Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Study on Controlling Losses of P2O5 from Phosphoric Acid Plant Using Pressure Filtration - Mining, Metallurgy & Exploration (2023)By Shilpa S. Haramkar, Bhaskar N. Thorat, Sachin V. Jadhav
The filtration of phosphogypsum is a ubiquitous step in the manufacturing of phosphoric acid. It is highly desired to achieve the minimum concentration of P2O5 in the phosphogypsum cake. This work is
Aug 23, 2023
-
Extraction of Critical Electronic Materials from Steelmaking Wastes - Mining, Metallurgy & Exploration (2023)By Michael Moats, Weston Hartzell
The stable domestic supply of gallium, indium, and germanium has been identified as a critical need for the USA. Electric arc furnace dusts processed to recover zinc produce a process residue that cou
Aug 8, 2023
-
Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof Under Deep Overburden: an Update - Mining, Metallurgy & Exploration (2023)By Mark Van Dyke, Ted Klemetti, Jake Beale, Zoheir Khademian, Joe Wickline
In 2016, a 3.7-ML magnitude event caused by mining activity occurred at a longwall mine in southwestern Virginia which was recorded by the United States Geological Survey (USGS) and felt by local resi
Aug 4, 2023
-
Mechanical activation and physicochemical factors controlling pyrometallurgical, hydrometallurgical, and electrometallurgical processing of titanium ore: A reviewBy A. S. Ratnayake, H. C. S. Subasinghe
In this study, we review the role of mechanical activation in the pyrometallurgical, hydrometallurgical, and electrometallurgical processing of titanium feedstock. Mechanical activation has been shown
Aug 3, 2023
-
Mechanism and control of deformation in gob-side entry with thick and hard roof strataBy I. Ngo, L. Q. Ma, J. S. Guo
Deformation of gob-side entries has always been a critical concern for ensuring stability in longwall coal mines. This paper addresses the significant deformation and support challenges that arise in
Aug 3, 2023
-
Grinding Contribution and Quantitative Separation of Impact and Grinding Mechanism in Cylindrical Mill - Mining, Metallurgy & Exploration (2023)By Zong‑yu Li, Shao‑jian Ma, Xiao‑jing Yang, Jin‑lin Yang, Xing‑nan Huo, Heng‑jun Li
Optimizing and adjusting the particle size composition of grinding products is of great significance for improving economic benefits and resource recovery and utilization. In this study, grinding cont
Aug 3, 2023
-
Online Analysis of Malachite Content in the Beneficiation Process Based on Visible-NIR Spectroscopy and GWO-SVM Algorithm - Mining, Metallurgy & Exploration (2023)By Weiran Zuo, Jinsheng Guo, Chun Yu, Jinyu Zhan, Bao Guo
High-precision prediction of the target minerals’ content in the feed and concentrate products is vitally important for the efficient beneficiation of mineral resources. Visible and near-infrared (NIR
Aug 3, 2023
-
In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case studyBy K Grohs, A Satriawan, S R. Pearce
Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi
Aug 2, 2023
-
Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvalsBy C Tomlin, C Gimber
Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation
Aug 2, 2023
-
Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPsBy L McCallum, G Dale, B Silverwood, T Roscoe, A Costin
The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres
Aug 2, 2023
-
Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals provinceBy A Harburg, A Dendys, G Green
Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope
Aug 2, 2023
-
Diavik Diamond Mine north country rock pile – an example of integrated mine planning for successful progressive reclamationBy G Stephenson, G MacDonald, A Yeomans, S Sinclair, V Knott
Rio Tinto has actively committed to progressive reclamation, concurrent with commercial operations, at its Diavik Diamond Mine. The most significant piece of progressive reclamation undertaken at Diav
Aug 2, 2023
-
Dynamic influences of optimisation on emissionsBy P J. Bangerter, J Pan
Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such
Aug 2, 2023
-
Getting your cut-off grade policy right for better ESG outcomesBy J D. Tolley
The shift towards clean energy technologies is having a significant impact on the mining industry, with the demand for minerals such as copper, nickel, cobalt, lithium, manganese, and graphite increas
Aug 2, 2023
-
Quantifying the influence of weathering on erosion and degradation of post mining landformsBy G R. Hancock, W D. D P Welivitiya
is placed in a waste rock dump, which is usually later reshaped to be erosionally stable, initiate and sustain vegetation and ultimately integrate with the surrounding undisturbed landscape. However,
Aug 2, 2023
-
The Mine Land Rehabilitation Authority – reducing risk for VictoriaBy R Mackay, J Brereton
On 30 June 2020, the Mine Land Rehabilitation Authority (the Authority) superseded the Latrobe Valley Mine Rehabilitation Commissioner as the independent overseer of Victoria’s declared mine rehabilit
Aug 2, 2023
-
Traceability of native seed for mine rehabilitationBy A Grant, H Thomas, C Clarke, B Fuller
Native seed and plants are often a core input into the rehabilitation process of mine closure. Native plant establishment rate and performance is a function of many input elements including seed quali
Aug 2, 2023
-
The role of the regulator in promoting a highly reliable mining industryBy S Johnston, L Howe, S Stevens
Regulators have an important role to play in fostering and enabling reliable, effective, environmental management. Given this, it is perhaps surprising that there has been relatively little debate on
Aug 2, 2023
-
Above and beyond NPV – determining the life-of-mine from an economic perspectiveBy C Tapia, B Hay
There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin
Aug 2, 2023
-
Making iron directly from concentrate by gaseous reductionBy H. Y. Sohn
The paper discusses two processes, flash ironmaking technology (FIT) and moving-bed ironmaking technology (MBIT), which aim to reduce energy consumption and greenhouse gas emissions in the ironmaking
Aug 1, 2023