Search Documents

Sort by

  • SME
    Integration of a coal-mine emergency communication network into pre-mine planning and development - SME Transactions 2014

    By C. J. Bise, M. F. Sindelar

    Regulations, such as the MINER Act of 2006, require the installation of redundant and secondary communication systems to assure that contact can be established with coal miners who may become trapped

    Jan 1, 2014

  • SME
    Vibration effects on underground concrete structures - SME Transactions 2014

    By F. B. Kuhnow

    When performing blasting operations in open pit settings, energy is released and transmitted through the geology. Some negative effects can have significant impacts on mining operations and adversely

    Jan 1, 2014

  • SME
    Use professional judgment: Know the assumptions underlying a best practice - SME Transactions 2014

    By D. M. Abbott

    The problem with best practices occurs when they do not work. This happens when the seldom-stated assumptions underlying the practice are not met. This paper provides some examples for the mining indu

    Jan 1, 2014

  • SME
    Evaluation of various alternatives to optimize the ventilation network in a trona mine - SME Transactions 2014

    By R. Kramer, A. Habibi

    A ventilation survey was conducted in an underground longwall trona mine. The mine is relatively shallow and categorized as a gassy mine. The ventilation system includes three intake and six exhaust s

    Jan 1, 2014

  • SME
    Potential use of high-density backfill in Illinois Basin room-and-pillar coal mines - SME Transactions 2014

    By A. J. S. Spearing, T. Kostecki, D. Benton

    The use of paste backfill in room-and-pillar coal mines in the United States needs to be fully investigated. This paper discusses a series of physical tests that were conducted to examine the support

    Jan 1, 2014

  • SME
    Testing and analysis of cement foam materials for coal mine seals - SME Transactions 2014

    By K. M. Mohamed, R. K. Zipf

    The shear strength properties of generic cement foam material and cement foam/concrete interfaces were examined at three testing scales. In laboratory direct shear tests on specimens with average shea

    Jan 1, 2014

  • SME
    Surface mining technology: Managing the paradigm shift (2a69341b-ecb0-4c91-befb-69f1c2955c7d)

    By David De Lemos Pires

    Mining is essentially a materials management process where materials are classified, excavated, moved to a desired location, processed at a cost and sold for a price hopefully to generate a profit. ?

    Dec 1, 2013

  • AUSIMM
    Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals Industry

    By A Woodley, A N. Danoucaras

    In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2

    Nov 26, 2013

  • AUSIMM
    Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central Queensland

    By K White, R Hardie, J Merritt, B Kirsch, R Lucas

    Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res

    Nov 26, 2013

  • AUSIMM
    A Statistical Approach for Deriving Project Design Rainfall

    By R Millar

    A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically

    Nov 26, 2013

  • AUSIMM
    Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off Volumes

    By A Woodley, N C. Kunz

    A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate

    Nov 26, 2013

  • AUSIMM
    Fingerprinting and Signatures - Tracing Mine Impacts in Complex Aquatic Systems

    By C Bonini, A Markham, P Whittle, B Pearson

    "Mine-derived sedimentation in rivers can have significant impacts on the processes and features of the receiving environment and impact on communities reliant on this environment. However, identifyin

    Nov 26, 2013

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    A Robust Methodological Approach for Mine Site Water Accounting

    By N Collins, A Woodley, A N. Danoucaras, C McCombe, N C. Kunz

    Over the past decade, the mining industry has come to recognise the importance of water both to itself and to others. Water accounting is a formalisation of this importance that quantifies and communi

    Nov 26, 2013

  • AUSIMM
    Macroinvertebrate Tolerance across a Range of Conductivities in the Isaac River Catchment (Central Queensland)

    By L Stitz, S Kinnear, L D. Fabbro

    Sensitive and tolerant species of macroinvertebrates were present across a wide range of conductivity concentrations in the Isaac River catchment in Central Queensland, indicating the need for further

    Nov 26, 2013

  • AUSIMM
    The Practicalities of Implementing Net Volume Licensing of Water Use in Mines and Quarries - A Discussion Based on Victorian Case Studies

    By A Horne, Z Graszkiewicz, D Dettrick, R Evan, B Neal

    "Most of VictoriaÆs rivers and aquifers are already fully allocated or reaching full allocation. In regions without a well-established water market, access to water entitlements to facilitate new deve

    Nov 26, 2013

  • AUSIMM
    Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and Management

    By M Grigorescu, J H. Hodgkinson, H Alehossein

    A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and

    Nov 26, 2013

  • AUSIMM
    Water Accountability and Efficiency at a Base Metals Refinery

    By K G. Harding, A Osman, A du Toit, F K. Crundwell, C M. Sheridan

    "Most mineral processing plants have high water requirements for their operational activities. These plants often function in an environment where water is becoming increasingly scarce. An increase in

    Nov 26, 2013

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    The Fitzroy Aqua-Eco Health Project

    By C Sellens, L D. Fabbro, S Vink

    The Fitzroy River Aqua-Eco Health Project is a collaborative research project between the Central Queensland University, the University of Queensland and BMA. It is designed to assess the aquatic ecol

    Nov 26, 2013