Search Documents

Sort by

  • AUSIMM
    VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

    By K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy

    Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso

    Jul 15, 2013

  • AUSIMM
    Review of Metal Accounting Methods for In-Process Metal Inventories

    By L Lachance, F Flament, D Leroux, S GariTpy

    "Considerable metal values are often locked in stockpiles (ore, concentrates, heap leach pads, slags, reverts, etc.) and process equipment (bins, holding tanks, thickeners, etc.). This is more than en

    Jul 15, 2013

  • AUSIMM
    Project Delivery

    By E Skinner, G Lane

    Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and

    Jul 15, 2013

  • AUSIMM
    Gas Analysis - Linking the Laboratory with Reality

    By D Cliff

    Despite advances in technology, the Australian underground coal mining industry continues to have incidents involving spontaneous combustion. Managing these incidents relies heavily on understanding t

    Jul 1, 2013

  • AUSIMM
    Controlled Recirculation and Refrigeration at ValeÆs Taquari Potash Mine

    By S Bluhm, LádeáOliveira, R Funnell

    Taquari Vasouras potash mine (Vale Fertilizantes) has many interesting features including virgin rock temperatures of 50¦C at depths of 700 m. The mine has a relatively small shaft system with limited

    Jul 1, 2013

  • AUSIMM
    Ventilation Challenges Facing the Metalliferous Sector

    By D J. Brake

    The underground metalliferous mining industry continues to change under the influence of many factors including, to name a few, new mining techniques and equipment, new approaches to risk management,

    Jul 1, 2013

  • AUSIMM
    Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case Study

    By B Smith, R Gelson

    Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila

    Jul 1, 2013

  • AUSIMM
    Sunrise Dam Short- to Long-Term Ventilation Planning

    By M Podreka, P Merry, L van den Berg

    Anglo Gold AshantiÆs Sunrise Dam operation is located in Western Australia approximately 55 km south of the town of Laverton. Currently, the mine is producing from both its open pit and underground op

    Jul 1, 2013

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    The Influence of Inertisation Techniques on Gas Interpretation

    By D M. Brady

    Underground coal mines in Australia have embraced the use of various inertisation techniques both proactively and reactively. The use of such techniques can have a significant influence on ratios and

    Jul 1, 2013

  • SME
    Industrial Minerals Review 2012

    Editor?s note: Each year, Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the while doing their ow

    Jul 1, 2013

  • IIMP
    Responsabilidad social y minería en entornos rurales andinos

    By Iván Mendoza

    La Responsabilidad Social Empresarial (RSE) es una política que adoptan las empresas de manera voluntaria -en tanto relaciona las empresas mineras que instalan las unidades operativas y las poblacione

    Jul 1, 2013

  • AUSIMM
    Contract Considerations and Other Critical Ventilation Aspects in Achieving a New Mine Ramp Up

    By B Broad

    "Establishing ventilation in the early stages of a new mine is an essential step to achieve scheduled outcomes that ultimately drive the financial success of an operation. If the primary ventilation i

    Jul 1, 2013

  • AUSIMM
    Performance and Acceptance Testing of Main Mine Ventilation Fans

    By D J. Brake

    In most underground mines, the ventilation system is a significant portion of the total mine capital and operating cost and the largest consumer of underground electrical power. The effectiveness of t

    Jul 1, 2013

  • AUSIMM
    An Analysis of the Mixing of Air and Methane in the Stream Produced by the Mine Injector Station - Presenting Preliminary Results of Measurements and Modelling

    By J Janus, J Krawczyk

    Local accumulation of methane in workings of a longwall is one of the most common causes of mining accidents. This gas has many sources: it may leak from goaf through permeable sealings, or through ga

    Jul 1, 2013

  • AUSIMM
    After Blast Re-Entry Time for a Room and Pillar Operation

    By A Agasty, O Langefeld, MáKellner, E Clausen

    The lowering of the pollutant concentration limits at the workplace subjects the mining industry to higher requirements for dilution; this situation is worsened with the current discussions within the

    Jul 1, 2013

  • AUSIMM
    Cooling Pathways for Deep Australian Longwall Coal Mines of the Future

    By B Belle, M Biffi

    Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu

    Jul 1, 2013

  • AUSIMM
    Reduction in Diesel Particulate Matter at Oaky North

    By A Melloy, D Holt, M Jurak

    Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising

    Jul 1, 2013

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Fire Modelling in Underground Mines using Ventsim Visual VentFIRE Software

    By D J. Brake

    The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d

    Jul 1, 2013