Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analysis of ARMPS2010 Database with LaModel and an Updated Abutment Angle EquationBy Ihsan Berk Tulu, Ted Klemetti, Deniz Tuncay
"The Analysis of Retreat Mining Pillar Stability (ARMPS) program was developed by the National Institute for Occupational Safety and Health (NIOSH) to help the U.S. coal mining industry to design safe
Jan 1, 2019
-
Improving the Performance of the Hardy Cross Algorithm for Large Ventilation Models"The Hardy Cross algorithm offers a reliable method of solving network systems of fluid flow and has become widely used for solving water and ventilation flow networks. A limitation is that computatio
Jan 1, 2019
-
Effect of Geology and Mechanical Properties of Rock on Blast ResultsBy Ph. D. Favreau, Favreau Patrice B. Eng, R. F.
Geology is important in mining by helping to identify the rocks which contain sufficient valuable ore to justify their excavation. Geologists give a geological name to each rock type, so geology is a
Jan 1, 2019
-
A Case-Study of Roof Support Alternatives for Deep Cover Room-and-Pillar Retreat Mining Using in-Situ Monitoring and Numerical ModelingBy M. Sears, K. Mohamed, J. Addis, J. Wickline, G. Rashed
To better understand the load shedding and the stress transfer on coal pillars due to room-and- pillar retreat mining in deep cover panels, researchers from the National Institute for Occupational Saf
Jan 1, 2019
-
The Assessment of Aging Shaft Linings for Potash and Salt MinesBy S. Hopkins, J. Nolan, S. Gillis
"Cast in place concrete shaft linings have been used in many salt and potash shafts sunk in North America over the last 100 years. A large number of these shafts have exceeded their initial design liv
Jan 1, 2019
-
A Structured Approach to Conducting Site Risk ReviewsBy T. Gonzales, S. Thakurdin
The conducting of risk reviews is an essential activity in ensuring safe operating conditions, both during project design phases and for existing facilities. The following paper presents a structured
Jan 1, 2019
-
Application of Structural-Thermal Modelling to Negate the Need for Movement Joints within a Frozen Mine ShaftBy A. Pearson, Auld. F. A., S. O. Colbeck
"To minimise mine shaft maintenance over the long-term, some potash mine shaft sinking projects have required the provision of a continuous fully welded waterproof steel liner over a substantial depth
Jan 1, 2019
-
Digital Twin in Mineral ProcessingBy C. Cristonffanini, S. Nazari
"In the past, simulation was considered to be an offline tool disconnected from plant operation. Advancements in the computation power combined with utilizing physics and chemistry sciences have allow
Jan 1, 2019
-
Loading Characteristics of Mechanical Rib Bolts Determined Through Testing and Numerical ModelingBy Gamal Rashed, Zorica Radakovic-Guzina, Khaled Mohamed
"Underground coal mines use mechanical bolts in addition to other types of bolts to control the rib deformation and to stabilize the yielded coal ribs. Limited research has been conducted to understan
Jan 1, 2019
-
Algorithms for Adaptive Solutions: Essential Tools for Operational Blast OptimizationBy Sushil Bhandari, Amit Bhandari
Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field
Jan 1, 2019
-
Developing a Virtual Reality Environment for Mining ResearchBy J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich
DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen
Jan 1, 2019
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement ProjectBy Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Assessment of Analysis Techniques for Multi-Plate Anchors in SandBy James P. Hambleton, Anastasia Nally
This work focuses on the numerical simulation of multi-plate anchor systems (e.g., helical anchors) in sand subjected to vertical loading. In assessing the stiffness and capacity of these multi-plate
Jan 1, 2019
-
Economic Evaluation of Activated Carbon for Gold Milling Circuits ( CIM Journal | Vol. 10, No. 2, 2019)By M. Drozd, M. Somppi, Z. F. Yamak
"Activated carbon is used to recover gold in solution from various gold circuit designs including carbon-in-pulp (CIP), carbon-in-column (CIC), and carbon-in-leach (CIL) processes; however, the charac
Jan 1, 2019
-
Jet Grout Underpinning of Sensitive Structures in Urban EnvironmentsBy Alexander Ciccone, John H. Gill
Jet grouting is a highly versatile ground modification technique that can offer significant commercial and technical advantages over traditional concrete pit underpinning applications. Despite these a
Jan 1, 2019
-
Jet Grout Underpinning to Support the Waterman HospitalBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t
Jan 1, 2019
-
Jet Grouting for Strength in Marine Sediments with HydrocarbonsBy Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston
Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest
Jan 1, 2019
-
Installation and Efficiency of Common Helical Pile CouplingsBy Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019
-
Identification and Quantification of Pile RelaxationBy Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019
-
Today’s Connectivity: Using Historical Data to Anticipate Future RiskBy Michael Frawley, Deana Ruud, Jessica Turner
Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po
Jan 1, 2019