Search Documents

Sort by

  • CIM
    Refractory Wear in Nickel and Cobalt Processing Furnaces

    By B. Drew, K. Budna, C. Wenzl, D. Gregurek, A. Spanring

    "The metallurgy of nickel and cobalt and of copper is closely interlinked when processing sulfidic Ni-Co ores and Cu-Co ores. The respective furnaces are typically lined with magnesia-chromite refract

    Jan 1, 2017

  • AIME
    Refractory-Type Liners Wear Down Pump Maintenance Costs

    By John Bonar

    A switch to refractory-type slurry pump linings has significantly reduced maintenance costs arising from liner failure at a Missouri lead mill. The pumps routinely handle a slurry consisting of 79 to

    Jan 3, 1978

  • ABM
    Refratários Para Panelas De Aço: Uma Visão Holística

    By Roselaine Gonçalves Magalhães

    São apresentados e discutidos os aspectos teóricos e práticos relativos às principais propriedades físicas, térmicas e mecânicas de três refratários comerciais de MgO Al2O3 C e Al2O3 MgO C para a zona

    Oct 30, 2017

  • SME
    Refresh Your Equipment Replacement Decision-Making Skills

    By Roger S. Dewey

    1.1. INTRODUCTION Despite indications of a general economic recovery in the U.S. during the mid-19801s, mine operators have not generally shared in the benefits of these reported better times. Budge

    Jan 1, 1987

  • SAIMM
    Refrigeration And Ventilation Design For The Deepening Of Mindola Copper Mine

    By D. Noort, M. Dawborn, D. O. del Castillo

    This paper was originally presented at the North American/9th US Ventilation Symposium, June 2002, Kingston, Ontario, Canada. Reprinted with permission of the publishers, A.A. Balkema Publishers, Rott

    Jan 1, 2005

  • SME
    Refrigeration Economics At The Star Mine - Introduction

    By John R. Marks

    The recent trend in the ventilation of deep under- ground metal mines in the United States is to rely more and more on refrigeration for air cooling. This paper describes the layout and the economics

    Jan 1, 1980

  • SME
    Refuge alternatives relief valve testing and design

    By P. T. Bissert, T. J. Lutz, J. A. Yonkey, G. T. Homce

    "The U.S. National Institute for Occupational Safety and Health (NIOSH) has been researching refuge alternatives (RAs) since 2007. RAs typically have built-in pressure relief valves (PRVs) to prevent

    Oct 1, 2016

  • SME
    Refuge Alternatives Relief Valve Testing and Design (bc052d48-5a11-4c0c-9354-6518a302c701)

    By P. T. Bissert, T. J. Lutz, J. A. Yonkey, G. T. Homce

    "The National Institute for Occupational Safety and Health (NIOSH) has been researching refuge alternatives (RAs) since 2007. Refuge alternatives typically have built-in pressure relief valves (PRVs)

    Jan 1, 2016

  • SME
    Refuge Alternatives Relief Valve Testing and Design With Updated Test Stand

    By P. T. Bissert, T. J. Lutz, J. A. Yonkey, G. T. Homce

    "Underground refuge alternatives (RAs) require an air source to supply breathable air to the occupants. This requires pressure relief valves (PRVs) to prevent unsafe pressures from building up within

    Jan 1, 2017

  • SME
    Refuge Alternatives Relief Valve Testing and Design with Updated Test Stand (9e43a085-27e9-4b46-9823-dfa3417fad70)

    By P. T. Bissert, T. J. Lutz, J. A. Yonkey, G. T. Homce

    "Underground refuge alternatives require an air source to supply breathable air to the occupants. This requires pressure relief valves to prevent unsafe pressures from building up within the refuge al

    Jan 3, 2018

  • NIOSH
    Refuge Chambers

    By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent

    8. Refuge Chambers 8.1 Refuge Chambers - Technical Discussion 8.1.1 Introduction As a part of the overall escape system, refuge chambers can provide a last resort when existing escapeways are

    Jan 1, 1976

  • AUSIMM
    Refurbishment and Modernization - the Proven Alternative to Replacement of Large Materials Handling Equipment

    The process of refurbishment is not a precisely defined one. It is under- stood to mean an upgrading of a plant which is normally performed only once. The application of refurbishment in the field of

    Jan 1, 1989

  • DFI
    Refurbishment of a Piled Commercial Building

    By Eric Sturel, Ove Arup, Henry Tayler

    One Triton Square was originally a six­storey commercial building with a single level basement located within the Regents Place development near Euston, London. The building was a concrete frame, with

    Jan 1, 2024

  • DFI
    Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area

    By Henry H. Tayler, Eric Sturel

    1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat

    May 1, 2022

  • AUSIMM
    Refurbishment of Brisbane's Rail Tunnels for Electrification

    By Fejes G

    An integral part of the Brisbane Suburban Railway Electrification involved the relining, refurbishment and track lowering in the Roma Street, Brunswick Street and Gloucester Street double track tu

    Jan 1, 1981

  • AUSIMM
    refurbishment of Open Cut Equipment in SECV Mining Operations

    By Aalbers J. P A

    The State Electricity Commission of Victoria (SECV) operates 13 excavators, 3 travelling stackers and 4 mobile slew conveyors in their three open cuts in the Latrobe Valley. The majority of these m

    Jan 1, 1989

  • AIME
    Refuse Pile Design Considerations

    By Thomas J. Sawarynski

    This paper discusses current trends of coarse and fine coal refuse disposal techniques. Emphasis is on site-specific engineering used by coal companies to tailor safe, cost effective, and environmenta

    Jan 1, 1982

  • AIME
    Refuse Removal and Disposal

    By Leo J. Vogel, E. D. Hummer

    INTRODUCTION by E. D. HUMMER An efficient refuse-disposal system is a necessary part of the modem cleaning plant. The large-scale refuse system and disposal area, engineered for the lifetime o

    Jan 1, 1968

  • AIME
    Refuse Removal and Disposal (ddb80d83-4c18-4dac-921f-cf63f9782c9f)

    By Leo J. Vogel, E. D. Hummer, David J. Akers

    INTRODUCTION An efficient refuse-disposal system is a necessary part of the modem cleaning plant. The large-scale refuse system and disposal area, engineered for the lifetime of the plant, has bec

    Jan 1, 1979

  • SME
    Refuse Slurry Thickening And Dewatering

    By Kenneth A. Pietila

    The thickening and dewatering characteristics of refuse slurries are as variable as the coal mining operations and preparation plants that create them. This paper discusses these characteristics based

    Jan 1, 1984