Search Documents

Sort by

  • SME
    Red Mountain No. 3 - Discovery Of The Ore Body, Ouray County, Colorado

    By James Matlock

    The announcement of a minable reserve of 13.6 Mt (16 million tons) averaging 0.9 g/t (0.027 oz per ton) Au and 2.4 g/t (0.71 oz per ton) Ag for the open pit-heap leach reserve at Red Mountain No. 3 in

    Jan 1, 1990

  • AUSIMM
    Red mud to green iron – proposed pathway for iron elution via bioleaching of bauxite residue

    By A Tolley

    Bauxite residue or ‘red mud’ is a by-product of the Bayer Process, the primary process of alumina refining. Due to its high alkalinity and variable composition, its storage and disposal poses high env

    Sep 18, 2023

  • CIM
    Red Rose Mine

    By A. W. Davis

    "The Red Rose mine is in the Rocher Deboule mountains about 8 miles east of Skeena Crossing and a like distance south of the town of Hazelton; the most northerly settlement on the Prince Rupert line o

    Jan 1, 1954

  • AIME
    Red, Yellow and Black Quicksilver Minerals

    By AIME AIME

    MANY producers have held that the only workable quicksilver ore is easily recognized by its .cinnabar content. In most cases this is true. A noticeable exception is a. particular opalite deposit where

    Jan 1, 1929

  • AUSIMM
    Redefining Competent Persons Criteria for Resource Geologists

    By J Coombes

    There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an

    Aug 18, 2014

  • SME
    Redefining Settlement Control Industry Standards with Modern Mechanized EPB Tunnelling - Eglinton Crosstown LRT Tunnel Case Study

    By A. Taghavi, I. Hassan, A. Solecki

    "The Eglinton Crosstown Light Rail (LRT) Project is part of an $8.4 billion investment to expand transit in the Toronto, Canada area and is the largest transit project initiated in Province’s history.

    Jan 1, 2016

  • AUSIMM
    Redefining the Scale of OHS Problems ù Meaning of Risk Through the Mining Project Life Cycle

    Optimisation of mining projects is directly related to effective and efficient management of risks through the life cycle of mining projects. Effective and efficient management of risks must include e

    Jan 1, 2003

  • SME
    Redefining the Ultimate Pit: Improving NPV by Factoring Scheduling into Design

    By H. Burton

    "The selection of the ultimate pit shell has a major impact on the overall value of a mining project. The size and shape of this pit drives the selection of pushbacks, equipment, and project strategy,

    Jan 1, 2015

  • ABM
    Redes Ópticas Passivas Em Substituição Ao Cabeamento Metálico No Ambiente Industrial

    By José Maurício dos Santos Pinheiro

    As redes de comunicação em cabeamento metálico são a imensa maioria nas plantas industriais. Entretanto, redes ópticas experimentam expansão nos ambientes industriais em substituição ao cabeamento met

    Aug 17, 2017

  • AIME
    Redesign And Construction Of A Tailings Dam To Resist Earthquakes

    By C. O. Brawner

    INTRODUCTION Tailings dams up to about 200 ft. high are proposed to store tailings for a major mining operation on Marinduque Island in the Philippines. The original design of the dam utilized a c

    Jan 1, 1972

  • TMS
    Redesign and Rebuild of the Pan Pacific Copper Flash Smelting Furnace

    By Glenn Stevens

    After 40 years of operation with the original design, Pan Pacific Copper determined it was necessary to rebuild the Saganoseki Flash Smelting Furnace to continue safe operation. The original design em

  • SME
    Redesign Aspects Of Lignite Mine Reclamation: A Case Study In Greece

    By M. Menegaki

    Restoration of abandoned mine sites is still one of the weak points of mining practice. The latter stands especially for the case of the surface coal and lignite exploitations, where the extended size

    Jan 1, 2005

  • CIM
    Redesign of Furnace No. 1 at the Pobuzhsky Ferronickel Combine

    By N. Novikov, M. Jastrzebski, N. Kryzhanovskaya, D. Shevchenko, I. Kapran, N. V. Novikov, T. Koehler, B. Zaporozhets

    "The PFK FeNi Smelter was re-commissioned by Solway Resources in 2002, ending a long period of economic decline in the adjacent town. In 2009 Hatch was retained to design, supply and install a custom

    Jan 1, 2012

  • AIME
    Redesign of the West Wall Kanmantoo Mine, South Australia

    By Barry K. McMahon

    Following minor slope failures at the commencement of mining the west wall of the Kanmantoo Mine was redesigned from an overall slope between haul roads of 55° to 46°. This decision was based on a pro

    Jan 1, 1983

  • TMS
    Redesigning The Flash Furnace Feed System At BHP Copper

    By D. J. Goodwill

    BHP Copper operates a 3,400 tpd dry concentrate, single burner, Outokumpu flash smelting furnace (FSF) at their San Manuel copper smelter in Arizona. The very fine (-325 mesh), dry concentrate is fed

    Jan 1, 1999

  • CIM
    Redesigning the Wheel: An Innovative Design that Enhances the Safety of Heavy Mining Vehicle Wheel Assemblies

    By L. Li

    To accommodate the large payloads and harsh operating conditions associated with heavy vehicles in the mining industry, off-the-road (OTR) tires are typically used with heavy mining vehicles. These ti

    Aug 1, 2013

  • DFI
    Redeveloping Toronto's Waterfront: Case Study of a Deep Secant Pile Cutoff Wall

    By Greg Stokkermans, Jim Hansen, Mary Kate Dempsey, Mark Reinders

    The City of Toronto is reshaping and revitalizing its waterfront in the largest ongoing urban redevelopment project in North America. The redevelopment includes naturalizing the mouth of the Don River

    Oct 31, 2023

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    Redevelopment of the Carnilya Hill Mine

    The Carnilya Hill Mine, a joint venture project between Western Mining Corporation Limited (WMC) and The Broken Hill Proprietary Company (BHP), is a nickel sulphide deposit being developed by the

    Jan 1, 1981

  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010