Search Documents

Sort by

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    Resources versus Reserves – Towards a Systems-based Understanding of Exploration and Mine Project Development and the Role of the Mining Geologist

    By J P. Sykes, A Trench

    "World-class mine projects are increasingly failing to become world-class mines. Non-technical, socio-political and environmental problems seem, in part, to be the cause. However, the intangible and q

    Aug 18, 2014

  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, Indonesia

    By A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana

    The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f

    Aug 18, 2014

  • AUSIMM
    Rapid Resource Modelling – A Vision for Faster and Better Mining Decisions

    By P F. Hodkiewicz

    "Our understanding of mineral resources relies on three basic steps: data capture data interpretation model construction. Until recently, all three of these steps required significant time and ma

    Aug 18, 2014

  • AUSIMM
    A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring Locations

    By J Loeb, D Thornton

    Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste

    Aug 18, 2014

  • AUSIMM
    Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel

    Aug 18, 2014

  • AUSIMM
    Mines versus Mineralisation – Deposit Quality, Mineral Exploration Strategy and the Role of ‘Boundary Spanners’

    By J P. Sykes, T C. McCuaig, J E. Vann

    Resources added to the global metal inventory through exploration over the past 15 years have been generally of poor quality (declining grades, recoveries and lack of acceptable financial return). Sim

    Aug 18, 2014

  • AUSIMM
    Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame Them

    By J Paradis, K Dudgeon, M Topping

    At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon

    Aug 18, 2014

  • AUSIMM
    Grade Estimation from Radial Basis Functions – How Does it Compare with Conventional Geostatistical Estimation?

    By P F. Hodkiewicz, J de Lacey, M Stewart, R Lane

    "Implicit modelling is an approach to spatial modelling in which the distribution of a target variable is described by a unique mathematical function that is derived directly from the underlying data

    Aug 18, 2014

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    The Future of the Global Mining Sector

    By T Goldsmith

    The mining industry is cyclical, but those are more than normal business cycles. In the early 2000s the industry saw the start of China as a game changer for the mining industry which lead to catch ph

    Aug 18, 2014

  • AUSIMM
    Scenario-based Project Evaluation – Full Mineral Value Chain Stochastic Simulation to Evaluate Development and Operational Alternatives

    By S Coward, S Jackson, S Moayer, J E. Vann

    The variability and uncertainty of mineralisation, coupled with subsequent uncertainty in mining and processing, is often paid scant regard or overlooked during the evaluation of mining projects. In m

    Aug 18, 2014

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    The Evolution of Diamond Drilling Practices at Olympic Dam

    By J Taylor, A Dubowik

    To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a

    Aug 18, 2014

  • AUSIMM
    The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western Australia

    By T Wellman, G Sternadt, R Hingston

    The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos

    Aug 18, 2014

  • AUSIMM
    Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation

    By R O’Sullivan, D Taylor, J G. McLellan, B Miller

    The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire

    Aug 18, 2014

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Modern Mining Geology

    By G Fahey, S Rose

    "Mining geology as a defined profession is only about 100 years old. The successful modern mine geologist needs to be a multidisciplinarian, but also needs to maintain a focus on the key outputs of th

    Aug 18, 2014

  • AUSIMM
    The Konongo Gold Project, Ghana – An Example of How Geology Makes All the Difference to a Resource Estimate

    By R Sterk, B Reid

    The Konongo Gold Project is located on the western margin of the 125 Moz Ashanti Gold Belt in Ghana, West Africa. It is situated 60 km along strike of the world-class mineral system at Obuasi and is i

    Aug 18, 2014