Search Documents

Sort by

  • SME
    Vermont/Hollywood Tunnel Project Los Angeles Metro Redline Contract B251 Development of the Main Work Site Los Angeles, California

    By Shelley M. Burg, Dennis K. Poulton, Robert B. Gordon

    This project includes the excavation and concrete lining of approximately 18 900 m (62 000 ft) of 5.5 m (18 ft) finished diameter subway tunnel for the Los Angeles MTA. The project required that four

    Jan 1, 1995

  • SME
    Vernal Mine: 19 Years Without a Lost-Time Accident

    By John B. Spencer

    Earlier this year, Simplot Phosphates achieved a safety milestone at its Vernal, UT phosphate operations. In March, the entire operation reached achieved seven years without a lost time accident. An

    Jan 1, 2004

  • RMCMI
  • SME
    Vernal Phosphate completes expansions and slurry pipeline without missing any concentrate shipments

    By J. R. Weber, R. D. Haddenham, J. H. Bailey

    Introduction The Vernal Phosphate Operation is located in northeastern Utah, about 18 km (11 miles) north of Vernal, about 280 km (175 miles) east of Salt Lake City, UT. The plant began initial op

    Jan 1, 1987

  • SME
    Vernal Phosphate Operations And Expansion ? Introduction

    By A. C. Alexander

    Chevron Resources Company owns and operates an open pit phosphate mine and mill 11 miles north of Vernal, Utah. The plant currently produces 500,000 tons per year of concentrate and has the capacity t

    Jan 1, 1985

  • AIME
    Versatility Highlights Bethlehem Steel Corp.'s Material Handling Equipment At Burns Harbor

    By V. Niemitz

    Approximately 30 miles east of Chicago on the southern shores of Lake Michigan stands Bethlehem Steels newest fully integrated steelmaking facility-the billion dollar Burns Harbor plant. The first p

    Jan 1, 1970

  • AUSIMM
    Versatility is the Name in Open Pit Drilling Equipment

    Traditionally, the predominant drilling method in open pit mining has been large hole rotary drilling using cumbersome, inflexible equipment offering merely limited scope for improvements in pit desig

    Jan 1, 2003

  • DFI
    Versatility of Compaction Grouting to Stabilize and Lift Large Structures

    By Joe Harris

    Large structures, such as a multistory office building or a large storage tank, are constructed the most economical way possible, which may involve a shallow foundation system placed on native soil or

    Sep 1, 2023

  • RMCMI
    Versatility of Online Coal Analyzers

    By Richard Woodward

    Presentation Outline ?What types of coal analyzers are there? ?What do they measure? ?How do they work? ?How accurate are they? ?Most common applications ?Sorting ?Blending ?Prep plant optim

    Jan 1, 2006

  • SME
    Versatility Of Roadheaders In Tunnel Construction

    By David Kwietnewski

    Roadheaders are gaining widespread acceptance in North America as a means for mechanical tunnel excavation. Until recently, almost all of the large-scale North American tunnel projects were excavated

    Jan 1, 2011

  • SME
    Versatility Of Roadheaders In Tunnel Construction (ebc2de43-3655-45e1-b3ea-308db1d22132)

    By D. Kwietnewski

    With all of the unknowns associated with tunnel construction, how does a contractor choose a roadheader? This paper presents a review of several models of roadheaders being used in today?s tunnel pro

    Jan 1, 2011

  • SME
    Vertical And Horizontal Distribution Of Zinc In Soils Overlying The Flat Gap Mine, Tennessee

    By Alan D. Hoagland

    The Flat Gap Mine is on Copper Ridge in the Appalachian Valley of East Tennessee, Large zinc orebodies occupy zones of solution and collapse breccias in lower Ordovician Kingsport limestone and dolomi

    Jan 1, 1962

  • AIME
    Vertical and Incline Shaft Sinking at North Star Mine

    By Arthur Foote

    AT THE end of the year 1914, the main North Star incline shaft had reached the 6300-ft. level, and encountered a vein dipping Southwest, or, exactly opposite to the North Star. Subsequent development

    Jan 1, 1930

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • DFI
    Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? Synopsis

    By G. Price

    The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less

    Jan 1, 2010

  • ISEE
    Vertical Attenuation of Blast Vibrations

    By Catherine T. Aimone-Martin, Brent Meins

    Blast vibration monitoring for buried pipelines is typically conducted at the ground surface with a shallowly buried geophone. In many jurisdictions across the U.S., blast-related vibration limits se

    Jan 1, 2019

  • DFI
    Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications

    By Michael E. Ameel

    The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co

    Jan 1, 2010

  • DFI
    Vertical Bearing Capacity of Pile Installed by "EX MEGATOP" Method - Base Enlarged Pre-boring and Grouting Method for Pre-cast Pile

    By Hitoshi Ogura, Koichi Kobayashi, Sadao Yabuuchi

    "In Japan, most pile foundations using pre-cast concrete piles are installed by the bored pre-cast piling method, wherein pre-cast piles are installed in holes that have been excavated beforehand and

    Jan 1, 2005

  • SME
    Vertical Belt System at Pattiki 2 Mine

    By Steve Crewdson

    High tonnage hoisting of materials by vertical conveyors through deep shafts is a relatively new concept in mining that is proving to be effective. The development of the Pocketlift® belt by Metso Fle

    Jan 1, 2004

  • SME
    Vertical Bench Slopes Used For Steeping Pit Final Walls

    By I. Melik-Gaykazov, N. N. Melnikov, V. A. Fokin, S. P. Reshetnyak

    Kola Mining Institute has been carrying out investigations of the possibility to steepen the walls of the Kovdor open pit with the design depth of 600 m. Steeping (up to 60°) wall angles is done by do

    Jan 1, 2003