  • AUSIMM
    Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper Project

    By R Godard, J Gantumur, F Prince, C Pascoe

    Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera

    May 9, 2016

  • AUSIMM
    The Social Psychology of Risk, Safety and Leadership Maturity

    By R Long

    The founder of social psychology is sometimes identified as Kurt Lewin. In a 1947 article, Kurt Lewin coined the term ‘group dynamics’. He described this notion as the way that groups and individuals

    May 9, 2016

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    The Evolution of Block Caving Technology

    By A J. Weston

    Block or panel caving technology is far removed from that of the top slicing and block caving of the late nineteenth or early twentieth centuries. The rapid mechanisation and expansion of these method

    May 9, 2016

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Determining the Open Pit to Underground Transition – a New Method

    By P A. Grossman, J H. Rubinstein, M Brazil, D Whittle

    Many ore reserves are harvested by a combination of open pit and underground mining methods. In these cases, there is often material that could be mined by either method, and a choice has to be made.

    May 9, 2016

  • AUSIMM
    Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving Mines

    By A D. Campbell, G R. Power

    The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d

    May 9, 2016

  • AUSIMM
    Understanding Rock Mass Behaviour through the Development of an Integrated Sensing Platform

    By E Widzyk-Capehart, C Hölck Teuber, S Steffen, V Rivero, O Fredes, E Sanchez, I Pedemonte, N Gonzalez

    This paper summarises the research, development and initial application of a sensing platform that has the potential to monitor subsurface deformations, pore pressure and other variables simultaneousl

    May 9, 2016

  • AUSIMM
    Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and Variability

    By S Rogers, D Stead, E Eberhardt

    The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus

    May 9, 2016

  • AUSIMM
    Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave Operations

    By G Chitombo, A Perryman, A D. Campbell, J White, B Hollis

    This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable

    May 9, 2016

  • AUSIMM
    Rehabilitation of the Collapsed Panel 1K North in the Deep Ore Zone Block Cave Mine

    By A Kurniawan, A Sjadat and M Akhasyah

    PT Freeport Indonesia’s Deep Ore Zone (DOZ) is a block cave mining operation that has been in production for 15 years. DOZ is located approximately 900 m below surface and has an average production ra

    May 9, 2016

  • AUSIMM
    From Face to Surface – a Fragmentation Study

    By A Gustafson, D Johansson, K Jonsson

    The underground mining process, from in situ characteristics of the unmined rock mass to the final mill product with fully liberated minerals, consists of a chain of unit operations. Some of them infl

    May 9, 2016

  • AUSIMM
    Cave Propagation and Open Pit Interaction at the Ernest Henry Mine

    By E Ah Mu and C R Lilley, A D. Campbell

    Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC

    May 9, 2016

  • SME
    Comparable mineral properties – do they exist for market value appraisals?

    By T. R. Ellis

    "In August 2013, the Appraisal Practices Board of the U.S. Appraisal Foundation issued its “APB Valuation Advisory #4 - Identifying Comparable Properties,” which contains analysis and examples that ma

    May 1, 2016

  • SME
    Annual Review 2015 Exploration Review

    By N. A. Karl, D. R. Wilburn

    "This summary of international mineral exploration activities for the year 2015 draws upon information from industry sources, published literature, SNL Metals & Mining (SNL) (Charlottesville, VA) data

    May 1, 2016

  • IIMP
    Planificación minera de largo plazo con el uso y aplicación de 5D Planner

    By John Quiñones de la Cruz

    Para tener éxito en el planeamiento de minado, es necesario establecer los requerimientos técnicos y metodólogicos para la automatización, la recolección, manejo y el análisis de datos geológicos e i

    Apr 1, 2016

  • SME
    Construction — You need risk-based cost estimating

    By A. Moergeli, Philip Sander, John J. Reilly

    "Estimating and managing the costs of complex infrastructure projects – in the planning/design and construction phases, for both owners and contractors – has been a challenge for decades. The more com

    Apr 1, 2016

  • SME
    Only the best of the best will be part of the WTC technical program

    "From April 22 to 28, the eyes of the tunneling and underground construction world will be on San Francisco, CA, as the world’s most influential underground construction industry leaders gather at the

    Apr 1, 2016

  • SME
    More than 6,300 attend SME Annual Conference & Expo

    By William Gleason

    "Despite the difficult economic climate for the mining industry, more than 6,300 people joined SME for its 2016 Annual Conference & Expo in Phoenix, AZ, Feb. 21-24.Nearly every commodity has been brui

    Apr 1, 2016