Search Documents

Sort by

  • RMCMI
    Talent Wars - Crisis or Opportunities

    By Leigh Freeman

    The War for Talent ?McKinsey & Company 1997 and 2000 survey ?2001 book by Michaels, Handfield-Jones and Axelrod, Harvard Business School Press

    Jan 1, 2007

  • AUSIMM
    Talisker Mine, 1862-1872 Its History and Heritage

    Silver-lead ores are widely distributed through- out the Mount Lofty and Flinders Ranges, but none of the deposits is large. Historically the Glen Osmond Mines are the most significant as the site

    Jan 1, 1987

  • DFI
    Talking Dirty: How the Language We Use Affects the Foundation Industry

    By Ashley Shirer

    Have you heard a geotechnical engineer rail against using the word "dirt"? The typical maxim is: "It's not dirt, it's soil!" This axiom is so prevalent that it is joked about on the construction site.

    May 1, 2023

  • SME
    Talking Trash? – The RCRA Cleanup Reforms

    By M. N. Semenoff

    On July 8, 1999, EPA announced the RCRA Cleanup Reforms, a set of administrative reforms designed to achieve faster, more efficient cleanups. This paper will discuss the Reforms, the status of their

    Jan 1, 2001

  • ISEE
    Tall Structure Response to Close-in Urban Blasting in New York City

    By Cathy Aimone-Martin, Robert Brentar, Brent Meins, James Lauer

    Vibration measurements of multi-story structures in an urban environment began 3 years ago in New York City during close-in blasting to adopt correct measurement procedures and recommend revised groun

    Jan 1, 2014

  • ISEE
    Tall Structure Response to Close-in Urban Blasting in New York City – Part 2

    By Cathy Aimone-Martin, Caitlin Woznick, Brent Meins

    This study is a continuation of previous work in which the responses of tall structures to close-in construction blasting at two rock excavation sites are evaluated. A total of eight buildings were in

    Jan 1, 2015

  • IIMP
    Talleres de Intercambio con la ciudadanía: una herramienta social para incrementar el conocimiento mutuo

    By Germán Alva, Camilo Ferreira, Rómulo Villegas, Franco Olcese

    El siguiente documento presenta el caso de la realización de talleres participativos, voluntarios e inclusivos de consulta social con comunidades, centros poblados y ciudades del área de influencia di

    Sep 30, 2022

  • IMPC
    Talnakh Concentrator Modernization to Reduce Sulfur Dioxide Emissions from the Metallurgical Operations

    By V. Yu. Ivanov, A. I. Yuryev, L. S. Lesnikova, M. S. Datsiev

    "The Talnakh Concentrator was put into operation in 1981 using a direct selective process to produce copper, nickel and pyrrhotite concentrates.In 2001, a novel selective-bulk-selective (SBS) technolo

    Jan 1, 2018

  • SAIMM
    Talvivaara Bioheapleaching Process - Synopsis

    By P. Saari

    The Talvivaara deposits are located in Eastern Finland, within the Kainuu Schist Belt. These polymetallic sulphide deposits are of relatively low grade, but bioheapleaching enables economically profit

    Jan 1, 2012

  • TMS
    Tamano Refinery's new Processes for Removing Impurities from Electrolyte

    By Takaaki Shibata

    The Tamano Refinery has developed two new processes for removing the impurities, arsenic, antimony, and bismuth from an electrolyte. The first process involves bleeding the surface electrolyte in the

    Jan 1, 1987

  • NIOSH
  • SME
    Tamerlane Hoist And Vertical Belt Project

    By Shawn Collins

    BACKGROUND The history of the Pine Point Mine is a rich one. This property once boasted one of the largest and most profitable lead-zinc mines in Canada's long and storied mining history. The Pi

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • DFI
    Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock Construction

    By Roy Peratrovich

    An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti

    Jan 1, 1985

  • CIM
    Tank Cell Operation at Manibridge Mine

    By I. E. Wahn, E. A. Boutin

    "The Manibridge Mill is unique in its treatment of relatively high grade nickel-copper ore because in the mill design are included one 10' diam. x 10' Maxwell cell, and three 12' diam. x 12' tank cell

    Jan 1, 1974

  • AUSIMM
    TankCell Flotation at SamarcoÆs Germano Concentrators

    By B Murphy, A Uliana, P STrgio de Oliveira, G Ara·jo de Souza Franco, T Miettinen

    Outotec has performed numerous research and development projects and various surveys in the study of reverse iron ore flotation. Over the past four years their TankCell-70 and TankCell-160 flotation c

    Aug 12, 2013

  • TMS
    Tankhouse Expansion And Modernisation Of Copper Refineries Ltd., Townsville, Australia

    By B. Rourke, O&apos

    Copper Refineries Ltd. (CRL), Townsville is Australia's largest producer and exporter of refined copper cathode. This status has been maintained by the implementation of a significant capital wor

    Jan 1, 1999

  • TMS
    Tankhouse Mechanization: Automatic Grab Systems

    By Tom Marttila

    During the last few years, when a new tankhouse or a major modernization has been planned, automatic or semiautomatic crane and grab systems have at least been considered. It seems that in the future

    Jan 1, 1990

  • CIM
    Tankhouse modernization at CCR

    By J. Thiriar

    The electrolytic tan/chouse at CCR was recognized by management as lagging behind modem refineries in terms of productivity, energy efficiency and controls. The operation was also burdened by high mai

    Jun 1, 1993

  • CIM
    Tankhouse modernization at CCR (5da89055-e07e-468a-a039-0ab4f4658423)

    By V. Baboudjian, R. J. Geren, J. Thiriar

    "The electrolytic tankhouse at CCR was recognized by management as lagging behind modem refineries in terms of productivity, energy efficiency and controls. The operation was also burdened by high mai

    Jan 1, 1993