Search Documents

Sort by

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation

    By B Reid

    "Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This

    Nov 15, 2016

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Getting Accurate Mine Information to the Right Teams to Drive Production Improvement

    By T Elms, R Beckman, M Sampson

    "In today’s mining industry, the pressure of reducing costs and increasing production while maintaining high safety standards is at the forefront of operational endeavours. A combination of specific m

    Nov 15, 2016

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • IIMP
    El éxito de Compañía Minera Antamina basado en un modelo de gestión de planeamiento integrado

    By Juan Escala Abril

    El presente texto describe el éxito de modelo de gestión en planeamiento integrado aplicado por la mina Antamina. En ese sentido, se presenta un grupo de herramientas como los factores claves de éxit

    Nov 1, 2016

  • SME
    Dragline step change; Safer, greener and lower operating costs are possible

    By R. Adsero

    "A high altitude review of the state of the mining industry provided by a study of multifactor productivity shows a continuation of lower output year on year for the capital and labor inputs applied.

    Nov 1, 2016

  • SME
    Using lean six sigma techniques for projects at a Canadian uranium mine, mill

    By S. G. Britton

    "Strategies to improve performance in mining production, maintenance and mineral processing operations have evolved over time from straightforward time studies of individual machine performance in the

    Nov 1, 2016

  • AUSIMM
    KEYNOTE: Using Metallurgical Data to Drive Continuous Improvement

    By R Dunne

    "Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi

    Oct 10, 2016

  • AUSIMM
    Simplified Hybrid Semi-autogenous Grinding Mill Control – Explanation and Practical Results at the Porgera Concentrator

    By E Beltran, S Ngunz, F Orrante, F van Zyl, M Westcott

    "The primary control objective of the project is to achieve milling optimisation by ensuring that the energy available for rock breakage is used as efficiently as possible. This is achieved by increas

    Oct 10, 2016

  • AUSIMM
    The Simple Facts about Sampling Gold Ores

    By T Day, I G. Robertson, G J. Lyman

    "Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a

    Oct 10, 2016

  • AUSIMM
    Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa Mine

    By B Nielsen, H Lehto, B Musuku

    "The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo

    Oct 10, 2016

  • AUSIMM
    Application of an Integrated Liberation Leach Model for Process Optimisation

    By T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen

    "The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model

    Oct 10, 2016

  • AUSIMM
    Changing Trends in Column Flotation Use – Their Impact for Australian Mill Operators

    By D Frost, G Harbort, T Lipiec, N Deonarain

    "The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them

    Oct 10, 2016

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Global Mining Standards and Guidelines for Determining Comminution Circuit Efficiency

    By A Giblett, M Daniel

    "The Global Mining Standards and Guidelines Group (GMSG) currently supports nine individual industry working groups focused on developing standards and guidelines for the mining industry. In 2013 the

    Oct 10, 2016