Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Best Practice Data Management for Extensometers at Australian Underground Coal MinesBy Scott Burchmore, Jason Emery, Michael Melville
This paper presents best practice data management for monitoring of extensometers in Australian underground coal mines. This work is based on the combined experience of the authors and the available l
Jun 25, 2024
-
Application of Statistical-Analytical Methods in Ground Control EngineeringBy Hamid Maleki
Rock mechanics models are “data-limited,” i.e., one seldom knows enough about a rock mass to use computational models unambiguously. Statistical methods, however, are capable of being applied where t
Jun 25, 2024
-
43rd ICGCM 2024 ORGANIZING COMMITTEEBy SME SME
List of 43rd ICGCM 2024 ORGANIZING COMMITTEE
Jun 25, 2024
-
Application and Effectiveness Measurement of Ground Consolidation Products in Longwall MiningBy Richard Campbell, MEHMET KIZIL, Ismet Canbulat, Serkan Saydam
The design and effectiveness of ground consolidation to regain stability of longwall faces vary widely and are often based predominantly on-site precedence or what were considered successful applicat
Jun 25, 2024
-
Standardised Testing and Assessment of Ground Consolidation Products and the Application of the DataBy Richard Campbell, Claire Pirona, MEHMET KIZIL, Ismet Canbulat, Stephen Giese, Ravindu Goonawardene, Edward Steed, Serkan Saydam
The Australian longwall mining industry spends millions of dollars per year on proactive and reactive ground consolidation applications across most of the operations currently in production. The desig
Jun 25, 2024
-
Ground Support Optimization Using a Structured Strata Management Process in Wide Set-up Room Roadways at West Elk MineBy Bob Munz, Ry Stone
To facilitate the installation of the longwall equipment for each extraction panel, West Elk mine develops set-up room roadways that are between 26.5 and 30.5 feet wide. Historically at the mine, the
Jun 25, 2024
-
Polyurethane Foam and Alternatives for Void Filling ApplicationsBy Delbert Hamilton, Christopher Snyder
In the last three years there have been four uncontrolled heating events in mines that have been attributed to the use of polyurethane foam as a void fill product. These heating events are due to the
Jun 25, 2024
-
Full NAT 2024 Proceedings - NAT2024By SME SME
NORTH AMERICAN TUNNELING 2024 PROCEEDINGS
Jun 23, 2024
-
Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024By Irwan Halim, Stephane Polycarpe, Brian Hann
The Narragansett Bay Commission Phase III CSO Program includes construction of the 11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview of the Desi
Jun 23, 2024
-
Long Haul TBM: Use of a Rebuilt Main Beam Machine at the DigIndy Tunnel System in Indianapolis, IN - NAT2024By Christian Heinz, Doug Harding
TBMs can last for decades and be rebuilt project after project with proper maintenance. How successful can rebuilt TBMs be? At the DigIndy Tunnel System in Indianapolis, Indiana, USA, a rebuilt TBM wa
Jun 23, 2024
-
Rehabilitation of the Rawah Ditch Tunnels - NAT2024By Ryan Marsters, Adam Pring
The Rawah Ditch is a mountainous water supply diversion which supplies Larimer County, Colorado with water since 1903. The ditch includes two historic tunnels excavated by drill and blast through a gn
Jun 23, 2024
-
To Swell or Not to Swell—Design of Underground Structures in the Presence of Swelling Clays - NAT2024By Daniel Maine
Swelling clay soils have been problematic to many types of infrastructure in the United States. However, their impact on underground construction is often misunderstood. The use of swell pressures in
Jun 23, 2024
-
Impact of High-Speed Operation on Tunnel Planning - NAT2024By Bernd Hagenah, Petr Pospisil, Colin Santangelo
This paper explores the profound implications of high-speed train operation on tunnel planning, specifically investigating ongoing high-speed rail projects in California and Texas. The paper delves in
Jun 23, 2024
-
Revolutionizing Australia’s Large Underground Infrastructure Projects with Digital Engineerin - NAT2024By Elnaz Saminfar, Jae Bateman, Eric Westergren, Mark Trim
This paper presents a case study of two major Australian infrastructure projects that used digital engineering to facilitate design delivery: WestConnex Project (Rozelle Interchange), and Sydney Metro
Jun 23, 2024
-
Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024By Rob Herr, Irwan Halim, Heather Marsh
This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap
Jun 23, 2024
-
Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila
The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th
Jun 23, 2024
-
XXL Pipe Jacking: Technological Aspects of Large-Diameter and Long-Distance Drives - NAT2024By Peter Schmäh
Pipe-jacked tunnels are considered for a large variety of applications from water and sewage, cable ducts to challenging pipeline crossings or landfall construction. In most cases, Slurry MTBMs are us
Jun 23, 2024
-
Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada
The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai
Jun 23, 2024
-
TBM Tunneling Between the Westridge Marine Terminal and the Burnaby Terminal in British Columbia - NAT2024By Jeff Reid, Mohamed Maghari, Nicholas Joens
The Burnaby Mountain Tunnel was an integral part of the Trans Mountain Expansion Project. General Contractor, Kiewit Ledcor TMEP Partnership (KLTP), contracted with McNally Construction to build an un
Jun 23, 2024
-
Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka
The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin
Jun 23, 2024