Search Documents

Sort by

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • SME
    Coarse Particle Fracture With The Ultrafast Load Cell (November 2011 • Vol. 28 No. 4 )

    By E. T. Tuzcu

    Microscale information about single particle fracture can be incorporated into the macroscale model of the whole size reduction process in the mill. The ultrafast load cell (UFLC) device provides a su

    Nov 1, 2011

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    The Development of the Aircore Sampling System

    By J M. Wallis

    Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre

    Oct 5, 2011

  • AUSIMM
    The Use of Finite Element Modelling to Better Understand Electrostatic Separation

    By R A. Pax

    Electrostatic separation is a core requirement for the beneficiation of mineral sands suites to provide valuable product. Although the basis of electrostatic separation has been understood for some ti

    Oct 5, 2011

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AUSIMM
    Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, Australia

    By H Hoogvliet

    The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of

    Oct 5, 2011

  • AUSIMM
    Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

    By D Audeyev

    The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op

    Oct 5, 2011

  • AUSIMM
    Chemical Enhancement to Magnetic Separation for Effective Separation of Silicates from Titanium Phases at Finer Particle Size Fraction

    By S A. Ravishankar

    In heavy minerals separation, the titanium and iron oxide phases are separated from silicates in the coarser particle size range (80 - 150 mm) using magnetic and electrostatic separators. With the ong

    Oct 5, 2011

  • AUSIMM
    Environmental and Social Constraints to Mineral Mining Projects – Finding the Key to Unlock the Resource

    By A M. Avis

    This paper presents an overview of recent developments in the Environmental Impact Assessment (EIA) process to provide the background for a more detailed analysis of environmental and social constrain

    Oct 5, 2011

  • AUSIMM
    Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite Smelter

    By H Weitz

    Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo

    Oct 5, 2011

  • AUSIMM
    Dry versus Wet Magnetic Separation – Horses for Courses

    By J Elder

    Magnetic separation equipment has long been used to upgrade and beneficiate a wide variety of minerals and materials. Over the years, significant advances in both wet and dry magnetic separators have

    Oct 5, 2011

  • AUSIMM
    Geometallurgy in Mineral Sands Deposits – Linking Geological Artifacts to Metallurgy and Mine Planning

    By G Williams

    Somewhat to the surprise of many heavy mineral sands (TiO2 and zircon) producers, there are important geological structures within their typical placers and aeolian sands deposits that affect plant me

    Oct 5, 2011

  • AUSIMM
    Improvements on Estimation Tools and the Effect on Mineralisation Base Definition on the Zulti North Heavy Mineral Sand Deposit, Richards Bay, Kwa-Zulu Natal, South Africa

    By J M. Nel

    Richards Bay Minerals (RBM) has recently undertaken an exercise to improve orebody basal definition. Older mineralisation bases (pre-2005) were highly erratic using old protocol reverse circulation (R

    Oct 5, 2011

  • AUSIMM
    Influence of Saline Water on Electrostatic/High Tension Separation

    By P Ramsaywok

    The use of saline water for mineral beneficiation in arid regions is general practice and also the case with Exxaro Namakwa Sands, situated on the west coast of South Africa. Although it is ‘cost effe

    Oct 5, 2011

  • AUSIMM
    Mineral Sands Resource Security – Underpinning Market Share in a Global Growth Context

    By R Kjar

    Globally, it is anticipated that the mineral sands industry will enter a period of short supply. Demand for both titanium dioxide and zircon is forecast to continue increasing, with new projects neede

    Oct 5, 2011

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest Australia

    By E J. B van Etten

    Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys

    Oct 5, 2011

  • AUSIMM
    The Grande Côte Mineral Sands Project

    By M C. Ackland

    The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc

    Oct 5, 2011