 2016

  • IMMS
    Options to Increase Economy of Deep-Sea Mining

    By T. Yamazaki, R. Arai, N. Nakatani, K. Kuroda

    "These 40 years, deep-sea mining for manganese nodules, cobalt-rich manganese crusts, and seafloor massive sulfides has been continuously business and R&D targets. The economy is the most important fa

    Jan 1, 2017

  • SME
    Options To Revegetate Neutralized Heap Leach Material

    By Leslie M. Burnside, Gene E. McClelland, Roy R. Cellan

    Revegetation of neutralized heap leach material in the arid environment of the Great Basin represents a challenge of avail­able technology. The chemical and physical environment of spent and neutraliz

    Jan 1, 1998

  • AUSIMM
    Optmization of Copper Electrowinning at High Current Densities

    A detailed study of the capital investment and production cost for copper electrowinning plants shows that significant savings in both can be achieved by increasing the current density. From the econo

    Jan 1, 1972

  • IOM3
    Opttimisation of development layyouts for retreat longwall mining with particular reference to the Australian coal mines

    By R D. Lama, A Misra

    One of the major factors restricting an increase in the productivity of a longwall mine is lower productivity obtained in a development panel. There has been a significant improvement in gate road dev

    Jan 9, 1996

  • CIM
    Opérations Minières et Concentration du Minerai du Lac Fire de Sidbec-Normines

    By Marcel Allard

    On January 1st, 1977, SIDBEC-NORMINES INC. purchased from Quebec Cartier Mining Company various facilities located at Gagnon and Lac Jeannine together with the Fire Lake deposit. A t the same time, SI

    Jan 1, 1979

  • SME
    Or In New Mine Planning - Introduction

    By J. J. Lewis

    In the mid-1970's a major new prospect was proved in a previously unworked region of North East Leicester- shire, United Kingdom. Preliminary estimates from borehole information showed over 500 m

    Jan 1, 1979