Search Documents

Sort by

  • SME
    Waste Heap Reorientation By Explosive ? Introduction

    By W. A. Zingg

    Impervious zones in copper waste heaps create a problem in contacting the rock with leaching solutions. These zones are normally associated with compacted layers .formed on the surface of each lift by

    Jan 1, 1970

  • TMS
    Waste Heat Integration Potential Assessment through Exergy Analysis in an Aluminium Production Facility

    By Cassandre Nowicki, Louis Gosselin, Carl Duchesne

    "Quebec's primary aluminium production industry consumes roughly 39 TWh of electricity per year and is accountable for roughly 7 million tons of CO2 equivalent. By tapping only a small portion of wast

    Jan 1, 2012

  • TMS
    Waste Heat Recovery from Aluminum Production

    By Maria S. Gudjonsdottir, Miao Yu, Gudrun Saevarsdottir, Pall Valdimarsson

    Around half of the energy consumed in aluminum production is lost as waste heat. Approximately 30–45% of the total waste heat is carried away by the exhaust gas from the smelter and is the most easily

    Mar 1, 2018

  • TMS
    Waste Heat Recovery from Industrial Smelting Exhaust Gas

    By Geir Wedde, Anders Sorhuus

    "Vast quantities of energy are released as heat to the environment from industrial operations. Many countries target waste heat recovery to mitigate CO2 emission. Exhaust gases from industries such as

    Jan 1, 2012

  • TMS
    Waste Heat Recovery in the Aluminum Melting Furnaces

    By John Norton

    "This presentation will cover the physical properties of waste heat recovery. It is a two part presentation. The first deals with actually recovering the heat with new state of the art heat exchangers

    Jan 1, 2011

  • TMS
    Waste Heat Recovery Opportunities in a Magnesium Silicothermic Reduction Plant

    By James C. Sever

    "With the advent of high energy costs and increasing concern for the environment leading to the incorporation the C02 life cycle as a criteria for the material used in a finished product, it is benefi

    Jan 1, 2013

  • IMPC
    Waste Heat Recovery Possibilities In Sinter Plants And Adopting Hot Water Generation At Bhilai

    By T. S. Reddy

    Research and Development Centre for Iron and Steel (RDCIS) a unit of Steel Authority of India Limited (SAIL) is continuously engaged in reduction of energy consumption at SAIL plants by implementing i

    Sep 1, 2012

  • TMS
    Waste Heat Recovery Trial from Aluminum Reduction Cell Exhaust Gases

    By Reza Kamali, Mohsen Bashiri, Hadi Fanisalek

    "Half of the input energy to aluminum reduction cell will be lost as waste heat which could be studied for possible recovery. Since price of energy is increasing and the main production cost in primar

    Jan 1, 2011

  • TMS
    Waste Heat Recovery: Opportunities And Challenges

    By Ilona Johnson

    United States metals and non-metallic minerals manufacturing consume about 5,000 trillion Btu annually. Various studies estimate that as much as 20 to 50 percent of this energy is lost as excess or wa

    Jan 1, 2008

  • TMS
    Waste Heat Reduction and Recovery Options for Metals Industry

    By Arvind Thekdi, Cynthia Belt2

    "Waste heat from industrial operations in metals industry represents 20% to 50% of the total energy used in most manufacturing plants. Reduction and recovery of waste heat offers the most attractive a

    Jan 1, 2011

  • TMS
    Waste Heat Utilization to Increase Energy Efficiency in the Metals Industry

    By Jim Sarvinis, Rory Hynes, Elizabet Cruz, Kerry McKenna, Maytinee Vatanakul

    "Energy efficiency improvements achieved using heat recovery processes offer benefits to both the business case and environmental impact of metallurgical facilities. Global demand drives the developme

    Jan 1, 2011

  • AIME
    Waste Involved in Preliminary Investigation of Mineral Deposits

    By H. Foster Bain

    THIS subject is one that has attracted my attention for a good many years. All of us have had occa-sion to think of the waste that comes from the poor organization of our methods of finding mines and

    Jan 3, 1922

  • SME
    Waste Isolation In Salt Cavities

    By Larry Sevenker

    On the basis of favorable salt characteristics, primarily compressive strength and impermeability, solution-mined cavities can provide structurally stable isolation chambers for waste. Solution mining

    Jan 1, 1981

  • CIM
    Waste Land to Biofuel Source

    By Alan S. Lock

    Large scale feasibility studies for the establishment of oil-seed and cellulose producing crops on mine tailings have been successfully conducted over 1 growing season with the purpose of these crops

    May 1, 2009

  • CIM
    Waste Management and Energy Savings through Extraction of Valuable Metals: Copper, Nickel and Cobalt from Sulphidic Tailings of Golgohar Iron Mine, Iran

    By M. Askari, A. Ahmadi

    "This study was conducted to establish the possible application of bioleaching in the pilot scale to recover valuable metals from the sulfidic tailings of Golgohar Iron Mine (Kerman, Iran). Using biol

    Jan 1, 2017

  • TMS
    Waste Management And Impurities Control At Atlantic Copper Smelter & Refinery

    By G. Ríos

    Atlantic Copper Metallurgical Complex in Huelva (Spain) was commissioned in 1970 with a capacity of 40,000 tpy of copper from concentrate. In 1975 the old blast furnaces were replaced by the Outokumpu

    Jan 1, 2006

  • SME
    Waste management in Estonian oil shale industry

    By M. Lohk, Y. -. R. Pastarus

    Oil shale industry of Estonia provides a significant contribution to the country’s economy, but causes a large number of different problems. In spite of high economical parameters of the current under

    Jan 1, 2011

  • CIM
    Waste Management in the Golgohar Mining & Industrial Co. by Identifying and Extracting Industrial Minerals in Dry Tailings Mineral Processing Lines

    By H. Nouranian, M. Askari

    GOLGOHAR Mining & Industrial Co., with annual production of 16 million tons, is one of the largest pelletizing and iron ore supplier in Iran that recently this year, because of using mineral processin

    Jan 1, 2017

  • SME
    Waste Management Planning at the Telkwa Coal Project, Telkwa, British Columbia

    By Jerry Demchuk, Allan Flemming, Stephan Day

    Luscar Ltd. is currently developing open pit mining plans for the Telkwa Coal Project. Most waste rock is predicted to be non-acid generating but a proportion (less than 20%) is potentially acid gener

    Jan 1, 2000

  • CIM
    Waste management: A materials management/product stewardship approach

    By Redhead Robert J.

    "In 1991, the Canadian Council of Ministers for the Environment (CCME) charged its Waste Management Task Group with developing a nationally coordinated strategy to measure, monitor, and achieve the ob

    Jan 1, 1996