Search Documents

Sort by

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings

    By Yates C, Gillie E. W, Finucane K. J

    During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka

    Jan 1, 1945

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings (8ea60644-b41a-4846-93fc-367236e8ddfb)

    Stope filling practice on the Great Boulder Mine was described in -a paper published in Aus.I.M.M., Proceedings No. 137, in 1945. When the paper was presented the process had emerged from the experime

    Jan 1, 1948

  • AIME
    Stope in Malagash Salt Mine, Nova Scotia

    By AIME AIME

    THE two illustrations below, furnished through the courtesy of J. P. Messervey, Deputy Inspector of Mines, Department of Public Works and Mines, Province of Nova Scotia, show a fourth-level stope in t

    Jan 1, 1932

  • AUSIMM
    Stope Optimisation Tools for Selection of Optimum Cut-Off Grade in Underground Mine Design

    By B Hall

    In feasibility studies the choice of optimum cut-off grade is typically based on an evaluation of tonnage grade curves and manual design of stopes at one or two cut-off grades. In the industry these s

    Jan 1, 2009

  • AUSIMM
    Stope Performance at Olympic Dam Mine

    By M J. Pascoe

    The performance of 460 stope surfaces at WMC ResourcesÆ Olympic Dam Operation (ODO) has been used to investigate the confidence that can be placed in the Stability Graph Method for design of stope dim

    Jan 1, 2005

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • ISEE
    Stope performance optimisation through the introduction of new underground bulk explosives technology

    By S. Evans, J. Phillips-White, D. Morton

    The partnership between Orica and MMG at the Dugald River Zinc mine in Australia has led to the first global field trials and deployment of Orica’s Subtek™ 4D™ (hereafter referred to as 4D) Bulk Syste

    Jan 1, 2024

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • SME
    Stope sequencing optimization for underground mines through chance-constrained programming

    By Mustafa Kumral, Yuksel Asli Sari

    Economic evaluations of underground mining operations are made based on the estimated or simulated grades of the block model as the actual values are not known. Depending on how the planning decisions

    Jan 1, 2024

  • SME
    Stope Sequencing Optimization for Underground Mines Through Chance‑Constrained Programming - Mining, Metallurgy & Exploration (2023)

    By Mustafa Kumral, Yuksel Asli Sari

    Underground mining operations are sensitive to price fluctuations because they usually perform with a narrow profit margin compared to open-pit mining. Furthermore, the economic evaluations regarding

    Aug 4, 2023

  • AUSIMM
    Stope Stability at the Big Gossan Skarn Deposit, Papua, Indonesia

    By G de Jong, W Sunyoto, K Sari, P Silalahi

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Big Gossan mine is operated by PT Freeport Indonesia and is one of the largest stope-an

    Mar 18, 2015

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • CIM
    Stope-and-Pillar Design for the Elliot Lake Uranium Mines

    By D. G. F. Hedley, F. Grant

    "In 1958, the Ontario Department of Mines appointed a committee to study the accident situation and mining methods used in the uranium mines in the E1liot Lake district. This committee reviewed the ex

    Jan 1, 1972

  • SAIMM
    Stope-face conveyors for gold mines

    By R. H. English, N. C. Joughin

    The results of trials with three stope-face cleaning systems are described. Two of these systems were based on armoured chain conveyors, and the third on a reciprocating-flight conveyor. The operation

    Jan 1, 1979

  • AUSIMM
    Stope-Survey Practice at Mount Lyell

    By Coulter L. J

    THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved

    Jan 1, 1915

  • SME
    Stopewall Closure And High-Modulus Backfill

    By Koehler Stout

    Stopewall or room closure can be a problem in nining operations. In some mines, wall closure causes ore passes and nanways to collapse when they are enclosed in nine fill. When this phe- nomena occurs

    Jan 1, 1980

  • AIME
    Stopewall Closure and High-Modulus Backfill (65c9b931-0145-4c86-8198-2e0724790337)

    By K. Stout, L. Friel

    Some rock mechanics theorists believe that if a hydraulically placed backfill can be introduced in a stoped out area, which will minimize wall closure by taking high stresses across the fill with mini

    Jan 1, 1983

  • CIM
    Stoping at Noranda

    By O. Hall

    STOPING at Noranda" is a sequel to "Mining at Noranda". "Mining at Noranda", presented in 1937 (1), sketches Noranda's history, metallurgical problems, exploration, mining methods, mining detail

    Jan 1, 1939

  • CIM
    Stoping at Noranda (efbe5f7d-1916-444f-8cbc-cd957324001f)

    By O. Hall

    DISCUSSION AT QUEBEC MEETING MR. A. V. CORLETT: With drill holes radiating from a common point, is loading carried to the collars, and do you undertake to distribute the powder evenly? MR. R. V. PO

    Jan 1, 1939

  • CIM
    Stoping from Pit Walls While Developing the Underground Mine at St. Lawrence Columbium

    By L. Ferland, D. LaRonde, J. C. Caron

    "The free-world production of columbium ore concentrates has doubled in the last five years. St. Lawrence Columbium and Metals. Corporation has contributed largely to this expansion, its production r

    Jan 1, 1967