Search Documents

Sort by

  • CIM
    Stope development for raise mining at the Namew Lake mine

    By D. Madsen, B. Salamondra, A. Moss, D. Etienne

    "Raise mining at the Namew Lake Nickel Mine in Manitoba uses 3 m diameter bored raises driven at 45 to 50 degrees dip for stope access and drilling. These raises are developed within the orebody on 20

    Jan 1, 1991

  • AUSIMM
    Stope Filling At Boulder Perseverance Shaft 1895-1972

    A short study showing how first dry fill and later hydraulic sand fill has allowed mining to continue immediately adjacent to worked out areas in a mine 75 years old. This paper is a case study of

    Jan 1, 1973

  • AUSIMM
    Stope Filling at North Mount Lyell Mine

    IN the irregularly shaped ore-bodies of the North Mount Lyell mine by overhead stoping, the method of filling the is a special feature.The situation of the mine two miles from the smelter and mill at

    Jan 1, 1927

  • AUSIMM
    Stope Filling at the North Mine, Broken Hill

    North Broken Hill Limited came into prominence as a producing mine at· the commencement of the present century, when a great many of the disabilities experienced in earlier mining operations th:r

    Jan 1, 1940

  • CIM
    Stope Filling at the Sullivan and Other Canadian Mines

    By James D. Hall

    THIS essay deals with the materials and methods used in the waste filling of scopes in Canadian mines, with especial reference co the methods used at the Sullivan mine, Kimberley, B.C. The author wo

    Jan 1, 1937

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings

    By Yates C, Gillie E. W, Finucane K. J

    During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka

    Jan 1, 1945

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings (8ea60644-b41a-4846-93fc-367236e8ddfb)

    Stope filling practice on the Great Boulder Mine was described in -a paper published in Aus.I.M.M., Proceedings No. 137, in 1945. When the paper was presented the process had emerged from the experime

    Jan 1, 1948

  • AIME
    Stope in Malagash Salt Mine, Nova Scotia

    By AIME AIME

    THE two illustrations below, furnished through the courtesy of J. P. Messervey, Deputy Inspector of Mines, Department of Public Works and Mines, Province of Nova Scotia, show a fourth-level stope in t

    Jan 1, 1932

  • AUSIMM
    Stope Optimisation Tools for Selection of Optimum Cut-Off Grade in Underground Mine Design

    By B Hall

    In feasibility studies the choice of optimum cut-off grade is typically based on an evaluation of tonnage grade curves and manual design of stopes at one or two cut-off grades. In the industry these s

    Jan 1, 2009

  • AUSIMM
    Stope Performance at Olympic Dam Mine

    By M J. Pascoe

    The performance of 460 stope surfaces at WMC ResourcesÆ Olympic Dam Operation (ODO) has been used to investigate the confidence that can be placed in the Stability Graph Method for design of stope dim

    Jan 1, 2005

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • ISEE
    Stope performance optimisation through the introduction of new underground bulk explosives technology

    By S. Evans, J. Phillips-White, D. Morton

    The partnership between Orica and MMG at the Dugald River Zinc mine in Australia has led to the first global field trials and deployment of Orica’s Subtek™ 4D™ (hereafter referred to as 4D) Bulk Syste

    Jan 1, 2024

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • SME
    Stope sequencing optimization for underground mines through chance-constrained programming

    By Mustafa Kumral, Yuksel Asli Sari

    Economic evaluations of underground mining operations are made based on the estimated or simulated grades of the block model as the actual values are not known. Depending on how the planning decisions

    Jan 1, 2024

  • SME
    Stope Sequencing Optimization for Underground Mines Through Chance‑Constrained Programming - Mining, Metallurgy & Exploration (2023)

    By Mustafa Kumral, Yuksel Asli Sari

    Underground mining operations are sensitive to price fluctuations because they usually perform with a narrow profit margin compared to open-pit mining. Furthermore, the economic evaluations regarding

    Aug 4, 2023

  • AUSIMM
    Stope Stability at the Big Gossan Skarn Deposit, Papua, Indonesia

    By G de Jong, W Sunyoto, K Sari, P Silalahi

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Big Gossan mine is operated by PT Freeport Indonesia and is one of the largest stope-an

    Mar 18, 2015

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • CIM
    Stope-and-Pillar Design for the Elliot Lake Uranium Mines

    By D. G. F. Hedley, F. Grant

    "In 1958, the Ontario Department of Mines appointed a committee to study the accident situation and mining methods used in the uranium mines in the E1liot Lake district. This committee reviewed the ex

    Jan 1, 1972

  • SAIMM
    Stope-face conveyors for gold mines

    By R. H. English, N. C. Joughin

    The results of trials with three stope-face cleaning systems are described. Two of these systems were based on armoured chain conveyors, and the third on a reciprocating-flight conveyor. The operation

    Jan 1, 1979

  • AUSIMM
    Stope-Survey Practice at Mount Lyell

    By Coulter L. J

    THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved

    Jan 1, 1915