Search Documents

Sort by

  • SME
    “Ma’aden” A New Saudi Arabian Thrust Into Gold & Minerals

    By A. E. Dabbagh

    Saudi Arabia’s mineral potential offers development target that compliment the national effort to diversify the income of this oil and gas economic based nation. Ma’aden, a joint stock company with pa

    Jan 1, 2000

  • CIM
    “Northern exposure” The Red Dog experience

    By Curtiss O. Ehrsam, M. Naseem Mian

    Alaska’s Red Dog Mine is strengthening its position within Cominco’s “Vision 2000”strategic plan by continually improving quality and quantity of production while reducing costs. Red Dog has evolved i

    Jan 1, 1996

  • TMS
    “One Step” Technology to Separate Copper, Zinc, Lead Form Iron in Metallurgical Slag and Pyrite Cinder: Part 2 - Pilot Test

    By De-qing Zhu, Jian Pan, Tie-jun Chun, Dong Chen, Yu Cui

    "A study of processing pyrite cinder and metallurgical slag using “one step” technology in strand grate - rotary kiln is presented, which aims to efficiently recover the valuable metals of iron, lead,

    Jan 1, 2011

  • CIM
    “Over the Hills and Far Away” Long Distance Slurry Pipelines in Mountainous Regions

    By Donald J. Hallbom

    "While pipeline hydrotransport is often the most economical way to transport large volumes of mineral concentrate, tailings, or fine ore slurry over long distances, it is in mountainous terrain that p

    Jan 1, 2006

  • ISEE
    “Seed Wave” Modelling to Prevent Vibration-Induced Damage to a Gas Pipeline

    By Gilberto Nunez, Ron Eastman, Hector Parra

    The prediction of blasting outputs has proven to be a sound engineering tool to provide a guideline for design improvement. It has also been demonstrated to be extremely useful in critical situations

    Jan 1, 2015

  • SME
    “Shake And Slip To Survive” - Tunnel Design

    By Drupad B. Desai, Bruce Chang, Jay L. Merritt

    This paper reviews difficult ground conditions encountered along the alignment of large-diameter sewage tunnels for the City of Los Angeles. It offers a detailed one-of-a-kind solution to a unique pro

    Jan 1, 1989

  • DFI
    “Special Application Of Micro-Piles” For The Construction Of A Bridge Well Foundation

    By Nagarajkumar BV

    Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu

    Nov 1, 2022

  • ABM
    “stamping Charger Com Automatismo” - Compactação Da Massa De Carvões - Estudo Teórico E Análise Prática Na Tkcsa

    By Yan Samuel Ferreira Junqueira

    A Coqueria de uma usina siderúrgica é responsável pela produção de coque e produção de vapor para geração de energia usando como matéria-prima uma mistura de carvões, o coque produzido é utilizado com

    Aug 1, 2018

  • ABM
    “state-of-the-art” Coking Technologies. Challenging Emissions At The Service Of The Environment: A Practical Brazilian Example

    By Antonio Esposito

    Saving energy and reducing pollution by minimizing emissions are today great challenges in the coking industry worldwide. In order to achieve satisfying results, equipment as well as technology should

    Aug 1, 2018

  • SME
    “The Dome” and the “Shaft” in the Castle Hill of Graz

    By Ralf Vergeiner

    The most famous landmark of the city of Graz (Austria) is the clock tower on the castle hill. An underground chamber was built as a multifunctional structure beneath this landmark. The required struct

    Jan 1, 2001

  • SME
    “They Want to Dig a 100-Foot Hole in Front of My House for Two Years!” - Community Mitigation and Outreach for DC Water’s First Street Tunnel

    By Carlton M. Ray, William P. Levy, Thomas Lindberg

    "The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District’s receiving waterbodies and m

    Jan 1, 2016

  • DFI
    “Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method

    By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi

    "The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,

    Jan 1, 2016

  • ABM
    “upgrade” Do Sistema De Controle Automax Em Um Laminador De Fio Máquina

    By Alexander Schultz Rizek

    O trabalho que será apresentado irá descrever o projeto realizado de atualização tecnológica do sistema de controle com controladores Automax instalado em um laminador de fio máquina de dois veios, a

    Jul 30, 2018

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    2025 OPA Winner: Lyrik - Air Rights Parcel 12

    By Marya Gorczyca, Damian Siebert

    Air rights projects are inherently challenging as they involve building in the "air space" above an existing structure. From a foundation engineering and installation standpoint there are numerous con

    Oct 1, 2025

  • DFI
    Engineering Solutions for Coastal Resilience in San Francisco Bay

    By Allison Digregorio, Muhammad Ali Naeem, Sam Yao, Joshua Core, Simpson Gumpertz

    The Potrero Power Station makes up approximately 1,000 ft (304.8 m) of shoreline on the east side of the San Francisco Peninsula between Pier 70 to the north and 23rd Street to the south. Beginning as

    Nov 1, 2025